4624591
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Journal Square bus lane C construction
2~ 1 year agocommentedCurlingMan13
♦53,417
Can you elaborate or link to references? What needs to be updated?
3~ 1 year agocommentedDaitruxdd
♦145
it was an NJ transit alert back from October of last year. it no longer appears on the site however it is currently unclear if construction is still going on. survey is needed. and if so bus relations should be modified to use the correct platforms
4~ 1 year agocommentedDaitruxdd
♦145
link is back online. bus relations should be updated to stop stop at the correct platforms; https://www.njtransit.com/station-advisory/1812350
5~ 1 year agocommentedCurlingMan13
♦53,417
It looks like you have been busy adding the relations? Also, please do not use ALL CAPS for bus stop names. https://www.openstreetmap.org/node/12539615447 https://wiki.openstreetmap.org/wiki/Names#Good_practice:~:text=or%20likely%20mistakes%3F-,Capitalisation,-Names%20are%20adapted
6~ 1 year agocommentedCurlingMan13
♦53,417
Also, the bus stops should be added to the relation for the JSTC.
7~ 1 year agocommentedDaitruxdd
♦145
NJ Transit has their bus stop names in all caps. I copy and pasted the names directly from their website to prevent making spelling mistakes and keep true to the source material.
8~ 1 year agocommentedDaitruxdd
♦145
Stage 3 Stating this week. Lanes A and B closed. https://www.njtransit.com/service-advisory/1933143
9~ 10 months agocommentedCurlingMan13
♦53,417
For whatever it is worth, and feel free to take part in the mess, but the buses are using the surrounding streets, specifically Pavonia as a bus stop/terminal instead of the lanes. I would encourage you to also update the relations. Also, make sure you are using the correct construction tags for temporary work.
10~ 8 months agocommentedCurlingMan13
♦53,417
Any update on this conversation that you're monitoring?
11~ 6 months agocommentedDaitruxdd
♦145
stage 4 is currently ongoing https://www.njtransit.com/station-advisory/1812350. I am in the process of redoing all the bus routes. will update them too once stage 4 is competed
12~ 1 month agocommentedCurlingMan13
♦53,417
closure for stage 4 is still on-going. Have you had a chance to update all the routes accordingly per the current travel situation? https://www.njtransit.com/station-advisory/1812350
13~ 1 month agocommentedDaitruxdd
♦145
stage 5 starts today https://www.njtransit.com/station-advisory/1812350
5093940
Category: Unknown
1~ 6 months agoopenedDaitruxdd
♦145
new bus terminal. https://www.njtransit.com/station-advisory/2017698
2~ 4 months agocommentedDaitruxdd
♦145
Lane 1: drop off Lane 2: 126 via Clinton St Lane 3: 126 via Washington St Lane 4: 87 Lane 5: 85
3~ 4 months agocommentedDaitruxdd
♦145
Lane 6: 89 Lane 7: 63, 64, 68 Lane 8: 22, 23
4~ 2 months agocommentedGarren19607
♦18
I was at the Hoboken bus lanes yesterday. Until the aerial imagery is updated for the Hoboken Terminal area I think it will be difficult to accurately map the bus lanes.
5~ 1 month agocommentedGarren19607
♦18
NJ Transit did provide an updated map for the Terminal, including bus lane assignment but without an updated aerial, it will be difficult to do. https://content.njtransit.com/sites/default/files/maps/Hoboken%20DIR_050626_web.pdf
5192029
Category: Unknown
1~ 4 months agoopenedDaitruxdd
♦145
Garden State Plaza bus stop relocated from lot E9 to E7 West side: 709, 756, 758, 770 East side: 163, 171, 175, 707 https://www.njtransit.com/station-advisory/2052354
2~ 2 months agocommentedCurlingMan13
♦53,417
Link provided says: "This advisory has expired." Please advise what action still needs to be taken.
