| Note | # | Tmstmp UTC | Event | Contributor | Comment |
|---|---|---|---|---|---|
| 5093954 Category: Unknown | 1 | 2025-12-16 16:44 | opened | Daitruxdd ♦144 | new bus lanes and other road configuration changes. https://content.njtransit.com/sites/default/files/December%202025%20Commuter%20Station%20Access%20Plan.pdf |
| 2 | 2026-01-14 19:59 | commented | CurlingMan13 ♦52,160 | Did you update the map with this info? | |
| 4624591 Category: unknown | 1 | 2025-02-12 19:47 | opened | Daitruxdd ♦144 | Journal Square bus lane C construction |
| 2 | 2025-04-06 02:47 | commented | CurlingMan13 ♦52,160 | Can you elaborate or link to references? What needs to be updated? | |
| 3 | 2025-04-06 20:24 | commented | Daitruxdd ♦144 | it was an NJ transit alert back from October of last year. it no longer appears on the site however it is currently unclear if construction is still going on. survey is needed. and if so bus relations should be modified to use the correct platforms | |
| 4 | 2025-05-07 14:50 | commented | Daitruxdd ♦144 | link is back online. bus relations should be updated to stop stop at the correct platforms; https://www.njtransit.com/station-advisory/1812350 | |
| 5 | 2025-05-29 06:10 | commented | CurlingMan13 ♦52,160 | It looks like you have been busy adding the relations? Also, please do not use ALL CAPS for bus stop names. https://www.openstreetmap.org/node/12539615447 https://wiki.openstreetmap.org/wiki/Names#Good_practice:~:text=or%20likely%20mistakes%3F-,Capitalisation,-Names%20are%20adapted | |
| 6 | 2025-05-29 06:14 | commented | CurlingMan13 ♦52,160 | Also, the bus stops should be added to the relation for the JSTC. | |
| 7 | 2025-05-30 17:14 | commented | Daitruxdd ♦144 | NJ Transit has their bus stop names in all caps. I copy and pasted the names directly from their website to prevent making spelling mistakes and keep true to the source material. | |
| 8 | 2025-06-20 23:49 | commented | Daitruxdd ♦144 | Stage 3 Stating this week. Lanes A and B closed. https://www.njtransit.com/service-advisory/1933143 | |
| 9 | 2025-08-15 04:57 | commented | CurlingMan13 ♦52,160 | For whatever it is worth, and feel free to take part in the mess, but the buses are using the surrounding streets, specifically Pavonia as a bus stop/terminal instead of the lanes. I would encourage you to also update the relations. Also, make sure you are using the correct construction tags for temporary work. | |
| 10 | 2025-10-30 03:26 | commented | CurlingMan13 ♦52,160 | Any update on this conversation that you're monitoring? | |
| 11 | 2025-12-16 15:36 | commented | Daitruxdd ♦144 | stage 4 is currently ongoing https://www.njtransit.com/station-advisory/1812350. I am in the process of redoing all the bus routes. will update them too once stage 4 is competed | |
| 5093940 Category: Unknown | 1 | 2025-12-16 15:33 | opened | Daitruxdd ♦144 | new bus terminal. https://www.njtransit.com/station-advisory/2017698 |
| 4933671 Category: Unknown | 1 | 2025-08-28 03:46 | opened | Daitruxdd ♦144 | new bounding under construction here - 206 George Street |
| 2 | 2025-09-09 18:08 | commented | CurlingMan13 ♦52,160 | Looks like you added it... Apartments? Nuclear power plant? | |
| 3 | 2025-09-09 18:10 | commented | CurlingMan13 ♦52,160 | Is that the name or just the address? | |
| 4 | 2025-09-09 18:55 | commented | Daitruxdd ♦144 | It looks to be an apartment building | |
| 5 | 2025-09-10 00:58 | commented | CurlingMan13 ♦52,160 | Is "206 George Street" the actual name? Do you have a source? I couldn't find anything online to support this name. | |
| 6 | 2025-09-24 18:52 | commented | CurlingMan13 ♦52,160 | Can you confirm what source you used for this name? I couldn't find any online. | |
| 7 | 2025-10-07 13:21 | commented | CurlingMan13 ♦52,160 | Please respond to your note. I have an additional question about your note. What source do you have for that name? Is that name "official" or just something made up from the address? | |
| 8 | 2025-10-07 14:16 | commented | Daitruxdd ♦144 | Most projects that don’t have an “official name” just use the address as the name. I think it’s reasonable to keep the address as the name if no source can be found | |
| 9 | 2025-10-30 01:54 | commented | CurlingMan13 ♦52,160 | Nothing on aerial imagery yet. | |
| 10 | 2025-10-31 19:30 | closed | Daitruxdd ♦144 | Construction Complete | |
| 4957351 Category: Unknown | 1 | 2025-09-11 17:08 | opened | Daitruxdd ♦144 | Apartment building is under construction here - 345 Livingston Ave |
| 2 | 2025-10-30 02:52 | closed | CurlingMan13 ♦52,160 | added | |
| 3 | 2025-10-30 03:52 | reopened | Daitruxdd ♦144 | ||
| 4 | 2026-01-06 23:48 | commented | CurlingMan13 ♦52,160 | construction area and address already added... All information from note already incorporated. | |
| 4352850 | 1 | 2024-07-26 19:51 | opened | Rishdp90 | This parking lot no longer exists. Instead it is a new development with homes that can be seen on Google Maps. |
| 2 | 2024-07-27 01:46 | commented | gpserror ♦12,257 | we can't copy google maps but I blew away the parking lot | |
| 3 | 2024-08-01 09:09 | commented | RamanKazadoi ♦1 | Can we remove both Sears and Sears Auto Center? New development can be seen in ESRI and NAIP satellite images | |
| 4 | 2024-08-01 13:17 | commented | gpserror ♦12,257 | If you do, remember to retain the address data. | |
| 5 | 2024-08-01 13:21 | commented | gpserror ♦12,257 | as an aside I marked them as demolished:building to warn mappers that there are still satellite imagery with these buildings intact, but they will no longer show up. Again there is a high chance any new buildings here will retain the same address and this should be carried through. | |
| 6 | 2024-08-01 13:54 | commented | RamanKazadoi ♦1 | Accroding to https://kpexcavation.com/project/51-us-route-1/ the apartment building will carry the same address. So is it better to wait until we get a fresh satellite image and re-map the area? Or can I remove the building and put an address pin instead? Not really familiar with such "demolished building" features. | |
| 7 | 2024-08-01 15:20 | commented | gpserror ♦12,257 | I would wait, no sense in deleting the building, then have some other mapper redraw it because they didn't know which imagery was newer. Now they would see that the tagging and hopefully not touch it... but if you really have the desire to change it to a point, feel free to... though I think it's good enough until new imagery/data is available to trace the new building. | |
| 8 | 2024-08-01 15:25 | commented | RamanKazadoi ♦1 | It's clear to me now. Thank you! | |
| 9 | 2024-09-03 12:44 | commented | Daitruxdd ♦144 | I updated the road network and added street names based on map of development https://apps.zondavirtual.com/alphamap/index.html?OLAId=929ec816-77e7-4a6c-8a0b-df22a07c2041 | |
| 10 | 2024-11-06 01:32 | commented | Daitruxdd ♦144 | did some digging and found that these are actually two different developments here. the north part is Scarlet Place, while the south where the sears used to be is The Rare by Vermella. | |
| 11 | 2025-03-27 20:30 | commented | CurlingMan13 ♦52,160 | If building was removed but it is still on most imagery, it should be tagged with was:building=* or building=demolished. Address indeed should be split and left as a node for now. Any update on construction progress? Any estimate of when the project will be completed? | |
| 12 | 2025-05-01 16:33 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 13 | 2025-05-02 00:13 | commented | Daitruxdd ♦144 | Will survey when I get the chance | |
| 14 | 2025-06-21 01:29 | commented | Daitruxdd ♦144 | surveyed today. Scarlet Place still has a few homes under construction on the east side. The Reye by Vermella has a new apartment complex that looks compete however construction vehicles are stop present on site. a new road called Vermella Drive comes off of Labor Center Way and connect to there on/off Ramps to US-1 south. there's still construction going on on the north side of the plot. im not entirely sure what it will be. it could possibly be the new building for the On the Border Restaurant. | |
| 15 | 2025-10-29 14:36 | commented | Daitruxdd ♦144 | Updated the area for Scarlet Place. The Reye By Vermella needs further Surveys but looks like Phase I is complete. The Area to the North area is still under construction and will Be Phase II. | |
| 16 | 2025-10-30 01:57 | commented | CurlingMan13 ♦52,160 | added a few buildings that are now making their way onto aerial imagery. | |
| 4940256 Category: Unknown | 1 | 2025-09-01 05:22 | opened | Daitruxdd ♦144 | building under construction - 116 Bayard St |
| 2 | 2025-09-09 20:09 | commented | CurlingMan13 ♦52,160 | Looks like you already mapped the construction zone. | |
| 3 | 2025-09-10 02:59 | commented | CurlingMan13 ♦52,160 | Is this really the name? Do you have a source for "116 Bayard Street"? | |
| 4 | 2025-10-14 21:38 | commented | Daitruxdd ♦144 | it looks like the building next door at 114 Bayard had been demolished and a new building is under construction on the combined property as 114 Bayard St. | |
| 5 | 2025-10-15 05:07 | closed | CurlingMan13 ♦52,160 | Looks like you expanded construction areas and incorporated all details in note into the construction area. | |
| 6 | 2025-10-15 15:59 | reopened | Daitruxdd ♦144 | ||
| 7 | 2025-10-30 04:20 | commented | CurlingMan13 ♦52,160 | Nothing on aerial imagery, and all details from note already incorporated. | |
| 8 | 2025-11-16 20:33 | commented | CurlingMan13 ♦52,160 | Nothing on aerial imagery yet. All details from note already incorporated. | |
| 9 | 2026-01-06 23:50 | commented | CurlingMan13 ♦52,160 | Still nothing on aerial imagery. Do you have an update on construction progress? | |
| 4838678 Category: unknown | 1 | 2025-07-04 14:03 | opened | Daitruxdd ♦144 | Matawan Junction construction |
| 2 | 2025-08-26 06:46 | commented | CurlingMan13 ♦52,160 | apartments? commercial? source? | |
| 3 | 2025-10-15 05:04 | commented | CurlingMan13 ♦52,160 | What will it be? What source did you use? Please provide a source or how you know there is construction here and where you got the name from. | |
| 4 | 2025-10-15 15:59 | commented | Daitruxdd ♦144 | Looks to be and apartment complex | |
| 5 | 2025-10-30 03:01 | commented | CurlingMan13 ♦52,160 | updated type of construction. Nothing on aerial imagery resembling construction here. And again, please provide a source. I wasn't able to find one. | |
| 6 | 2026-01-06 23:41 | commented | CurlingMan13 ♦52,160 | Any update on progress? | |
| 4683832 Category: unknown | 1 | 2025-03-26 20:53 | opened | Daitruxdd ♦144 | Wawa construction |
| 2 | 2025-03-27 16:22 | closed | CurlingMan13 ♦52,160 | Added note info (Wawa) to construction area. | |
| 3 | 2025-03-27 19:42 | reopened | Daitruxdd ♦144 | ||
| 4 | 2025-03-27 20:27 | commented | CurlingMan13 ♦52,160 | Please elaborate on what information still needs to be incorporated. All actions, errors and information in note were addressed. Do you have an address? Estimated start date? Will it have a gas station? Food? Once the map is updated with buildings and roads, when would you consider it acceptable to mark your note resolved? | |
| 5 | 2025-03-31 14:04 | commented | Daitruxdd ♦144 | note should remain open until construction is compete. | |