5093954
Category: Unknown
1~ 6 months agoopenedDaitruxdd
♦145
new bus lanes and other road configuration changes. https://content.njtransit.com/sites/default/files/December%202025%20Commuter%20Station%20Access%20Plan.pdf
2~ 5 months agocommentedCurlingMan13
♦53,417
Did you update the map with this info?
4933671
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
new bounding under construction here - 206 George Street
2~ 10 months agocommentedCurlingMan13
♦53,417
Looks like you added it... Apartments? Nuclear power plant?
3~ 10 months agocommentedCurlingMan13
♦53,417
Is that the name or just the address?
4~ 10 months agocommentedDaitruxdd
♦145
It looks to be an apartment building
5~ 10 months agocommentedCurlingMan13
♦53,417
Is "206 George Street" the actual name? Do you have a source? I couldn't find anything online to support this name.
6~ 9 months agocommentedCurlingMan13
♦53,417
Can you confirm what source you used for this name? I couldn't find any online.
7~ 9 months agocommentedCurlingMan13
♦53,417
Please respond to your note. I have an additional question about your note. What source do you have for that name? Is that name "official" or just something made up from the address?
8~ 9 months agocommentedDaitruxdd
♦145
Most projects that don’t have an “official name” just use the address as the name. I think it’s reasonable to keep the address as the name if no source can be found
9~ 8 months agocommentedCurlingMan13
♦53,417
Nothing on aerial imagery yet.
10~ 8 months agoclosedDaitruxdd
♦145
Construction Complete
4957351
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
Apartment building is under construction here - 345 Livingston Ave
2~ 8 months agoclosedCurlingMan13
♦53,417
added
3~ 8 months agoreopenedDaitruxdd
♦145
4~ 6 months agocommentedCurlingMan13
♦53,417
construction area and address already added... All information from note already incorporated.
5~ 16 days agocommentedCurlingMan13
♦53,417
Any update on construction? Any source you would like to provide?
6~ 9 days agoclosedCurlingMan13
♦53,417
No response received. All information from note has already been incorporated onto OSM.
43528501~ 1 year agoopenedRishdp90This parking lot no longer exists. Instead it is a new development with homes that can be seen on Google Maps.
2~ 1 year agocommentedgpserror
♦11,645
we can't copy google maps but I blew away the parking lot
3~ 1 year agocommentedRamanKazadoi
♦1
Can we remove both Sears and Sears Auto Center? New development can be seen in ESRI and NAIP satellite images
4~ 1 year agocommentedgpserror
♦11,645
If you do, remember to retain the address data.
5~ 1 year agocommentedgpserror
♦11,645
as an aside I marked them as demolished:building to warn mappers that there are still satellite imagery with these buildings intact, but they will no longer show up. Again there is a high chance any new buildings here will retain the same address and this should be carried through.
6~ 1 year agocommentedRamanKazadoi
♦1
Accroding to https://kpexcavation.com/project/51-us-route-1/ the apartment building will carry the same address. So is it better to wait until we get a fresh satellite image and re-map the area? Or can I remove the building and put an address pin instead? Not really familiar with such "demolished building" features.
7~ 1 year agocommentedgpserror
♦11,645
I would wait, no sense in deleting the building, then have some other mapper redraw it because they didn't know which imagery was newer. Now they would see that the tagging and hopefully not touch it... but if you really have the desire to change it to a point, feel free to... though I think it's good enough until new imagery/data is available to trace the new building.
8~ 1 year agocommentedRamanKazadoi
♦1
It's clear to me now. Thank you!
9~ 1 year agocommentedDaitruxdd
♦145
I updated the road network and added street names based on map of development https://apps.zondavirtual.com/alphamap/index.html?OLAId=929ec816-77e7-4a6c-8a0b-df22a07c2041
10~ 1 year agocommentedDaitruxdd
♦145
did some digging and found that these are actually two different developments here. the north part is Scarlet Place, while the south where the sears used to be is The Rare by Vermella.