| 6 | 2025-04-06 02:44 | commented | CurlingMan13 ♦52,160 | Can you provide more info. Estimated date completion? | |
| 7 | 2025-04-06 20:19 | commented | Daitruxdd ♦144 | construction is in early stages so id expect to open in 2026. no other info currently. will keep looking online and also survey the site when I get the chance | |
| 8 | 2025-05-08 03:15 | commented | CurlingMan13 ♦52,160 | Added brand tags. | |
| 9 | 2025-05-08 03:16 | commented | CurlingMan13 ♦52,160 | Ported over address from demolished building tag | |
| 10 | 2025-05-08 13:03 | commented | Daitruxdd ♦144 | New Wawa building and gas station can be seen being constructed | |
| 11 | 2025-05-11 04:48 | commented | CurlingMan13 ♦52,160 | Added a note that it will have a C/S and gas station. No signs of construction on aerial imagery. | |
| 12 | 2025-09-10 01:09 | commented | CurlingMan13 ♦52,160 | Any update? Just making the rounds to work towards resolving notes. | |
| 13 | 2025-09-24 18:54 | commented | CurlingMan13 ♦52,160 | Any update? Also not on aerial imagery. | |
| 14 | 2025-09-24 19:03 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 15 | 2025-10-15 03:14 | commented | CurlingMan13 ♦52,160 | Nothing new on aerial imagery. Any update on construction from your survey? Any new details that can be mapped to work note towards resolution since there are no details in it that are unmapped? | |
| 16 | 2025-10-15 14:03 | commented | Daitruxdd ♦144 | looks like construction is complete. i'm not sure if it is open yet | |
| 17 | 2025-10-30 01:58 | commented | CurlingMan13 ♦52,160 | Making the rounds on open notes - no signs of construction on aerial imagery. | |
| 18 | 2025-11-06 06:41 | commented | CurlingMan13 ♦52,160 | Looks like it opened a month ago... Should have probably just added it as an active business instead of micro-managing conatruction. Map will need to be update timely since this business has been open and operating for a bit. Other details, such as address, hours, etc. will also need to be added. https://www.google.com/amp/s/www.nj.com/middlesex/2025/10/new-wawa-store-opens-in-this-nj-town-with-free-coffee-giveaways.html%3foutputType=amp | |
| 19 | 2025-11-06 06:42 | commented | CurlingMan13 ♦52,160 | Also need to merge address nodes, so likely just remove from construction area since there are two instances tagged with the address here. | |
| 20 | 2025-11-12 14:00 | closed | jhaluska80 ♦2,826 | Construction is complete. It opened October 1st. Added CS and GS. | |
| 4999905 Category: Unknown | 1 | 2025-10-10 21:49 | opened | Daitruxdd ♦144 | Construction going on here - 488 Easton Ave |
| 2 | 2025-10-30 02:53 | commented | CurlingMan13 ♦52,160 | added construction zone. not on aerial imagery | |
| 3 | 2026-01-06 23:47 | commented | CurlingMan13 ♦52,160 | Still nothing on aerial imagery. Do you know what is being built here? | |
| 4999890 Category: Unknown | 1 | 2025-10-10 19:32 | opened | Daitruxdd ♦144 | Construction going on here - 89-91 Bayard St |
| 2 | 2025-10-15 03:08 | commented | CurlingMan13 ♦52,160 | Looks like you already added it, but as I have said before and have commented, a name is only a name. Is it actually named "89-91 Bayard Street" or is that just a reference name for you to keep track of construction? | |
| 3 | 2025-11-16 19:31 | commented | CurlingMan13 ♦52,160 | Please respond to your notes when others have questions. Again, please confirm the name. Not on aerial imagery, but drawn from building plans. | |
| 4536274 Category: unknown | 1 | 2024-11-28 16:15 | opened | Daitruxdd ♦144 | Stirlingside Residences Construction |
| 2 | 2025-01-01 02:16 | commented | CurlingMan13 ♦52,160 | Name added to construction zone. Any update on when it might be finished? | |
| 3 | 2025-01-01 06:15 | commented | Daitruxdd ♦144 | spring/summer 2025 | |
| 4 | 2025-03-22 20:34 | commented | CurlingMan13 ♦52,160 | opening_date=2025 tag added | |
| 5 | 2025-05-01 16:33 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? Spring/Summer 2025 is here. | |
| 6 | 2025-05-02 00:10 | commented | Daitruxdd ♦144 | Will survey when I get the chance | |
| 7 | 2025-05-11 05:12 | commented | CurlingMan13 ♦52,160 | Nothing visible on aerial imagery yet. | |
| 8 | 2025-06-21 01:20 | commented | Daitruxdd ♦144 | surveyed today. looks like the building is almost compete. Construction should be finished in a month or two. | |
| 9 | 2025-08-04 05:46 | commented | CurlingMan13 ♦52,160 | Looks like name has changed to 50 Neilson. Please confirm. | |
| 10 | 2025-08-27 15:18 | commented | Daitruxdd ♦144 | Name has changed to 50 Nelison | |
| 11 | 2025-08-29 14:03 | commented | Daitruxdd ♦144 | Construction completed. Survey needed to map building | |
| 12 | 2025-09-10 00:58 | commented | CurlingMan13 ♦52,160 | Since construction is complete, I changed to construction zone to apartment complex. | |
| 13 | 2025-10-09 19:35 | closed | Daitruxdd ♦144 | ||
| 4998136 Category: Unknown | 1 | 2025-10-09 14:20 | opened | Daitruxdd ♦144 | Construction going on here. Not really sure what it’s supposed to be |
| 2 | 2025-11-16 19:24 | commented | CurlingMan13 ♦52,160 | What's your source? Survey? News article? | |
| 4747559 Category: unknown | 1 | 2025-05-08 01:11 | opened | Daitruxdd ♦144 | Starbucks - new location under construction |
| 2 | 2025-05-08 05:03 | commented | CurlingMan13 ♦52,160 | Updated building tag and added shop=coffee to construction area. | |
| 3 | 2025-05-11 06:54 | commented | CurlingMan13 ♦52,160 | Removed roads here. Assuming new building may mean new road config. | |
| 4 | 2025-05-29 07:54 | commented | CurlingMan13 ♦52,160 | Found a source that stated it would have a drive through. Added source to construction area and drive_through=yes. | |
| 5 | 2025-05-29 07:56 | commented | CurlingMan13 ♦52,160 | Also scheduled to be completed Q4 2025. Added that info to construction area as well. | |
| 6 | 2025-08-09 02:19 | commented | DawsZed ♦229 | Demolished, but no construction seen on survey. Tagged as brownfield. | |
| 7 | 2025-09-24 20:55 | commented | CurlingMan13 ♦52,160 | Any update on progress? Ready to change it back from brownfield to construction? | |
| 8 | 2025-09-24 22:44 | commented | DawsZed ♦229 | No construction on survey today, just an empty field (https://pixvid.org/images/2025/09/24/UA7vQ.png). I feel this note was opened too soon. | |
| 9 | 2025-10-07 15:18 | commented | CurlingMan13 ♦52,160 | Is it more of a proposal rather than construction? We don't map proposals on OSM since it can't be verified. And generally only map construction once they begin. We also don't use notes to keep track of construction projects once the details are captured. So what do we want to do? Regular pings to work toward note resolution? I had the details added, but you removed them, which I sort of agree. I don't think this note serves its intended purpose and is misleading if construction hasn't even started (and may not start immediately). I'm more than happy to ping the note for updates semi-regularly. | |
| 10 | 2025-10-07 16:14 | commented | Daitruxdd ♦144 | https://themonmouthjournalnorthern.com/starbucks-coming-to-former-bank-of-america-site-in-union-beach-p14684-150.htm According to this source there should be construction going on. I haven’t surveyed the area in a while but last I checked the old building was demolished but no work on the new one started | |
| 11 | 2025-11-12 07:31 | commented | CurlingMan13 ♦52,160 | Has construction started so we can move the lifecycle up to construction? | |
| 12 | 2026-01-04 05:05 | closed | DawsZed ♦229 | Closing this note as it is misleading about the present status of this location. No construction seen here on multiple resurveys. | |
| 4736289 Category: unknown | 1 | 2025-05-01 05:07 | opened | Daitruxdd ♦144 | building is being demolished |
| 2 | 2025-09-10 01:04 | commented | CurlingMan13 ♦52,160 | map reflects this already. What else is being done? What else needs to be added from the note to resolve it? | |
| 3 | 2025-10-02 05:15 | commented | CurlingMan13 ♦52,160 | Any update on construction or what further action(s) are required to resolve the note? | |
| 4 | 2025-10-02 21:06 | closed | Daitruxdd ♦144 | ||
| 4638913 Category: unknown | 1 | 2025-02-23 16:46 | opened | Daitruxdd ♦144 | Neilson Park construction. |
| 2 | 2025-02-23 16:46 | commented | Daitruxdd ♦144 | was scheduled for opening Fall 2024. survey needed to confirm opening/ construction progress | |
| 3 | 2025-03-05 16:31 | commented | Daitruxdd ♦144 | Surveyed today. Site still under construction. | |
| 4 | 2025-03-22 20:36 | commented | CurlingMan13 ♦52,160 | Please update check_date=* if you check it and it still under construction. We use that tag rather than notes to tag that it is still under construction or that it was the last date it was checked to determine if it is still correctly mapped. Updated to check_date=2025-02-23 for you based on note comment. | |
| 5 | 2025-05-01 16:33 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 6 | 2025-05-02 00:10 | commented | Daitruxdd ♦144 | Will survey when I get the chance | |
| 7 | 2025-05-17 00:03 | commented | Daitruxdd ♦144 | the park has been renamed to Liberty Square Park and is scheduled to open this fall | |
| 8 | 2025-06-21 01:31 | commented | Daitruxdd ♦144 | surveyed today. the lot has been regraded with new paths and stairways stating to take shape. still lots of construction going on | |
| 9 | 2025-08-27 15:22 | commented | Daitruxdd ♦144 | Surveyed today. Park looks almost complete. Still some construction going on but should be opening soon | |
| 10 | 2025-10-02 14:50 | closed | Daitruxdd ♦144 | park is now open | |
| 4957352 Category: Unknown | 1 | 2025-09-11 17:09 | opened | Daitruxdd ♦144 | New apartment building is under construction here - 200 Livingston Ave |
| 2 | 2025-09-24 20:49 | commented | CurlingMan13 ♦52,160 | Is the church to the east being demolished? | |
| 3 | 2025-09-25 10:25 | commented | Daitruxdd ♦144 | No, church is still there | |
| 4 | 2025-11-16 20:20 | commented | CurlingMan13 ♦52,160 | added construction zone. Do you have a source? | |
| 5 | 2026-01-06 23:49 | commented | CurlingMan13 ♦52,160 | Still looking for a source or update on construction progress. | |
| 4957347 Category: Unknown | 1 | 2025-09-11 15:06 | opened | Daitruxdd ♦144 | New apartment building is under construction here - 200 Livingston Ave |
| 2 | 2025-09-11 15:08 | closed | Daitruxdd ♦144 | ||
| 4623316 Category: unknown | 1 | 2025-02-11 19:12 | opened | Daitruxdd ♦144 | Bridge MT-10 Replacement. Scheduled to open Fall 2025 |
| 2 | 2025-02-16 22:17 | commented | DawsZed ♦229 | Confirmed this by survey, added access tagging for the roads here. | |
| 3 | 2025-03-22 21:32 | commented | CurlingMan13 ♦52,160 | Added note text "Bridge MT-10 Replacement. Scheduled to open Fall 2025" to note=* tag on ways. | |
| 4 | 2025-09-09 20:06 | commented | CurlingMan13 ♦52,160 | Any update on construction? #WorkingTheNotes | |
| 5 | 2025-09-09 20:53 | commented | Daitruxdd ♦144 | As of 2 weeks ago it was still under construction | |
| 6 | 2025-10-15 05:01 | commented | CurlingMan13 ♦52,160 | Has it reopened yet? | |
| 7 | 2025-10-27 18:14 | commented | CurlingMan13 ♦52,160 | No response received. Is construction complete yet? | |