11~ 1 year agocommentedCurlingMan13
♦53,417
If building was removed but it is still on most imagery, it should be tagged with was:building=* or building=demolished. Address indeed should be split and left as a node for now. Any update on construction progress? Any estimate of when the project will be completed?
12~ 1 year agocommentedCurlingMan13
♦53,417
Any update on construction progress?
13~ 1 year agocommentedDaitruxdd
♦145
Will survey when I get the chance
14~ 1 year agocommentedDaitruxdd
♦145
surveyed today. Scarlet Place still has a few homes under construction on the east side. The Reye by Vermella has a new apartment complex that looks compete however construction vehicles are stop present on site. a new road called Vermella Drive comes off of Labor Center Way and connect to there on/off Ramps to US-1 south. there's still construction going on on the north side of the plot. im not entirely sure what it will be. it could possibly be the new building for the On the Border Restaurant.
15~ 8 months agocommentedDaitruxdd
♦145
Updated the area for Scarlet Place. The Reye By Vermella needs further Surveys but looks like Phase I is complete. The Area to the North area is still under construction and will Be Phase II.
16~ 8 months agocommentedCurlingMan13
♦53,417
added a few buildings that are now making their way onto aerial imagery.
4683832
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Wawa construction
2~ 1 year agoclosedCurlingMan13
♦53,417
Added note info (Wawa) to construction area.
3~ 1 year agoreopenedDaitruxdd
♦145
4~ 1 year agocommentedCurlingMan13
♦53,417
Please elaborate on what information still needs to be incorporated. All actions, errors and information in note were addressed. Do you have an address? Estimated start date? Will it have a gas station? Food? Once the map is updated with buildings and roads, when would you consider it acceptable to mark your note resolved?
5~ 1 year agocommentedDaitruxdd
♦145
note should remain open until construction is compete.
6~ 1 year agocommentedCurlingMan13
♦53,417
Can you provide more info. Estimated date completion?
7~ 1 year agocommentedDaitruxdd
♦145
construction is in early stages so id expect to open in 2026. no other info currently. will keep looking online and also survey the site when I get the chance
8~ 1 year agocommentedCurlingMan13
♦53,417
Added brand tags.
9~ 1 year agocommentedCurlingMan13
♦53,417
Ported over address from demolished building tag
10~ 1 year agocommentedDaitruxdd
♦145
New Wawa building and gas station can be seen being constructed
11~ 1 year agocommentedCurlingMan13
♦53,417
Added a note that it will have a C/S and gas station. No signs of construction on aerial imagery.
12~ 10 months agocommentedCurlingMan13
♦53,417
Any update? Just making the rounds to work towards resolving notes.
13~ 9 months agocommentedCurlingMan13
♦53,417
Any update? Also not on aerial imagery.
14~ 9 months agocommentedCurlingMan13
♦53,417
Any update on construction?
15~ 8 months agocommentedCurlingMan13
♦53,417
Nothing new on aerial imagery. Any update on construction from your survey? Any new details that can be mapped to work note towards resolution since there are no details in it that are unmapped?
16~ 8 months agocommentedDaitruxdd
♦145
looks like construction is complete. i'm not sure if it is open yet
17~ 8 months agocommentedCurlingMan13
♦53,417
Making the rounds on open notes - no signs of construction on aerial imagery.
18~ 8 months agocommentedCurlingMan13
♦53,417
Looks like it opened a month ago... Should have probably just added it as an active business instead of micro-managing conatruction. Map will need to be update timely since this business has been open and operating for a bit. Other details, such as address, hours, etc. will also need to be added. https://www.google.com/amp/s/www.nj.com/middlesex/2025/10/new-wawa-store-opens-in-this-nj-town-with-free-coffee-giveaways.html%3foutputType=amp
19~ 8 months agocommentedCurlingMan13
♦53,417
Also need to merge address nodes, so likely just remove from construction area since there are two instances tagged with the address here.
20~ 7 months agoclosedjhaluska80
♦3,417
Construction is complete. It opened October 1st. Added CS and GS.
4940256
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
building under construction - 116 Bayard St
2~ 10 months agocommentedCurlingMan13
♦53,417
Looks like you already mapped the construction zone.
3~ 10 months agocommentedCurlingMan13
♦53,417
Is this really the name? Do you have a source for "116 Bayard Street"?
4~ 8 months agocommentedDaitruxdd
♦145
it looks like the building next door at 114 Bayard had been demolished and a new building is under construction on the combined property as 114 Bayard St.
5~ 8 months agoclosedCurlingMan13
♦53,417
Looks like you expanded construction areas and incorporated all details in note into the construction area.
6~ 8 months agoreopenedDaitruxdd
♦145
7~ 8 months agocommentedCurlingMan13
♦53,417
Nothing on aerial imagery, and all details from note already incorporated.
8~ 7 months agocommentedCurlingMan13
♦53,417
Nothing on aerial imagery yet. All details from note already incorporated.
9~ 6 months agocommentedCurlingMan13
♦53,417
Still nothing on aerial imagery. Do you have an update on construction progress?
10~ 1 month agocommentedCurlingMan13
♦53,417
Any update on construction?
4838678
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Matawan Junction construction
2~ 10 months agocommentedCurlingMan13
♦53,417
apartments? commercial? source?
3~ 8 months agocommentedCurlingMan13
♦53,417
What will it be? What source did you use? Please provide a source or how you know there is construction here and where you got the name from.
4~ 8 months agocommentedDaitruxdd
♦145
Looks to be and apartment complex
5~ 8 months agocommentedCurlingMan13
♦53,417
updated type of construction. Nothing on aerial imagery resembling construction here. And again, please provide a source. I wasn't able to find one.
6~ 6 months agocommentedCurlingMan13
♦53,417
Any update on progress?
7~ 1 month agocommentedDawsZed
♦231
I'm not sure why Daitruxdd is hiding sources. I did pass by here a few weeks ago, there's a building under construction now - it appears to be apartments; I've added a rough outline.
4999905
Category: Unknown
1~ 9 months agoopenedDaitruxdd
♦145
Construction going on here - 488 Easton Ave
2~ 8 months agocommentedCurlingMan13
♦53,417
added construction zone. not on aerial imagery
3~ 6 months agocommentedCurlingMan13
♦53,417
Still nothing on aerial imagery. Do you know what is being built here?
4~ 1 month agoclosedCurlingMan13
♦53,417
No response received, no sources could be located. construction site already mapped and all details from the note already incorporated.
4999890
Category: Unknown
1~ 9 months agoopenedDaitruxdd
♦145
Construction going on here - 89-91 Bayard St
2~ 8 months agocommentedCurlingMan13
♦53,417
Looks like you already added it, but as I have said before and have commented, a name is only a name. Is it actually named "89-91 Bayard Street" or is that just a reference name for you to keep track of construction?
3~ 7 months agocommentedCurlingMan13
♦53,417
Please respond to your notes when others have questions. Again, please confirm the name. Not on aerial imagery, but drawn from building plans.
4536274
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Stirlingside Residences Construction
2~ 1 year agocommentedCurlingMan13
♦53,417
Name added to construction zone. Any update on when it might be finished?
3~ 1 year agocommentedDaitruxdd
♦145
spring/summer 2025
4~ 1 year agocommentedCurlingMan13
♦53,417
opening_date=2025 tag added
5~ 1 year agocommentedCurlingMan13
♦53,417
Any update on construction progress? Spring/Summer 2025 is here.
6~ 1 year agocommentedDaitruxdd
♦145
Will survey when I get the chance
7~ 1 year agocommentedCurlingMan13
♦53,417
Nothing visible on aerial imagery yet.