| 8 | 2025-10-27 20:11 | commented | DawsZed ♦229 | Not open yet, still under construction, signs for closure are still up with construction equipment on site. | |
| 9 | 2026-01-03 22:07 | closed | DawsZed ♦229 | Construction complete. Tagged as open. | |
| 4940254 Category: Unknown | 1 | 2025-09-01 03:18 | opened | Daitruxdd ♦144 | Building under construction - 50 Easton Ave |
| 2 | 2025-09-09 18:12 | commented | CurlingMan13 ♦52,160 | Is "50 Easton Ave" the actual name or just the address? Also, all information from note already incorporated into construction area. Please advise what else needs to be done to resolve note. | |
| 3 | 2025-09-09 18:57 | commented | Daitruxdd ♦144 | Building outline could be added if up to date areal imagery is available | |
| 4 | 2025-09-24 18:51 | commented | CurlingMan13 ♦52,160 | It won't be for several years, more than likely. But I will check periodically and update note accordingly I guess until then. | |
| 5 | 2025-10-15 03:11 | commented | CurlingMan13 ♦52,160 | No updates found on aerial imagery. | |
| 4454300 Category: unknown | 1 | 2024-09-27 00:24 | opened | Daitruxdd ♦144 | Route 35 Redevelopment construction |
| 2 | 2025-01-01 02:27 | commented | CurlingMan13 ♦52,160 | Do you have any update? And do you know what is being built here? | |
| 3 | 2025-01-01 06:20 | commented | Daitruxdd ♦144 | looks to be a self storage complex | |
| 4 | 2025-01-01 15:56 | commented | DawsZed ♦229 | I saw this place a few days ago, the steel structure for maybe 3 buildings are up, fenced off with lots of construction vehicles | |
| 5 | 2025-02-28 17:44 | commented | CurlingMan13 ♦52,160 | Any update? Would you be able to add the buildings based on your local survey? | |
| 6 | 2025-03-03 09:18 | commented | DawsZed ♦229 | Still under construction, added the buildings I saw when I visited here yesterday: https://i.imgur.com/kWd4I3Y.png https://i.imgur.com/xiWDFVg.png | |
| 7 | 2025-05-08 03:12 | commented | CurlingMan13 ♦52,160 | Added shop=storage_rental Do you know what brand? | |
| 8 | 2025-05-08 13:02 | commented | Daitruxdd ♦144 | Not sure at the moment. Will update when I know | |
| 9 | 2025-08-10 13:43 | commented | DawsZed ♦229 | From survey today, appears to be a SecureSpace Self Storage facility. Opens August 28, 2025 per earliest website booking date (https://securespace.com/storage-units/nj/south-amboy-self-storage/1970-nj-35-south-amboy-nj-08879). Updated tagging. | |
| 10 | 2025-09-09 18:06 | commented | CurlingMan13 ♦52,160 | Is it open yet? Can note be closed since no further action is required? | |
| 11 | 2025-09-09 18:54 | commented | Daitruxdd ♦144 | not sure if it’s open yet but there wasn’t any construction going on as of last week. Note can be closed and construction area removed/building tags updated | |
| 12 | 2025-09-10 01:10 | closed | CurlingMan13 ♦52,160 | updated status of building. Fixed storage unit tagging. left note on C/S. | |
| 4932989 Category: Unknown | 1 | 2025-08-27 15:21 | opened | Daitruxdd ♦144 | Albany parking deck is being demolished and is going to be replaced with 11 spring street, new apartment building |
| 2 | 2025-09-09 18:10 | commented | CurlingMan13 ♦52,160 | Is 11 Spring Street the name of the new apartment complex or is it the address? | |
| 3 | 2025-09-09 18:53 | commented | Daitruxdd ♦144 | As far as I know it’s both | |
| 4 | 2025-10-15 03:10 | commented | CurlingMan13 ♦52,160 | Cool, name and address added, construction zone already mapped. No further information in note outstanding that still needs to be added. If this is a personal note you are using to remond yourself of construction, then the note should be closed. If not, please provide additional information on what needs to be added so it can be added and note can be closed. Notes should not be used as personal reminders or personal notes that have no information to offer that is not already mapped. | |
| 4936168 Category: Unknown | 1 | 2025-08-29 15:16 | opened | Daitruxdd ♦144 | New warehouse construction |
| 2 | 2025-09-09 18:12 | commented | CurlingMan13 ♦52,160 | Construction area already mapped. | |
| 3 | 2025-09-24 18:53 | commented | CurlingMan13 ♦52,160 | Not on aerial imagery yet. | |
| 4 | 2025-10-30 01:54 | commented | CurlingMan13 ♦52,160 | removed the name. A name is only a name. That was an address. | |
| 4933003 Category: Unknown | 1 | 2025-08-27 15:22 | opened | Daitruxdd ♦144 | New Brunswick water tower is under construction. |
| 2 | 2025-09-09 18:13 | commented | CurlingMan13 ♦52,160 | Looks like construction area was already added. | |
| 3 | 2025-09-10 01:03 | commented | CurlingMan13 ♦52,160 | added source to construction area. | |
| 4 | 2025-10-02 05:14 | commented | CurlingMan13 ♦52,160 | Providing update to open note: Nothing on aerial imagery yet besides the (old) water tower. | |
| 5 | 2025-11-16 19:36 | commented | CurlingMan13 ♦52,160 | Nothing on aerial imagery. Do you have any updates on construction? | |
| 4443716 Category: unknown | 1 | 2024-09-20 00:25 | opened | Daitruxdd ♦144 | this is the site of the Health and life Science Exchange (Helix, NJ), a 3 building complex with laboratories, office space and housing units. the first building, H1 is scheduled to open in late 2025/ early 2026 and is going to house Rutgers Medical School, New Jersey Innovation Hub and Translational research space. |
| 2 | 2025-03-27 20:31 | commented | CurlingMan13 ♦52,160 | Is the full name "Health and life Science Exchange" And the nickname "Helix"? If so, the non-abbreviated name should be used. | |
| 3 | 2025-04-27 14:46 | commented | Daitruxdd ♦144 | the non-abbreviated name is not commonly used. I put it under the official name tag instead. also as a side note the groundbreaking of the second phase H-2 is expected by the end of this year | |
| 4 | 2025-07-09 12:16 | commented | Daitruxdd ♦144 | H-1 is now scheduled to be completed by March 2026 construction on H-2 has begun and is scheduled for competition in late 2027 Spring street has been closed for about a year as part of H-2 construction | |
| 5 | 2025-08-15 08:24 | commented | CurlingMan13 ♦52,160 | Is Spring Street reopened? | |
| 6 | 2025-08-27 15:20 | commented | Daitruxdd ♦144 | No. Will be closed for about a year. | |
| 7 | 2025-10-30 01:56 | commented | CurlingMan13 ♦52,160 | Nothing on aerial imagery except the bare ground. | |
| 8 | 2025-11-16 19:27 | commented | CurlingMan13 ♦52,160 | Any update on construction progress for Helix 1? | |
| 4932984 Category: Unknown | 1 | 2025-08-27 15:19 | opened | Daitruxdd ♦144 | Hildebrand Commons construction. Going on here. |
| 2 | 2025-09-09 18:09 | commented | CurlingMan13 ♦52,160 | Looks like you added all the info to the construction area already from note. No action required for note. | |
| 3 | 2025-09-24 18:51 | commented | CurlingMan13 ♦52,160 | Not on aerial imagery. | |
| 4 | 2025-10-30 01:55 | commented | CurlingMan13 ♦52,160 | Not on aerial imagery... yet. | |
| 5 | 2025-11-16 19:23 | commented | CurlingMan13 ♦52,160 | Updated expected opening date of Fall 2026. All details from note incorporated. Any reason to keep the note open until 2026 since there is no info from note not incorporated? Also, no signs of construction on latest imagery. | |
| 4448092 Category: unknown | 1 | 2024-09-23 01:43 | opened | Daitruxdd ♦144 | new roundabout is being built here, leaving note as a reminder to update area as construction progresses. |
| 2 | 2025-01-22 00:52 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 3 | 2025-01-22 17:10 | commented | Daitruxdd ♦144 | someone has been updating the roads so everything looks accurate as of the time I'm writing this. | |
| 4 | 2025-01-23 21:50 | commented | DawsZed ♦229 | That someone is me! Survey today looks like the forest area for the roundabout area has been cleared and graded flat with gravel, but otherwise no curbs or pavement yet. | |
| 5 | 2025-03-22 20:30 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 6 | 2025-03-23 00:38 | commented | Daitruxdd ♦144 | Doesn’t look like there’s been much going on recently | |
| 7 | 2025-03-27 19:53 | commented | Daitruxdd ♦144 | updated the driveways to be separate | |
| 8 | 2025-04-03 04:52 | commented | Daitruxdd ♦144 | updated road layout based on survey | |
| 9 | 2025-05-08 03:10 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 10 | 2025-05-08 13:01 | commented | Daitruxdd ♦144 | Surveyed last weekend. Not much going on. Construction is pretty slow at the moment | |
| 11 | 2025-05-25 16:37 | commented | Daitruxdd ♦144 | surveyed today. an outline of new road layout is starting to take shape with the center and splitter islands starting to appear along with curbs and sidewalks | |
| 12 | 2025-05-29 06:01 | commented | CurlingMan13 ♦52,160 | updated last_checked=* to 2025-05-25 based on your note | |
| 13 | 2025-07-14 01:05 | commented | Daitruxdd ♦144 | Surveyed today 6/13/25 Roundabout is now open to traffic however there is still continuing construction going on in the area | |
| 14 | 2025-07-14 23:16 | commented | DawsZed ♦229 | Ran a GPS trace today of the new alignment, added the new traffic circle to the map (https://www.openstreetmap.org/?mlat=40.39915048&mlon=-74.02323302&display-gpx=12020122). | |
| 15 | 2025-07-14 23:32 | commented | CurlingMan13 ♦52,160 | What further construction is there that would prevent resolution of this note? | |
| 16 | 2025-08-04 05:31 | commented | CurlingMan13 ♦52,160 | Any update on what additional mapping is required? | |
| 17 | 2025-08-04 06:03 | commented | DawsZed ♦229 | Honestly, this is practically done. Valley Drive's approach is not yet permanent (outlined with cones), and there's a telephone pole in the roundabout. Yet, the final alignment of the roads and center island are done, it matches the final blueprints I've seen online. Nothing else missing or incorrect, future imagery and future removal of the construction area aside. | |
| 18 | 2025-08-04 18:11 | closed | DawsZed ♦229 | ||
| 4836749 Category: unknown | 1 | 2025-07-03 00:56 | opened | Daitruxdd ♦144 | 213 French St - new mixed used building under construction |
| 2 | 2025-08-04 07:32 | commented | CurlingMan13 ♦52,160 | construction area already mapped. | |
| 3 | 2025-10-02 07:15 | commented | CurlingMan13 ♦52,160 | Any update on construction? Nothing on aerial imagery yet. | |
| 4 | 2025-10-30 04:19 | commented | CurlingMan13 ♦52,160 | Following up on previous question regarding your note. Any update on construction? Nothing on the latest aerial imagery. | |
| 5 | 2025-11-16 20:33 | commented | CurlingMan13 ♦52,160 | Nothing on the latest aerial imagery. | |
| 6 | 2026-01-14 13:42 | commented | valvacc ♦27 | we really need some updated imagery lol. i've been following this chain of notes and couldn't help but laugh | |
| 4836750 Category: unknown | 1 | 2025-07-02 22:57 | opened | Daitruxdd ♦144 | Delco lead and county yard construction |
| 2 | 2025-08-15 08:24 | commented | CurlingMan13 ♦52,160 | Beyond marking as a construction zone, what other action needs to be taken? https://www.njtransit.com/press-releases/nj-transit-breaks-ground-county-yard-and-delco-lead-storage-inspection-facility | |
| 3 | 2025-09-24 18:54 | commented | CurlingMan13 ♦52,160 | I believe the full and correct name is actually: County Yard and Delco Lead Storage and Inspection Facility | |