8~ 1 year agocommentedDaitruxdd
♦145
surveyed today. looks like the building is almost compete. Construction should be finished in a month or two.
9~ 11 months agocommentedCurlingMan13
♦53,417
Looks like name has changed to 50 Neilson. Please confirm.
10~ 10 months agocommentedDaitruxdd
♦145
Name has changed to 50 Nelison
11~ 10 months agocommentedDaitruxdd
♦145
Construction completed. Survey needed to map building
12~ 10 months agocommentedCurlingMan13
♦53,417
Since construction is complete, I changed to construction zone to apartment complex.
13~ 9 months agoclosedDaitruxdd
♦145
4998136
Category: Unknown
1~ 9 months agoopenedDaitruxdd
♦145
Construction going on here. Not really sure what it’s supposed to be
2~ 7 months agocommentedCurlingMan13
♦53,417
What's your source? Survey? News article?
3~ 2 months agocommentedCurlingMan13
♦53,417
Did you figure out what is going to be here yet?
4~ 1 month agocommentedCurlingMan13
♦53,417
Please respond with a source as has been previously requested.
5~ 16 days agoclosedCurlingMan13
♦53,417
Despite multiple attempts to get further information, none has been provided. Without further information such as the scope of construction, one can only speculate as to what they may have meant. (new building? Repaving? Resurfacing? New bench? etc.)
6~ 13 days agoreopenedmbeyerle
♦223
7~ 13 days agocommentedmbeyerle
♦223
I couldn't identify the discussed construction in imagery but intend to survey in the imminent future and will revert back
4747559
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Starbucks - new location under construction
2~ 1 year agocommentedCurlingMan13
♦53,417
Updated building tag and added shop=coffee to construction area.
3~ 1 year agocommentedCurlingMan13
♦53,417
Removed roads here. Assuming new building may mean new road config.
4~ 1 year agocommentedCurlingMan13
♦53,417
Found a source that stated it would have a drive through. Added source to construction area and drive_through=yes.
5~ 1 year agocommentedCurlingMan13
♦53,417
Also scheduled to be completed Q4 2025. Added that info to construction area as well.
6~ 11 months agocommentedDawsZed
♦231
Demolished, but no construction seen on survey. Tagged as brownfield.
7~ 9 months agocommentedCurlingMan13
♦53,417
Any update on progress? Ready to change it back from brownfield to construction?
8~ 9 months agocommentedDawsZed
♦231
No construction on survey today, just an empty field (https://pixvid.org/images/2025/09/24/UA7vQ.png). I feel this note was opened too soon.
9~ 9 months agocommentedCurlingMan13
♦53,417
Is it more of a proposal rather than construction? We don't map proposals on OSM since it can't be verified. And generally only map construction once they begin. We also don't use notes to keep track of construction projects once the details are captured. So what do we want to do? Regular pings to work toward note resolution? I had the details added, but you removed them, which I sort of agree. I don't think this note serves its intended purpose and is misleading if construction hasn't even started (and may not start immediately). I'm more than happy to ping the note for updates semi-regularly.
10~ 9 months agocommentedDaitruxdd
♦145
https://themonmouthjournalnorthern.com/starbucks-coming-to-former-bank-of-america-site-in-union-beach-p14684-150.htm According to this source there should be construction going on. I haven’t surveyed the area in a while but last I checked the old building was demolished but no work on the new one started
11~ 7 months agocommentedCurlingMan13
♦53,417
Has construction started so we can move the lifecycle up to construction?
12~ 6 months agoclosedDawsZed
♦231
Closing this note as it is misleading about the present status of this location. No construction seen here on multiple resurveys.
4736289
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
building is being demolished
2~ 10 months agocommentedCurlingMan13
♦53,417
map reflects this already. What else is being done? What else needs to be added from the note to resolve it?
3~ 9 months agocommentedCurlingMan13
♦53,417
Any update on construction or what further action(s) are required to resolve the note?