| 4 | 2025-11-16 19:35 | commented | CurlingMan13 ♦52,160 | Please ensure you are using the full, correct name. Nicknames do not belong under name=* Updated name. Nothing on aerial imagery yet. | |
| 4832594 Category: unknown | 1 | 2025-06-30 16:15 | opened | Daitruxdd ♦144 | Spark Car Wash Construction |
| 2 | 2025-07-04 07:18 | commented | CurlingMan13 ♦52,160 | Scheduled opening date? | |
| 3 | 2025-08-22 12:17 | closed | Earl harrison | ||
| 4580693 Category: unknown | 1 | 2025-01-07 18:50 | opened | CurlingMan13 ♦52,160 | Upgrades to this station coming https://www.metroparkrevitalizationinfo.com/ |
| 2 | 2025-06-24 21:30 | commented | Daitruxdd ♦144 | added construction areas for the new health and wellness center as well as the new luxury apartments. A new bus plaza is also under construction but I wasn't able to get to it while I was in the area | |
| 3 | 2025-07-04 07:05 | commented | CurlingMan13 ♦52,160 | Once construction area(s) are drawn with link to link in original comment, I am fine with closing note sonce the construction progress will be tracked in construction area. | |
| 4 | 2025-10-02 05:18 | closed | CurlingMan13 ♦52,160 | Construction areas drawn. all info from note incorporated. no further action erquired. | |
| 4807227 Category: unknown | 1 | 2025-06-15 15:22 | opened | --- | New construction here. Need to map expansion. https://www.northjersey.com/story/news/transportation/2025/06/13/newark-airport-train-station-access-facility/84191302007/ |
| 2 | 2025-06-24 21:15 | commented | Daitruxdd ♦144 | added construction area | |
| 3 | 2025-07-04 07:06 | closed | CurlingMan13 ♦52,160 | I was the original anonymous note. Wasn't logged in at the time. Construction area should not be named. But since construction area is now marked, there is no further action needed. | |
| 4815287 Category: unknown | 1 | 2025-06-21 01:18 | opened | Daitruxdd ♦144 | Hildebrand Commons construction |
| 2 | 2025-08-04 05:41 | closed | CurlingMan13 ♦52,160 | added details to construction area. https://www.pennrose.com/apartments/new-jersey/hildebrand-commons/ | |
| 4736290 Category: unknown | 1 | 2025-05-01 05:08 | opened | Daitruxdd ♦144 | station bay phase II under construction |
| 2 | 2025-05-11 04:52 | commented | CurlingMan13 ♦52,160 | Seems it should be apartments... Added tag: landuse=construction | |
| 3 | 2025-06-12 20:40 | commented | Daitruxdd ♦144 | The building is now called ”The pearl at Station Bay” and it looks to have been completed. I’m not 100% certain tho so a survey is necessary before construction tag can be removed and note is closed out | |
| 4 | 2025-06-18 02:49 | closed | DawsZed ♦229 | Confirmed name by survey tonight, close out construction as building looks complete. Added rough outline of building, which can be further refined later as new imagery eventually comes out. | |
| 4788474 Category: unknown | 1 | 2025-06-03 14:23 | opened | Daitruxdd ♦144 | new Lyndhurst Train Station is scheduled to open Monday June 8, 2025. the old station will subsequently close along with Kingsland station. |
| 2 | 2025-06-09 22:16 | closed | Daitruxdd ♦144 | Station is now opened; construction tags, old station and the now closed Kingsland station have been removed | |
| 4762944 Category: unknown | 1 | 2025-05-17 00:11 | opened | O-dog-Malakai ♦315 | Can the speed limit be changed from 60 mph to 55 mph north of this bridge? |
| 2 | 2025-05-29 06:03 | commented | CurlingMan13 ♦52,160 | But I don't see any speed limit signs near here? | |
| 3 | 2025-05-30 21:51 | commented | O-dog-Malakai ♦315 | So how it works is that there is a link below indicating that when a speed limit sign is variable meaning that it is dynamic and electronic, the "maxspeed" = "signals" tag can be replaced with "maxspeed:variable" = "yes" and add in the default speed limit as seen in the second source. First Source: https://wiki.openstreetmap.org/wiki/Key:maxspeed:variable Second Source: https://www.law.cornell.edu/regulations/new-jersey/N-J-A-C-19-9-1-2 | |
| 4 | 2025-05-30 22:22 | commented | CurlingMan13 ♦52,160 | Ah, gotcha. Yeah all of TPKE is variable, well, at least this area. I can update later to add variable speed limit tags. I thought you were asking/suggesting changing it from 60 to 55. I've seen this area as 45mph before. Actually, usually 45 due to traffic. Lol | |
| 5 | 2025-06-04 11:54 | commented | Daitruxdd ♦144 | according to the straight line diagram Tremley Point Road in Linden is where the speed limit changes from 65 to 55 going north. source: https://njsld.org/NJDOT/SLD/SheetViewer/00000095__/51/4 | |
| 6 | 2025-06-04 13:17 | commented | CurlingMan13 ♦52,160 | Daitruxdd, You linked to the truck lanes, and this note is more for the car lanes. While that it moght be the same, they aren't due to truck traffic and merging lanes. Furthermore, there are no speed limit signs near here, making it a bit more difficult. You would need to check signage from there going north through here. I thought the SL was faster than 55 north to here. Again, we will need to check inagery to confirm. Mapillary has a great signage filter that allows easy viewing of speed limits without having to sort through all the images. | |
| 7 | 2025-06-04 15:20 | commented | Daitruxdd ♦144 | The SDL diagram clearly shows that the speed limit is 55 north of the segment provided in both directions for both the inner and outer roadways. Variable speed limits signs exist on this segment to adjust the speed limits based on conditions such as traffic, accidents or construction when needed. The road should be tagged as 55mph as that’s the “official” speed limit. An additional tag may be used to indicate that the speed limit is variable and subject to change if conditions make it necessary | |
| 8 | 2025-06-13 10:25 | commented | DawsZed ♦229 | The variable speed limit signs on the NJTP are mounted overhead with variable message boards - there's actually one just south of this note (https://www.mapillary.com/app/?pKey=370806464471016&focus=photo). As Daitruxdd found, the SLD shows the 65 -> 55 reduction begins much further south, near Tremley Point Road, and extends all the way north to the GWB. Checking Mapillary near Tremley, imagery does show 55 for both NB sides on a good day (https://www.mapillary.com/app/?pKey=527166115250771&focus=photo), and it's outlined in yellow to emphasize the start of reduction (https://www.mapillary.com/app/?pKey=1801176037332516&focus=photo). Poked at a few more NB signs north of here and they all look to be set to 55 as well. Here at the Eastern spur (https://www.mapillary.com/app/?pKey=2942351499330665&focus=photo), Western spur (https://www.mapillary.com/app/?pKey=286467283179373&focus=photo) and nearing the GWB (https://www.mapillary.com/app/?pKey=484115809679935&focus=photo). | |
| 9 | 2025-06-13 23:22 | commented | O-dog-Malakai ♦315 | Great discussion. Should I go ahead and change the speed limit from 60 mph to 55 mph on this road or keep it 60 mph? | |
| 10 | 2025-06-14 01:38 | commented | DawsZed ♦229 | Feel free to set the default speed limit to 55mph, I feel the evidence supports that for NJTP north of Tremley Point Road (40.611903, -74.223569). | |
| 11 | 2025-10-03 01:05 | closed | CurlingMan13 ♦52,160 | Updated from Tremley Point Road to the 95-80 junction. Added maxspeed=55mph and maxspeed:variable=yes | |
| 4713650 Category: unknown | 1 | 2025-04-16 18:01 | opened | Daitruxdd ♦144 | Sansone Jr's Keyport Kia - new dealership under construction |
| 2 | 2025-05-08 03:07 | commented | CurlingMan13 ♦52,160 | added brand tags and shop=car to construction area. | |
| 3 | 2025-05-11 04:56 | commented | CurlingMan13 ♦52,160 | Added building. Tagged as closed since you still have it marked as construction zone. Removed dealership tag from construction zone and added to building. | |
| 4 | 2025-05-29 05:56 | commented | CurlingMan13 ♦52,160 | Is it a different building than the one already on imagery? | |
| 5 | 2025-05-29 20:18 | commented | Daitruxdd ♦144 | Im not sure honesty | |
| 6 | 2025-06-04 05:01 | commented | CurlingMan13 ♦52,160 | I only ask since the building that is mapped looks pretty new. What makes you say there is construction? is it fenced? | |
| 7 | 2025-06-04 12:11 | commented | Daitruxdd ♦144 | There were construction vehicles and equipment present and the site was fenced off and a big billboard up the road stated that it’s coming soon. It’s possible that construction has finished now as it was pretty close to completion last time I drove past. If construction is completed and the building is mapped the note can be closed | |
| 8 | 2025-06-28 15:55 | closed | DawsZed ♦229 | Confirmed open by survey today. Added information to building, remove construction area. | |
| 4724189 Category: unknown | 1 | 2025-04-23 13:41 | opened | Mateusz Konieczny ♦36,913 | https://www.openstreetmap.org/way/313208090/history is this tiny rail section really used? likely railway and station is disused, or that disused rail is in fact not disused |
| 2 | 2025-06-01 14:48 | commented | Daitruxdd ♦144 | The line is used by Cape May seashore lines. However service on this line has been suspended since 2012 due to vandalism and track damage. | |
| 3 | 2025-07-04 09:33 | commented | CurlingMan13 ♦52,160 | So it should be changed to disused or abandoned? | |
| 4 | 2026-01-19 06:10 | commented | Natfoot ♦566 | I changed some things but left the active rail here. there is a tourist rail rider operation on the mapillary 360. I changed the railway tracks in the parking lot to persevered and added the parking isle | |
| 4772419 Category: unknown | 1 | 2025-05-23 16:50 | opened | Daitruxdd ♦144 | Broad street has been renamed to “Mayor Kenneth A. Gibson Boulevard” back in 2019. Street signs reflect this change however. Addresses along the road are still listed at Broad street. Same goes for bus stops and the light rail station. |
| 2 | 2025-05-29 05:31 | closed | CurlingMan13 ♦52,160 | Already tagged as such. Official_name=* is used. name=Broad Street is correct. It was changed many years ago and was already updated. https://www.openstreetmap.org/changeset/70294074 Name tags were then updated to be consistent a couple years ago: https://www.openstreetmap.org/changeset/135352618 No further action needed since map is already correct. | |
| 3 | 2025-05-29 05:31 | reopened | CurlingMan13 ♦52,160 | ||
| 4 | 2025-05-29 05:34 | commented | CurlingMan13 ♦52,160 | Or are you suggesting that "Mayor" needs to be added to official_name? Seems to depend on source, though if you think it should be added, then I don't disagree. https://www.njspotlightnews.org/2019/05/newark-renames-broad-street-in-honor-of-ken-gibson/ | |
| 5 | 2025-05-29 20:17 | commented | Daitruxdd ♦144 | Yes ”Mayor” is part of the name at least that’s what the street signs have it as | |
| 6 | 2025-05-30 02:44 | closed | CurlingMan13 ♦52,160 | updated to: official_name=Mayor Kenneth A. Gibson Boulevard alt_name=Kenneth A. Gibson Boulevard | |
| 4736293 Category: unknown | 1 | 2025-05-01 05:09 | opened | Daitruxdd ♦144 | Riverton development under construction |
| 2 | 2025-05-01 16:33 | commented | CurlingMan13 ♦52,160 | Area already marked as a construction zone. Roads roughly added. What is the estimated completion date? | |