4~ 9 months agoclosedDaitruxdd
♦145
4638913
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Neilson Park construction.
2~ 1 year agocommentedDaitruxdd
♦145
was scheduled for opening Fall 2024. survey needed to confirm opening/ construction progress
3~ 1 year agocommentedDaitruxdd
♦145
Surveyed today. Site still under construction.
4~ 1 year agocommentedCurlingMan13
♦53,417
Please update check_date=* if you check it and it still under construction. We use that tag rather than notes to tag that it is still under construction or that it was the last date it was checked to determine if it is still correctly mapped. Updated to check_date=2025-02-23 for you based on note comment.
5~ 1 year agocommentedCurlingMan13
♦53,417
Any update on construction progress?
6~ 1 year agocommentedDaitruxdd
♦145
Will survey when I get the chance
7~ 1 year agocommentedDaitruxdd
♦145
the park has been renamed to Liberty Square Park and is scheduled to open this fall
8~ 1 year agocommentedDaitruxdd
♦145
surveyed today. the lot has been regraded with new paths and stairways stating to take shape. still lots of construction going on
9~ 10 months agocommentedDaitruxdd
♦145
Surveyed today. Park looks almost complete. Still some construction going on but should be opening soon
10~ 9 months agoclosedDaitruxdd
♦145
park is now open
4957352
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
New apartment building is under construction here - 200 Livingston Ave
2~ 9 months agocommentedCurlingMan13
♦53,417
Is the church to the east being demolished?
3~ 9 months agocommentedDaitruxdd
♦145
No, church is still there
4~ 7 months agocommentedCurlingMan13
♦53,417
added construction zone. Do you have a source?
5~ 6 months agocommentedCurlingMan13
♦53,417
Still looking for a source or update on construction progress.
6~ 16 days agocommentedCurlingMan13
♦53,417
Response still not received... Any update on construction? Any source you would like to provide?
4957347
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
New apartment building is under construction here - 200 Livingston Ave
2~ 10 months agoclosedDaitruxdd
♦145
4940254
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
Building under construction - 50 Easton Ave
2~ 10 months agocommentedCurlingMan13
♦53,417
Is "50 Easton Ave" the actual name or just the address? Also, all information from note already incorporated into construction area. Please advise what else needs to be done to resolve note.
3~ 10 months agocommentedDaitruxdd
♦145
Building outline could be added if up to date areal imagery is available
4~ 9 months agocommentedCurlingMan13
♦53,417
It won't be for several years, more than likely. But I will check periodically and update note accordingly I guess until then.
5~ 8 months agocommentedCurlingMan13
♦53,417
No updates found on aerial imagery.
4454300
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Route 35 Redevelopment construction
2~ 1 year agocommentedCurlingMan13
♦53,417
Do you have any update? And do you know what is being built here?
3~ 1 year agocommentedDaitruxdd
♦145
looks to be a self storage complex
4~ 1 year agocommentedDawsZed
♦231
I saw this place a few days ago, the steel structure for maybe 3 buildings are up, fenced off with lots of construction vehicles
5~ 1 year agocommentedCurlingMan13
♦53,417
Any update? Would you be able to add the buildings based on your local survey?
6~ 1 year agocommentedDawsZed
♦231
Still under construction, added the buildings I saw when I visited here yesterday: https://i.imgur.com/kWd4I3Y.png https://i.imgur.com/xiWDFVg.png
7~ 1 year agocommentedCurlingMan13
♦53,417
Added shop=storage_rental Do you know what brand?
8~ 1 year agocommentedDaitruxdd
♦145
Not sure at the moment. Will update when I know
9~ 11 months agocommentedDawsZed
♦231
From survey today, appears to be a SecureSpace Self Storage facility. Opens August 28, 2025 per earliest website booking date (https://securespace.com/storage-units/nj/south-amboy-self-storage/1970-nj-35-south-amboy-nj-08879). Updated tagging.