| 3 | 2025-05-02 00:12 | commented | Daitruxdd ♦144 | Not sure. Work had been pretty slow So far only the bass pro shop building can be seen starting to take shape. Theres a lot more planned for the project so it probably gonna be a few years at least | |
| 4 | 2025-05-25 17:00 | commented | Daitruxdd ♦144 | added a rough outline of the Bass pro shop | |
| 5 | 2025-06-16 23:04 | commented | DawsZed ♦229 | Thanks for adding the Bass Pro Shop, I just saw it under construction recently too. This construction site has been pushing dirt around since 2009, it's great there's finally some tangible progress here. Here's their current progress document, in the About section of their website: https://riverton.com/wp-content/uploads/2025/05/2025-Riverton-Brochure-Rev-5.5.25.pdf The phasing diagram suggests about half the land developed by 2029. Over the years, they've been routinely pushing back these estimates. I don't consider them trustworthy, the Bass Pro Shop was expected to open a decade ago, then 2018, then they went silent until now. | |
| 6 | 2025-07-17 02:58 | closed | Thereal0000000000 | ||
| 4671883 Category: unknown | 1 | 2025-03-19 19:43 | opened | jhaluska80 ♦2,826 | The speed limits for US 1/US 9 are mapped as 50 mph, but the speed limit as signed is 45 mph. I corrected one Southbound section but the area needs further work. |
| 2 | 2025-05-25 16:50 | commented | Daitruxdd ♦144 | based on the straight line diagram (https://njsld.org/NJDOT/SLD/SheetViewer/00000001__/38/4) the section between just south of Randolph Ave and train overpass near avenue C is 45 in both directions. with 50 speed limits south of this segment and 40 north of it | |
| 3 | 2025-10-04 01:20 | commented | CurlingMan13 ♦52,160 | I think I got the speed limits sorted out. | |
| 4 | 2025-10-15 03:15 | closed | CurlingMan13 ♦52,160 | Meant to close note. I believe I got it sorted out per my previous note comment. Haven't heard otherwise. | |
| 4691873 Category: unknown | 1 | 2025-04-01 16:24 | opened | Pjap70 ♦0 | This entrance to leisure village is for residents with a barcode on their windows. Not for non residents, uber, lyft, deliveries, etc.. next gate at Buckingham and rt 70 is correct entrance |
| 2 | 2025-04-01 16:24 | closed | Pjap70 ♦0 | ||
| 3 | 2025-04-01 16:25 | reopened | Pjap70 ♦0 | ||
| 4 | 2025-04-02 01:23 | closed | jhaluska80 ♦2,826 | I fixed the tag on this road. The private tag should keep people from being routed to here. I added delivery access to the other entrance. | |
| 5 | 2025-04-02 13:41 | reopened | Pjap70 ♦0 | ||
| 6 | 2025-04-02 13:43 | commented | Pjap70 ♦0 | It's still routing Lyft to go through this private gate. Is it because it will take a bit of time for it to kick in? I appreciate any help! This issue has been frustrating on many levels.. Thank you! | |
| 7 | 2025-04-02 16:19 | commented | jhaluska80 ♦2,826 | I can image that being frustrating, but you're in the right place to resolve the issue. I did a second pass and updated all the road tags inside the Village to have access:delivery=yes and explicitly tagged that entrance as not having delivery (so it doesn't get added in the future). This should resolve the issue as their router should have a complete path that uses the access:delivery tag. I'm just a NJ OSM volunteer mapper, but I do know Lyft has a bit of a delay as they work off a copy of the map and have their own team that usually handles these changes. You can try reaching out to them directly. dct-osm@lyft.com or message technician_lyft and make them aware of the issue and ask them to double check my work. Please close this note once you have confirmed it's resolved. | |
| 8 | 2025-04-05 06:09 | commented | CurlingMan13 ♦52,160 | jhaluska80, thanks for the quick action. We had a discussion about this recently on discord. I think it was Taya or Fizzie that helped me with another complex. Realistically, there aren't a ton of options available to show a "preferred" entry. In that case I had, I think I just made the secondary entry as access=private, then the other ones access=permit. Pjap70 - I'm another OSM contributor who lives local and travels 70 quite regularly. This entrance is lacking signage to indiciate all traffic needs to use the main gate down the road. I would encourage you to contact HOA to improve signage. As a local though, I know all visitor access is only from that main gate anyhow. | |
| 9 | 2025-04-05 06:12 | commented | CurlingMan13 ♦52,160 | Correction. I used a combination of access=private and access=permissive. | |
| 10 | 2025-05-25 16:39 | commented | Daitruxdd ♦144 | has this issue been resolved? can the note be closed? | |
| 11 | 2025-05-26 13:31 | closed | Pjap70 ♦0 | The issue is resolved! Thank you everyone for your comments and help! | |
| 4754306 Category: unknown | 1 | 2025-05-11 21:40 | opened | --- | Spencer's |
| 2 | 2025-05-25 16:35 | closed | Daitruxdd ♦144 | added | |
| 4754307 Category: unknown | 1 | 2025-05-11 21:42 | opened | --- | Misty Rose by Merkk |
| 2 | 2025-05-25 16:35 | closed | Daitruxdd ♦144 | added | |
| 4754309 Category: unknown | 1 | 2025-05-11 21:46 | opened | --- | Color Me Mine |
| 2 | 2025-05-25 16:34 | closed | Daitruxdd ♦144 | added | |
| 4754325 Category: unknown | 1 | 2025-05-11 22:17 | opened | --- | Freehold Athletic Club https://www.freeholdathleticclub.com/ level=0 |
| 2 | 2025-05-25 16:34 | closed | Daitruxdd ♦144 | added | |
| 4754324 Category: unknown | 1 | 2025-05-11 22:13 | opened | --- | Dave and Buster's opening May 12 level=0 |
| 2 | 2025-05-25 16:34 | closed | Daitruxdd ♦144 | added | |
| 4754318 Category: unknown | 1 | 2025-05-11 22:07 | opened | --- | Fan Treasures Sports team merchandise Top level level=1 |
| 2 | 2025-05-25 16:34 | commented | Daitruxdd ♦144 | added | |
| 3 | 2025-05-25 16:34 | closed | Daitruxdd ♦144 | ||
| 4754311 Category: unknown | 1 | 2025-05-11 21:51 | opened | --- | Custom Land This tag seems accurate: Tag:shop=printing |
| 2 | 2025-05-25 16:34 | closed | Daitruxdd ♦144 | added | |
| 4754312 Category: unknown | 1 | 2025-05-11 21:53 | opened | --- | Cards 2 Go Trading card shop Probably: Tag:shop=games |
| 2 | 2025-05-25 16:34 | closed | Daitruxdd ♦144 | added | |
| 4747651 Category: unknown | 1 | 2025-05-08 04:20 | opened | CurlingMan13 ♦52,160 | Golf cleanup: Update cartpaths to correct tags |
| 2 | 2025-05-25 16:17 | closed | Daitruxdd ♦144 | changed ways from service road to golf cartpath. | |
| 4650194 Category: unknown | 1 | 2025-03-03 18:57 | opened | Daitruxdd ♦144 | Pine Brook Pump Station and Storage tank |
| 2 | 2025-03-03 18:58 | commented | Daitruxdd ♦144 | ^Construction going on here | |
| 3 | 2025-03-09 22:27 | commented | CurlingMan13 ♦52,160 | Any estimate on completion? | |
| 4 | 2025-05-01 16:29 | closed | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 5 | 2025-05-01 16:29 | reopened | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 6 | 2025-05-02 00:08 | commented | Daitruxdd ♦144 | Tired surveying today however I couldn’t get to the site since the road was closed | |
| 7 | 2025-05-16 19:37 | commented | Daitruxdd ♦144 | surveyed the other day. there's a lot going on however not structures can be seen as of yet | |
| 8 | 2025-07-17 02:58 | closed | Thereal0000000000 | ||
| 4762754 Category: unknown | 1 | 2025-05-16 19:33 | opened | Daitruxdd ♦144 | 49 Shark River Road - new warehouse under construction |
| 2 | 2025-05-21 02:37 | commented | CurlingMan13 ♦52,160 | added type to building tag. | |
| 3 | 2025-08-04 05:52 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 4 | 2025-09-24 18:49 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 5 | 2025-10-15 02:58 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 6 | 2025-10-27 17:07 | closed | CurlingMan13 ♦52,160 | Updated imagery available. No responses received on status of construction. All information from note incorporated. | |
| 4443747 Category: unknown | 1 | 2024-09-20 02:11 | opened | Daitruxdd ♦144 | this area is the site of the Jack and Sheryl Morris Cancer Center currently under construction and set to open in 2025 |
| 2 | 2025-01-22 01:19 | commented | CurlingMan13 ♦52,160 | It's 2025. open yet? | |
| 3 | 2025-01-22 17:08 | commented | Daitruxdd ♦144 | not yet. but construction seems mostly compete. should be opened very soon. | |
| 4 | 2025-02-11 17:45 | commented | Daitruxdd ♦144 | It is scheduled to open in May 2025 | |
| 5 | 2025-05-01 16:33 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 6 | 2025-05-02 00:12 | commented | Daitruxdd ♦144 | Almost complete. Should be opened very soon | |
| 7 | 2025-05-05 17:22 | commented | Daitruxdd ♦144 | Unveiling ceremony is scheduled for May 13th | |
| 8 | 2025-05-13 11:31 | closed | Daitruxdd ♦144 | construction complete | |
| 4736296 Category: unknown | 1 | 2025-05-01 05:17 | opened | Daitruxdd ♦144 | new building construction |
| 2 | 2025-05-08 03:09 | commented | CurlingMan13 ♦52,160 | Do you know what it is or what it will be? | |
| 3 | 2025-05-08 12:59 | commented | Daitruxdd ♦144 | Not sure at the moment | |
| 4 | 2025-05-11 05:01 | commented | CurlingMan13 ♦52,160 | Was old building demolished? | |
| 5 | 2025-05-12 16:02 | commented | Daitruxdd ♦144 | Yes old building no longer exists | |
| 6 | 2025-05-29 05:57 | commented | CurlingMan13 ♦52,160 | Added demolished:building=yes to the building that is on imagery. | |
| 7 | 2025-09-13 19:46 | closed | DawsZed ♦229 | From survey today, building is substantially complete. Added building and remove construction area. | |
| 4750551 Category: unknown | 1 | 2025-05-09 19:19 | opened | Daitruxdd ♦144 | Barclay Square at Holmdel - new apartment building under construction |
| 2 | 2025-05-11 05:00 | commented | CurlingMan13 ♦52,160 | Adjusted site plan footprint based on available site plan for owned land https://www.holmdelpolice.org/DocumentCenter/View/2992/Exhibit-A-3-Regional-Layout | |
| 3 | 2025-09-10 01:13 | commented | CurlingMan13 ♦52,160 | Providing update on open note - No signs of construction on aerial imagery | |
| 4 | 2025-10-27 17:14 | commented | CurlingMan13 ♦52,160 | Providing update since note is still open despite all info being mapped. No signs of construction on latest aerial imagery. Please advise if construction has actually started or the latest status. | |
| 4556557 Category: unknown | 1 | 2024-12-19 03:44 | opened | Daitruxdd ♦144 | Azalea Red Bank |
| 2 | 2024-12-19 05:19 | closed | CurlingMan13 ♦52,160 | named as such. | |
| 3 | 2024-12-19 05:47 | reopened | Daitruxdd ♦144 | ||
| 4 | 2024-12-19 05:48 | commented | Daitruxdd ♦144 | leaving note open as a reminder to update the map once construction is finished | |
| 5 | 2024-12-19 05:56 | closed | CurlingMan13 ♦52,160 | But it is added as a construction zone though. I generally don't leave notes open when all the information contained in the note has been added. | |
| 6 | 2024-12-19 05:57 | reopened | CurlingMan13 ♦52,160 | ||
| 7 | 2024-12-19 05:57 | commented | CurlingMan13 ♦52,160 | But it is added as a construction zone though. I generally don't leave notes open when all the information contained in the note has been added. Sorry, didn't mean to close. | |
| 8 | 2024-12-19 06:00 | commented | Daitruxdd ♦144 | it makes it easier to keep track of current construction projects that need to be frequently updated. | |
| 9 | 2025-01-27 06:46 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 10 | 2025-02-15 05:25 | commented | CurlingMan13 ♦52,160 | Any update on construction project? Has the building construction started so we can get that added? | |
| 11 | 2025-03-09 17:44 | commented | DawsZed ♦229 | Looks like it's been started for a bit, added buildings from local survey and advertisements seen on site. https://i.imgur.com/j7yysa7.jpeg | |
| 12 | 2025-05-08 03:32 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 13 | 2025-05-08 03:36 | commented | CurlingMan13 ♦52,160 | Also, found addresses and added nodes to building. | |
| 14 | 2025-05-08 13:12 | commented | Daitruxdd ♦144 | The main structure can be seen. Still a lot of work before it will be completed | |
| 15 | 2025-05-29 06:00 | commented | CurlingMan13 ♦52,160 | Based on your latest note, I updated the checked_date=* tag which allows construction zones to be identified and tracked based on when they were last checked. check_date=2025-05-08 | |
| 16 | 2025-08-26 04:51 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 17 | 2025-08-28 11:35 | commented | DawsZed ♦229 | From survey this morning, building exteriors seem to be fully built out, construction for the lot/ground (parking, drainage) still ongoing. | |
| 18 | 2025-10-15 03:03 | commented | CurlingMan13 ♦52,160 | Any update or can note be closed since all information in note is added and there is no further action required in the note? | |
| 19 | 2025-10-27 17:15 | closed | CurlingMan13 ♦52,160 | No response received. Latest imagery shows it is complete or almost complete. | |
| 4395411 Category: unknown | 1 | 2024-08-21 14:35 | opened | Daitruxdd ♦144 | Area under development, Stavbro Lane closed until November 2024 |
| 2 | 2024-08-23 19:38 | commented | Daitruxdd ♦144 | https://images1.loopnet.com/d2/acvTa1sUHPZu4WlJL6mcELvt2rfvMw8WYKrZmBvn9dg/Overall%20Site%20Layout%20Plan%20Pages%20from%20WCW%20Civil%20Plans%2061423%201%20of%203%20.pdf?_gl=1*zpblqf*_gcl_au*MTI4NjA1MjU4Mi4xNzI0NDQxNDg3*_ga*MTAzOTMwNDc2LjE3MjQ0NDE0ODg.*_ga_2DVXTE8M0Q*MTcyNDQ0MTQ4Ny4xLjEuMTcyNDQ0MTYxNS4xNy4wLjA. | |
| 3 | 2024-08-23 20:26 | commented | Daitruxdd ♦144 | Marked off the area as under construction and changed the road geometry. | |
| 4 | 2024-12-19 05:59 | commented | CurlingMan13 ♦52,160 | Any update on this? November 2024 has passed. Generally I don't do an intermediary and mark it as closed since even when it is fully reopened, it might show closed for many months on other navigation applications. | |
| 5 | 2024-12-19 06:05 | commented | Daitruxdd ♦144 | it was still closed last time checked a few weeks ago. might be opened now. | |
| 6 | 2024-12-26 19:06 | commented | DawsZed ♦229 | Surveyed today, not open. Pavement is down, but no striping and it's not connected with the roadway. There's still signs and a concrete curb in the middle of where it's meant to connect with the existing road. | |
| 7 | 2025-02-25 18:58 | commented | Daitruxdd ♦144 | Road is still not open as of today. multiple buildings can be seen and some look almost complete | |
| 8 | 2025-03-21 23:18 | commented | CurlingMan13 ♦52,160 | Any update on road status? | |
| 9 | 2025-03-23 02:45 | commented | DawsZed ♦229 | I pass by here often; jersey barriers block the road, but it's graded/connected with Wayside now. My hunch is they won't open it until the retail tenants open. Also agree with seeing buildings too, I'll add those from memory. | |
| 10 | 2025-05-08 03:21 | commented | CurlingMan13 ♦52,160 | Any update on road status? | |
| 11 | 2025-05-08 13:09 | commented | Daitruxdd ♦144 | Surveyed last weekend. Road was still closed | |
| 12 | 2025-05-11 02:50 | commented | CurlingMan13 ♦52,160 | Updated road to last checked date of 5/1/2025. left building last check date from February with construction tag(s) | |
| 13 | 2025-05-15 22:08 | commented | DawsZed ♦229 | From survey today, the jersey barriers are gone, "through" lane markings are paved on the GSP off-ramp, and the road is only coned off now. Added road classifications and set access to private. | |
| 14 | 2025-05-21 02:46 | commented | CurlingMan13 ♦52,160 | Are the roads private access meaning only a few specified people can access, or is it ownership=private meaning it is privately owned and maintained? If access=private is used, then routers will not use it, even if a customer/client has entered a destination here. | |
| 15 | 2025-05-21 20:37 | commented | DawsZed ♦229 | The first one - there aren't any public accommodations in this lot open right now, and the road is paved but coned off. My impression is that only construction contractors are allowed to use this road while building interior work is done. It's in this "in-between" phase where the road itself is not really under construction/being paved anymore, but it also isn't open to public use yet? I'm open to reverting this back if I jumped the gun on the tagging here, sorry for the hassle. | |
| 16 | 2025-07-17 02:57 | closed | Thereal0000000000 | ||
| 4453993 Category: unknown | 1 | 2024-09-26 16:58 | opened | Daitruxdd ♦144 | River Road Estates Construction |
| 2 | 2024-09-28 01:48 | closed | CurlingMan13 ♦52,160 | mapped as such already | |
| 3 | 2024-09-28 15:19 | reopened | Daitruxdd ♦144 | ||
| 4 | 2024-09-28 15:20 | commented | Daitruxdd ♦144 | I left the note open as a reminder to update the area once construction is complete | |
| 5 | 2025-01-22 01:18 | commented | CurlingMan13 ♦52,160 | Any update? | |
| 6 | 2025-01-23 21:58 | commented | Daitruxdd ♦144 | will survey tomorrow | |
| 7 | 2025-02-03 18:37 | commented | CurlingMan13 ♦52,160 | Any update? It is already tagged as a construction area, so just checking if there is any update so we can close the note out since there is no additional information contained in this note that isn't already on the map. | |
| 8 | 2025-02-03 20:48 | commented | Daitruxdd ♦144 | There seems to be a retaining wall on the south east side of the site. Can’t really see much beyond it so far | |
| 9 | 2025-05-01 16:34 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 10 | 2025-05-02 00:13 | commented | Daitruxdd ♦144 | The road is starting to take shape but other than that not much so far | |
| 11 | 2025-05-08 03:20 | commented | CurlingMan13 ♦52,160 | Is the road *really* named "Road A"? | |
| 12 | 2025-05-08 13:08 | commented | Daitruxdd ♦144 | As far as I know Road A is the name | |
| 13 | 2025-05-11 02:54 | commented | CurlingMan13 ♦52,160 | Do you have a source for that name? I don't see a source provided in the C/S or in this note chain to "track construction". What source did you use for the road name? | |
| 14 | 2025-07-17 02:58 | closed | Thereal0000000000 | ||
| 4745663 Category: unknown | 1 | 2025-05-06 20:01 | opened | Daitruxdd ♦144 | 160 Shrewsbury Ave - mixed use building under construction |
| 2 | 2025-10-02 07:12 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 3 | 2025-10-30 03:09 | commented | CurlingMan13 ♦52,160 | Extended construction area to match aerial imagery. Building that you drew looks a little long? | |
| 4 | 2026-01-14 19:58 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 4745661 Category: unknown | 1 | 2025-05-06 17:56 | opened | Daitruxdd ♦144 | 120 Monmouth St - apartments under construction |
| 2 | 2025-05-08 03:26 | commented | CurlingMan13 ♦52,160 | removed descriptive name from construction area. Added address to building and construction area. | |
| 3 | 2025-05-08 03:29 | commented | CurlingMan13 ♦52,160 | Added apartment details to building, such as number of units, levels, and that it will become an apartment when construction is complete. https://wiki.openstreetmap.org/wiki/Tag:building=construction | |
| 4 | 2025-10-15 03:02 | commented | CurlingMan13 ♦52,160 | Any update on construction or any further action required before closing out note? All information from note has already been incorporated onto the map. | |
| 5 | 2025-10-27 17:17 | closed | CurlingMan13 ♦52,160 | No response received. Latest aerial imagery shows it completed. Updated tags. | |
| 4454294 Category: unknown | 1 | 2024-09-27 02:02 | opened | Daitruxdd ♦144 | Wawa and Hyatt House Hotel Construction |
| 2 | 2024-09-28 03:48 | closed | CurlingMan13 ♦52,160 | already mapped | |
| 3 | 2024-09-28 17:20 | reopened | Daitruxdd ♦144 | ||
| 4 | 2024-09-28 17:20 | commented | Daitruxdd ♦144 | I left the note open as a reminder to update the area once construction is complete | |
| 5 | 2024-10-30 21:20 | closed | sonal_at_byte | ||
| 6 | 2024-10-30 21:37 | reopened | CurlingMan13 ♦52,160 | ||
| 7 | 2024-10-30 21:39 | commented | CurlingMan13 ♦52,160 | Not sure who sonal_at_byte is or why they are closing notes. While I don't fully agree with the not being left open, I really don't have an issue with it since it is on-going construction. Daitruxdd provided adequate reasoning and I'll hold them to coming back and not forgetting. 😉 I wish we could do like a /remindme and set a date for an automated note to be added bringing it back to our attention. | |
| 8 | 2025-05-01 18:38 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 9 | 2025-05-02 02:14 | commented | Daitruxdd ♦144 | Not much so far. Will continue to survey periodically | |
| 10 | 2025-09-10 03:05 | commented | CurlingMan13 ♦52,160 | Any update? Just making the rounds to close out notes where there is no further action required from the note (ie no info that isn't on the map that needs to be added). | |
| 11 | 2025-10-02 07:16 | commented | CurlingMan13 ♦52,160 | Adding update to open note for all parties interested in frequent updates via notes: Nothing on aerial imagery yet. | |
| 12 | 2025-10-27 18:20 | commented | CurlingMan13 ♦52,160 | Any update? Nothing on aerial imagery yet. | |
| 13 | 2025-11-16 20:43 | commented | CurlingMan13 ♦52,160 | added address to businesses here. | |
| 14 | 2025-11-16 20:44 | commented | CurlingMan13 ♦52,160 | Checked Wawa site. Doesn't look like they have opened yet. | |
| 15 | 2026-01-06 23:44 | closed | CurlingMan13 ♦52,160 | Looks like they have been open for a while... Should probably be more on top of it if you're going to use notes to track construction progress. Updated businesses | |
| 4645395 Category: unknown | 1 | 2025-02-28 14:51 | opened | Daitruxdd ♦144 | Brookside estates construction |
| 2 | 2025-03-21 23:16 | commented | CurlingMan13 ♦52,160 | Construction area already added... No new info in note. Do you have an estimated completion date? | |
| 3 | 2025-03-22 13:51 | commented | Daitruxdd ♦144 | Non that I could find, however the houses and road look almost finished. I would expect an opening in the coming months | |
| 4 | 2025-03-22 20:28 | commented | CurlingMan13 ♦52,160 | ok, I'll ping the note again to ask for an update in a few months so we can get the note cleared out. Construction already mapped no further action required to resolve original note. | |
| 5 | 2025-05-01 16:39 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 6 | 2025-05-02 00:16 | commented | Daitruxdd ♦144 | Looks almost complete. Should be finished within the coming months | |
| 7 | 2025-05-29 05:59 | commented | CurlingMan13 ♦52,160 | Updated check_date=* to check_date=2025-05-01 based on latest note update. If you have checked it more recently, please advise. | |