10~ 10 months agocommentedCurlingMan13
♦53,417
Is it open yet? Can note be closed since no further action is required?
11~ 10 months agocommentedDaitruxdd
♦145
not sure if it’s open yet but there wasn’t any construction going on as of last week. Note can be closed and construction area removed/building tags updated
12~ 10 months agoclosedCurlingMan13
♦53,417
updated status of building. Fixed storage unit tagging. left note on C/S.
4623316
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Bridge MT-10 Replacement. Scheduled to open Fall 2025
2~ 1 year agocommentedDawsZed
♦231
Confirmed this by survey, added access tagging for the roads here.
3~ 1 year agocommentedCurlingMan13
♦53,417
Added note text "Bridge MT-10 Replacement. Scheduled to open Fall 2025" to note=* tag on ways.
4~ 10 months agocommentedCurlingMan13
♦53,417
Any update on construction? #WorkingTheNotes
5~ 10 months agocommentedDaitruxdd
♦145
As of 2 weeks ago it was still under construction
6~ 8 months agocommentedCurlingMan13
♦53,417
Has it reopened yet?
7~ 8 months agocommentedCurlingMan13
♦53,417
No response received. Is construction complete yet?
8~ 8 months agocommentedDawsZed
♦231
Not open yet, still under construction, signs for closure are still up with construction equipment on site.
9~ 6 months agoclosedDawsZed
♦231
Construction complete. Tagged as open.
4932989
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
Albany parking deck is being demolished and is going to be replaced with 11 spring street, new apartment building
2~ 10 months agocommentedCurlingMan13
♦53,417
Is 11 Spring Street the name of the new apartment complex or is it the address?
3~ 10 months agocommentedDaitruxdd
♦145
As far as I know it’s both
4~ 8 months agocommentedCurlingMan13
♦53,417
Cool, name and address added, construction zone already mapped. No further information in note outstanding that still needs to be added. If this is a personal note you are using to remond yourself of construction, then the note should be closed. If not, please provide additional information on what needs to be added so it can be added and note can be closed. Notes should not be used as personal reminders or personal notes that have no information to offer that is not already mapped.
4936168
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
New warehouse construction
2~ 10 months agocommentedCurlingMan13
♦53,417
Construction area already mapped.
3~ 9 months agocommentedCurlingMan13
♦53,417
Not on aerial imagery yet.
4~ 8 months agocommentedCurlingMan13
♦53,417
removed the name. A name is only a name. That was an address.
4933003
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
New Brunswick water tower is under construction.
2~ 10 months agocommentedCurlingMan13
♦53,417
Looks like construction area was already added.
3~ 10 months agocommentedCurlingMan13
♦53,417
added source to construction area.
4~ 9 months agocommentedCurlingMan13
♦53,417
Providing update to open note: Nothing on aerial imagery yet besides the (old) water tower.
5~ 7 months agocommentedCurlingMan13
♦53,417
Nothing on aerial imagery. Do you have any updates on construction?
6~ 2 months agocommentedCurlingMan13
♦53,417
Any update on construction?
7~ 16 days agoclosedCurlingMan13
♦53,417
No response received. All information from note since incorporated, included expected opening/finish date which was correctly tagged to the construction area.
4443716
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
this is the site of the Health and life Science Exchange (Helix, NJ), a 3 building complex with laboratories, office space and housing units. the first building, H1 is scheduled to open in late 2025/ early 2026 and is going to house Rutgers Medical School, New Jersey Innovation Hub and Translational research space.
2~ 1 year agocommentedCurlingMan13
♦53,417
Is the full name "Health and life Science Exchange" And the nickname "Helix"? If so, the non-abbreviated name should be used.