| 8 | 2025-09-10 01:14 | commented | CurlingMan13 ♦52,160 | Has it been completed yet? | |
| 9 | 2025-10-07 13:10 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 10 | 2025-10-30 02:02 | closed | CurlingMan13 ♦52,160 | No response received. All information from note is resolved. No further action required. | |
| 4690337 Category: unknown | 1 | 2025-03-31 14:02 | opened | Daitruxdd ♦144 | bridge MT-19 Replacement. closed for the next 6 months |
| 2 | 2025-05-01 16:38 | commented | CurlingMan13 ♦52,160 | Did it just start? So reopening would be September 2025? | |
| 3 | 2025-05-02 00:16 | commented | Daitruxdd ♦144 | Sounds about right | |
| 4 | 2025-05-08 03:10 | commented | CurlingMan13 ♦52,160 | Readded type of road/classification to road that was removed. | |
| 5 | 2025-08-02 22:38 | closed | DawsZed ♦229 | Opened yesterday, removed construction area and tagging. | |
| 4416222 Category: unknown | 1 | 2024-09-02 18:01 | opened | Daitruxdd ♦144 | leaving a note here as a reminder to update area once construction on Middletown Walk Phase 2 is complete |
| 2 | 2025-01-29 02:08 | commented | DawsZed ♦229 | Recently surveyed all existing addresses for this development, added buildings under construction, will return yearly to add as needed | |
| 3 | 2025-02-15 05:23 | commented | CurlingMan13 ♦52,160 | Might need to return more often than yearly if we have it marked with a note and a construction area. | |
| 4 | 2025-02-16 21:12 | commented | DawsZed ♦229 | Fair point, it's just moving so slowly that there's barely any differences month over month... I'll definitely keep an eye out on this place though | |
| 5 | 2025-03-22 20:30 | commented | CurlingMan13 ♦52,160 | I'll keep checking in accordingly. Construction is already mapped. No errors or actions required for note. | |
| 6 | 2025-05-01 16:37 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 7 | 2025-05-02 00:14 | commented | Daitruxdd ♦144 | Will survey when I get the chance | |
| 8 | 2025-09-10 01:14 | commented | CurlingMan13 ♦52,160 | Any update on construction? Just making the rounds to resolve notes when no further action is required. | |
| 9 | 2025-10-27 17:13 | commented | CurlingMan13 ♦52,160 | No response received... Aerial imagery was updated. Please respond on the status of construction or whether map can be updated and note can be closed. | |
| 10 | 2025-11-26 01:24 | closed | CurlingMan13 ♦52,160 | No response received to previous comments on note regarding construction progress. | |
| 4721152 Category: unknown | 1 | 2025-04-21 18:44 | opened | Daitruxdd ♦144 | new housing development under construction |
| 2 | 2025-05-01 16:31 | commented | CurlingMan13 ♦52,160 | Do you know the name? Website? Estimated completion date? | |
| 3 | 2025-05-02 00:09 | commented | Daitruxdd ♦144 | Couldn’t find much information about it | |
| 4 | 2025-07-17 02:58 | closed | Thereal0000000000 | ||
| 4421541 Category: unknown | 1 | 2024-09-05 17:07 | opened | Daitruxdd ♦144 | leaving a note as a reminder to update area once new bridge is built. |
| 2 | 2024-10-08 19:39 | closed | Agadez k | ||
| 3 | 2024-10-08 19:39 | reopened | Agadez k | ||
| 4 | 2025-01-23 11:52 | commented | DawsZed ♦229 | Current schedule for USCG boat clearance advisories ends in May 2025, I anticipate the new bridge might open around that time (https://www.rumsonseabrightbridge.com/wp-content/uploads/2024/11/S32-CSS-PublicNoticeChannelClosures-update110824rev.pdf). | |
| 5 | 2025-02-03 21:39 | commented | CurlingMan13 ♦52,160 | updated bridge supports here where visible. | |
| 6 | 2025-02-03 21:49 | commented | CurlingMan13 ♦52,160 | added date (2025-05) to expected completion date tags for roadway and construction area. This serves as a good reminder when using filters to check if construction is complete and is easier to filter/search than notes. | |
| 7 | 2025-05-01 16:30 | commented | CurlingMan13 ♦52,160 | Any update on construction progress? | |
| 8 | 2025-05-02 00:09 | commented | Daitruxdd ♦144 | Bridge looks almost complete. I’d expect to to be open in the coming months | |
| 9 | 2025-05-09 14:13 | commented | DawsZed ♦229 | Here's hoping it will, the project site has USGS closings out until the end of this month now; full project completion (including demolition, opening of new span might be sooner) by Spring 2026. | |
| 10 | 2025-05-29 05:41 | commented | CurlingMan13 ♦52,160 | Seems both spans are open. Please update accordingly. https://www.rumsonseabrightbridge.com/channel-and-bridge-opening-information-as-of-tuesday-may-27-2025/ | |
| 11 | 2025-05-29 15:49 | commented | DawsZed ♦229 | The channel opening notices are about how they open different spans (left, right, both) of the old and new bridge during construction to allow different heights of boat traffic underneath the spans. From survey today, the new bridge is indeed operable now, paved both ends with traffic lights installed on Ocean Avenue, but it's still closed for construction. | |
| 12 | 2025-05-29 16:06 | commented | DawsZed ♦229 | https://pixvid.org/images/2025/05/29/PXL_20250529_143250286.jpg | |
| 13 | 2025-07-04 07:27 | commented | CurlingMan13 ♦52,160 | Any update on whether they switched traffic over to cross new brodge or not yet? | |
| 14 | 2025-08-02 16:28 | closed | DawsZed ♦229 | The new bridge is now open to vehicles and pedestrians (https://www.rumsonseabrightbridge.com/new-bridge-open-to-vehicles-and-pedestrians/). Moved over the roadways to keep history. | |
| 15 | 2025-08-04 05:28 | reopened | CurlingMan13 ♦52,160 | Is the other span being removed or just reconstructed such that there will be two bridges? If being removed, construction isn't really the best lifecycle tag. Recommend lifecycle prefix "disused:" or "abandoned:" or "demolished:" | |
| 16 | 2025-08-04 06:07 | commented | DawsZed ♦229 | Good catch with the tagging, the other bridge is indeed being demolished within the next year. I'll update the tagging. Otherwise I think we're alright to close this? | |
| 17 | 2025-08-04 18:10 | closed | DawsZed ♦229 | ||
| 4683826 Category: unknown | 1 | 2025-03-26 20:51 | opened | --- | New warehouse construction |
| 2 | 2025-03-26 20:52 | commented | Daitruxdd ♦144 | Added preliminary building and road layout. Construction looks almost complete. Should be open within the next few months | |
| 3 | 2025-05-01 05:13 | closed | Daitruxdd ♦144 | construction complete | |
| 4736291 Category: unknown | 1 | 2025-05-01 05:08 | opened | Daitruxdd ♦144 | South Amboy Ferry Project under construction |
| 2 | 2025-10-15 03:14 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 4726261 Category: unknown | 1 | 2025-04-24 18:39 | opened | --- | Name: Old Brook Road |
| 2 | 2025-04-24 20:32 | closed | Daitruxdd ♦144 | added road name | |
| 4726360 Category: unknown | 1 | 2025-04-24 20:01 | opened | --- | yiyrsdf |
| 2 | 2025-04-24 20:19 | closed | Daitruxdd ♦144 | Spam; closing note | |
| 4520178 Category: unknown | 1 | 2024-11-15 01:41 | opened | Daitruxdd ♦144 | Vermella Bellville Construction. |
| 2 | 2025-04-06 04:54 | commented | CurlingMan13 ♦52,160 | What is supposed to be? Residential? Commercial? Warehouse? Last checked date? Estimated date of completion? Trying to determine what information still needs to be added since all info from note was added to the map. | |
| 3 | 2025-04-06 04:56 | commented | CurlingMan13 ♦52,160 | Building outline added form NAIP imagery... Is construction complete? | |
| 4 | 2025-04-06 22:34 | commented | Daitruxdd ♦144 | it is a luxury apartment complex. the Vermella website still lists it as coming soon but other websites say it is available. survey is needed. also the name has changes to Rev by Vermella | |
| 5 | 2025-07-04 09:11 | commented | CurlingMan13 ♦52,160 | If you have the websites, you should add it to the map area since it could be useful further on and not everyone looks at notes. | |
| 6 | 2025-10-30 04:29 | commented | CurlingMan13 ♦52,160 | What websites are you referring to? | |
| 7 | 2025-10-30 13:23 | commented | Garren19607 ♦12 | This would be the website I assume https://revbyvermella.com/ The building seems to be open, however its unique shape will make it difficult to trace without updated aerial imagery imo. | |
| 8 | 2025-12-22 14:08 | closed | Garren19607 ♦12 | Mapbox Satellite has updated aerials showing the new apartment building (REV by Vermella) so I added the building. | |
| 4584635 Category: unknown | 1 | 2025-01-11 05:31 | opened | Daitruxdd ♦144 | Tonnelle Avenue Bridge and utility relocation project |
| 2 | 2025-04-06 02:51 | commented | CurlingMan13 ♦52,160 | What is the scope of this project? What needs to be done on the map? Looks like this area was already mapped as a construction zone, so I am trying to figure out what issue needs to be addressed to resolve the note... | |
| 3 | 2025-04-06 20:28 | commented | Daitruxdd ♦144 | information on the project can be found here https://www.gatewayprogram.org/tonnelle-avenue-bridge-utility-relocation-project.html | |
| 4 | 2025-04-22 00:38 | commented | DawsZed ♦229 | Me and others have already added and have been editing this construction site for the past 2 years. Are there any specific errors or omissions with this location? | |
| 5 | 2025-05-29 06:07 | commented | CurlingMan13 ♦52,160 | That's exactly what I am trying to figure out. What information is the note providing? All the information is already present in the respective construction areas. | |
| 6 | 2025-10-30 03:24 | commented | CurlingMan13 ♦52,160 | Any update that still needs to be added? All information from note incorporated, so I don't see why we're keeping this note open. Source was already added to the construction area. | |
| 7 | 2025-10-30 04:40 | closed | DawsZed ♦229 | No need for this note anymore per CurlingMan, nothing left to do now. I have good faith in our rail editors to watch and update this decade-spanning project in due time. | |
| 4609427 Category: unknown | 1 | 2025-01-31 19:57 | opened | Daitruxdd ♦144 | it seems this area has went though some changes recently that need to be updated once new areal imagery is available |
| 2 | 2025-04-06 02:46 | commented | CurlingMan13 ♦52,160 | What do you mean there has been changes? New buildings? Were things demolished? How would I know if imagery has been updated? | |
| 3 | 2025-04-06 20:21 | commented | Daitruxdd ♦144 | based on street view photos, the parking has been modified and bus stop has moved. | |
| 4 | 2025-11-14 01:40 | closed | CurlingMan13 ♦52,160 | Looks like everything matches the latest aerial imagery. New solar canopies and a moved bus stop. | |
| 4685064 Category: unknown | 1 | 2025-03-27 19:46 | opened | Daitruxdd ♦144 | Glassworks construction |
| 2 | 2025-03-27 20:32 | commented | CurlingMan13 ♦52,160 | Residential community? Commercial? Industrial? What is the estimated completion date? And when was it last checked? | |
| 3 | 2025-04-05 06:16 | commented | CurlingMan13 ♦52,160 | Is only this new area Glassworks? Or is it the name for everything including everything already built? Also - more importantly - all the apartment buildings were tagged incorrectly as complexs. | |