3~ 1 year agocommentedDaitruxdd
♦145
the non-abbreviated name is not commonly used. I put it under the official name tag instead. also as a side note the groundbreaking of the second phase H-2 is expected by the end of this year
4~ 1 year agocommentedDaitruxdd
♦145
H-1 is now scheduled to be completed by March 2026 construction on H-2 has begun and is scheduled for competition in late 2027 Spring street has been closed for about a year as part of H-2 construction
5~ 10 months agocommentedCurlingMan13
♦53,417
Is Spring Street reopened?
6~ 10 months agocommentedDaitruxdd
♦145
No. Will be closed for about a year.
7~ 8 months agocommentedCurlingMan13
♦53,417
Nothing on aerial imagery except the bare ground.
8~ 7 months agocommentedCurlingMan13
♦53,417
Any update on construction progress for Helix 1?
4932984
Category: Unknown
1~ 10 months agoopenedDaitruxdd
♦145
Hildebrand Commons construction. Going on here.
2~ 10 months agocommentedCurlingMan13
♦53,417
Looks like you added all the info to the construction area already from note. No action required for note.
3~ 9 months agocommentedCurlingMan13
♦53,417
Not on aerial imagery.
4~ 8 months agocommentedCurlingMan13
♦53,417
Not on aerial imagery... yet.
5~ 7 months agocommentedCurlingMan13
♦53,417
Updated expected opening date of Fall 2026. All details from note incorporated. Any reason to keep the note open until 2026 since there is no info from note not incorporated? Also, no signs of construction on latest imagery.
6~ 2 months agocommentedCurlingMan13
♦53,417
Any update on construction? Is it complete?
4448092
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
new roundabout is being built here, leaving note as a reminder to update area as construction progresses.
2~ 1 year agocommentedCurlingMan13
♦53,417
Any update on construction progress?
3~ 1 year agocommentedDaitruxdd
♦145
someone has been updating the roads so everything looks accurate as of the time I'm writing this.
4~ 1 year agocommentedDawsZed
♦231
That someone is me! Survey today looks like the forest area for the roundabout area has been cleared and graded flat with gravel, but otherwise no curbs or pavement yet.
5~ 1 year agocommentedCurlingMan13
♦53,417
Any update on construction?
6~ 1 year agocommentedDaitruxdd
♦145
Doesn’t look like there’s been much going on recently
7~ 1 year agocommentedDaitruxdd
♦145
updated the driveways to be separate
8~ 1 year agocommentedDaitruxdd
♦145
updated road layout based on survey
9~ 1 year agocommentedCurlingMan13
♦53,417
Any update on construction?
10~ 1 year agocommentedDaitruxdd
♦145
Surveyed last weekend. Not much going on. Construction is pretty slow at the moment
11~ 1 year agocommentedDaitruxdd
♦145
surveyed today. an outline of new road layout is starting to take shape with the center and splitter islands starting to appear along with curbs and sidewalks
12~ 1 year agocommentedCurlingMan13
♦53,417
updated last_checked=* to 2025-05-25 based on your note
13~ 11 months agocommentedDaitruxdd
♦145
Surveyed today 6/13/25 Roundabout is now open to traffic however there is still continuing construction going on in the area
14~ 11 months agocommentedDawsZed
♦231
Ran a GPS trace today of the new alignment, added the new traffic circle to the map (https://www.openstreetmap.org/?mlat=40.39915048&mlon=-74.02323302&display-gpx=12020122).
15~ 11 months agocommentedCurlingMan13
♦53,417
What further construction is there that would prevent resolution of this note?
16~ 11 months agocommentedCurlingMan13
♦53,417
Any update on what additional mapping is required?
17~ 11 months agocommentedDawsZed
♦231
Honestly, this is practically done. Valley Drive's approach is not yet permanent (outlined with cones), and there's a telephone pole in the roundabout. Yet, the final alignment of the roads and center island are done, it matches the final blueprints I've seen online. Nothing else missing or incorrect, future imagery and future removal of the construction area aside.
18~ 11 months agoclosedDawsZed
♦231