| 4 | 2025-04-05 06:18 | commented | CurlingMan13 ♦52,160 | Also, is the name of the place "glassworks" or "Glassworks" ? Your note says it is "Glassworks" but you added it as a construction area with "glassworks" Which should it be? | |
| 5 | 2025-04-05 15:20 | commented | Daitruxdd ♦144 | Glassworks. The existing residential areas are also part of Glassworks. I belive the area under construction is retail | |
| 6 | 2025-05-08 03:12 | commented | CurlingMan13 ♦52,160 | capitalized "Glassworks" in name=* tag | |
| 7 | 2025-07-17 02:59 | closed | Thereal0000000000 | ||
| 4548462 Category: unknown | 1 | 2024-12-09 22:09 | opened | Daitruxdd ♦144 | 65 First Ave Construction |
| 2 | 2024-12-19 05:47 | commented | Daitruxdd ♦144 | the first homes are scheduled to be finished in 2025 | |
| 3 | 2025-03-22 20:30 | commented | CurlingMan13 ♦52,160 | When in 2025? Any update? | |
| 4 | 2025-04-03 04:46 | commented | Daitruxdd ♦144 | not sure when it will be completed. added building outline based on survey | |
| 5 | 2025-08-26 04:52 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 6 | 2025-09-26 05:39 | commented | CurlingMan13 ♦52,160 | Any update on construction? Following up on open and unresolved note. | |
| 7 | 2025-10-15 02:59 | closed | CurlingMan13 ♦52,160 | Construction area already mapped. All details from note added to map, and no response received regarding question on construction update. | |
| 4481899 Category: unknown | 1 | 2024-10-16 23:39 | opened | Daitruxdd ♦144 | Brightview Holmdel; senior independent and assisted living is being built here. |
| 2 | 2024-10-17 17:28 | commented | DawsZed ♦229 | Added info and rough outline of building foundation seen in NAIP imagery; any idea when this might be finished? | |
| 3 | 2025-01-01 02:15 | commented | CurlingMan13 ♦52,160 | Is it finished yet? | |
| 4 | 2025-01-01 16:00 | commented | DawsZed ♦229 | The building looks finished and the service roads and outside welcome center are open to the public now, but its definitely not occupied yet, theres still plenty construction vehicles there | |
| 5 | 2025-02-16 22:57 | commented | DawsZed ♦229 | Website says the building will open in Spring 2025, without listing a specific date (https://www.brightviewseniorliving.com/find-a-community/brightview-holmdel) | |
| 6 | 2025-03-09 22:32 | commented | CurlingMan13 ♦52,160 | Added phone number to building from website. Once construction is finished, feel free to nuke the construction area once complete, even if it isn't opened right away, | |
| 7 | 2025-03-31 14:10 | closed | Daitruxdd ♦144 | surveyed today. did not see any sings on ongoing construction. Removed construction site and updated building to compete. | |
| 4599509 Category: unknown | 1 | 2025-01-24 00:04 | opened | --- | "Multipurpose Community Venue" Looks like it will be located right here https://online.flippingbook.com/view/482650546/2/ |
| 2 | 2025-01-29 02:55 | commented | DawsZed ♦229 | Added construction area since groundbreaking has started on this area (https://www.middlesexcountynj.gov/Home/Components/News/News/1598/148) | |
| 3 | 2025-02-15 05:34 | commented | CurlingMan13 ♦52,160 | Were the buildings demolished? If so, they should be tagged as demolished or removed. | |
| 4 | 2025-03-21 23:18 | commented | CurlingMan13 ♦52,160 | Any update on if building is still standing? Or since construction area was tagged, should note be marked as resolved since all info is already incorporated? We don't use notes as personal bookmarks and close it when there is no further info to add. | |
| 5 | 2025-03-22 00:05 | commented | DawsZed ♦229 | I'm not usually around this area, but I can drive out this weekend and survey the different buildings on campus. After that, yeah, the issue is resolved and no further to add for now. | |
| 6 | 2025-03-22 23:04 | closed | DawsZed ♦229 | Buildings not demolished from survey (at least, not yet). Update construction area to resolve note. | |
| 7 | 2025-03-27 19:42 | reopened | Daitruxdd ♦144 | ||
| 8 | 2025-05-08 03:15 | commented | CurlingMan13 ♦52,160 | Has building been demolished yet? | |
| 9 | 2025-07-04 07:20 | commented | CurlingMan13 ♦52,160 | It looks like the building was demolished but no update or response was provided to my question on this note... | |
| 10 | 2025-08-10 13:35 | commented | DawsZed ♦229 | Added new buildings seen under construction in survey this morning. Demolished buildings, roads, and updated construction boundaries. | |
| 11 | 2025-10-30 01:58 | commented | CurlingMan13 ♦52,160 | Is construction complete? | |
| 4471672 Category: unknown | 1 | 2024-10-09 14:43 | opened | --- | RWJ/Barnabas Health Site |
| 2 | 2024-10-21 15:55 | commented | DawsZed ♦229 | The RWJ Barnabas Health website does not list any clinics at the location of this note. However, the website for this plaza (https://connect.regencycenters.com/glenwood-green) lists an "on-site ambulatory care center, operated by Rendina Healthcare" | |
| 3 | 2024-11-28 16:19 | commented | Daitruxdd ♦144 | I believe the site is under construction. that's probably why it is not appearing on the website yet | |
| 4 | 2024-12-30 03:46 | commented | Daitruxdd ♦144 | marked construction site. | |
| 5 | 2025-01-01 15:43 | commented | DawsZed ♦229 | Yeah fair point, I was here a few days ago, and I see signs for RWJ Barnabas; the building and parking lot looks done but it's still fenced off, I guess it's interior work now | |
| 6 | 2025-03-22 20:33 | commented | CurlingMan13 ♦52,160 | Has the construction area been correctly added? Is construction on the outside complete? Is parking lot road construction complete? What other details are missing? | |
| 7 | 2025-03-23 00:40 | commented | Daitruxdd ♦144 | Not sure will survey when I get the chance | |
| 8 | 2025-03-23 02:33 | commented | DawsZed ♦229 | From my survey three months ago, the exterior was finished, and the parking aisles were complete. I'll tag the building as a generic structure, and the finished roads with access=no for now. | |
| 9 | 2025-03-27 20:35 | commented | CurlingMan13 ♦52,160 | Access=no should only be used if there are barriers preventing access. If anyone can drive in there, access=no is the wrong tag. | |
| 10 | 2025-03-29 23:01 | commented | DawsZed ♦229 | My bad, you're right, it's not entombed inside fencing for construction vehicles. Sorry for the trouble, fixed the access tags. | |
| 11 | 2025-05-08 03:14 | commented | CurlingMan13 ♦52,160 | Any update on tags? Just checking in to try to address notes where possible. | |
| 12 | 2025-05-29 05:36 | commented | CurlingMan13 ♦52,160 | Has construction been completed and fencing taken down? | |
| 13 | 2025-06-18 01:33 | closed | DawsZed ♦229 | Surveyed tonight, construction is done, fencing is down. Updated this and surrounding amenities. | |
| 4544672 Category: unknown | 1 | 2024-12-06 01:18 | opened | Daitruxdd ♦144 | Brant Point |
| 2 | 2024-12-07 02:11 | commented | Hypsometric ♦4,081 | It is already on the map. Is construction complete? | |
| 3 | 2025-01-03 16:51 | commented | DawsZed ♦229 | Surveyed today, the site is fenced off with construction vehicles on site, some luxury homes visible on the lot | |
| 4 | 2025-03-22 20:31 | commented | CurlingMan13 ♦52,160 | Any update? Is construction complete? What other info from note can be added? What specific actions need to be taken before note can be closed? | |
| 5 | 2025-03-23 00:39 | commented | Daitruxdd ♦144 | New homes are still being built | |
| 6 | 2025-09-10 01:14 | commented | CurlingMan13 ♦52,160 | Any update? | |
| 7 | 2025-10-15 03:01 | commented | CurlingMan13 ♦52,160 | Any update on construction or any use in keeping note open? All details from note already incorporated. At this point, it looks like it is being used as a personal bookmark rather than a note, which is not the intent of notes. | |
| 8 | 2025-10-15 10:44 | closed | Hypsometric ♦4,081 | Good point. Construction is on the map. No need for the note. | |
| 4667086 Category: unknown | 1 | 2025-03-16 13:22 | opened | Daitruxdd ♦144 | Colts Neck Manor construction |
| 2 | 2025-03-21 23:15 | commented | CurlingMan13 ♦52,160 | Construction area already added with relevant details already entered. Name in note differs from construction area. Please verify what the correct name is. Is it "Livana Colts Neck" as mapped or is it "Colts Neck Manor" as noted? Are you implying name is wrong on map and needs to be corrected as per your note? | |
| 3 | 2025-03-22 13:50 | commented | Daitruxdd ♦144 | The current name of the project is “Livana Colts Neck”. “Colts Neck Manor” is the old name | |
| 4 | 2025-03-22 20:24 | commented | CurlingMan13 ♦52,160 | Added was:name=Colts Neck Manor All notes in action complete... No other information in note and no further information needs to be added. All actions regarding note are complete. | |
| 5 | 2025-09-09 04:05 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 6 | 2025-10-15 02:58 | commented | CurlingMan13 ♦52,160 | Any update on construction? Or should note be closed due to no new info in note and no response? | |
| 7 | 2025-10-27 17:08 | closed | CurlingMan13 ♦52,160 | No response received. Updated imagery available and mapped already. | |
| 4650191 Category: unknown | 1 | 2025-03-03 18:53 | opened | Daitruxdd ♦144 | NJ-66 widening and New roundabout under construction |
| 2 | 2025-03-21 23:14 | commented | CurlingMan13 ♦52,160 | Do you have an expected completion date? | |
| 3 | 2025-03-22 13:48 | commented | Daitruxdd ♦144 | Some time in 2026 | |
| 4 | 2025-03-22 20:25 | commented | CurlingMan13 ♦52,160 | added opening_date=2026. All information from note already incorporated into map... | |
| 5 | 2025-05-21 02:44 | commented | CurlingMan13 ♦52,160 | added oneway=yes added construction=* ...with * being road type. | |
| 6 | 2025-06-24 04:11 | commented | CurlingMan13 ♦52,160 | Still under construction. | |
| 7 | 2025-07-17 02:58 | closed | Thereal0000000000 | ||
| 4584630 Category: unknown | 1 | 2025-01-11 05:18 | opened | Daitruxdd ♦144 | Raritan River Drawbridge Replacement |
| 2 | 2025-01-20 22:50 | commented | CurlingMan13 ♦52,160 | yup. Construction is mapped. | |
| 3 | 2025-02-03 21:32 | commented | CurlingMan13 ♦52,160 | Bridge supports added | |
| 4 | 2025-02-03 21:37 | commented | CurlingMan13 ♦52,160 | added buildings and minor power lines on south side of river in construction zone. | |
| 5 | 2025-02-15 05:34 | commented | CurlingMan13 ♦52,160 | Route relations will also need to be updated when bridge is finished. | |
| 6 | 2025-03-09 22:35 | commented | CurlingMan13 ♦52,160 | Added bridge types to construction ways. | |
| 7 | 2025-03-12 19:40 | closed | Albert55 | ||
| 8 | 2025-03-12 21:32 | reopened | Daitruxdd ♦144 | ||
| 9 | 2025-03-12 21:38 | commented | CurlingMan13 ♦52,160 | User Albert55 was reported to DWG for closing notes and taking no action. Suspect vandalism. | |
| 10 | 2025-04-12 06:21 | commented | DawsZed ♦229 | Estimated completion (including demolition of the old bridge span) is Summer 2029, 4 years from now at best speed: https://www.nasdaq.com/articles/skanska-wins-421-mln-worth-raritan-river-bridge-replacement-contract-new-jersey | |
| 11 | 2025-10-30 04:05 | commented | CurlingMan13 ♦52,160 | Providing intimate, play-by-play update as requested via note. Removed following tag as construction has since started: proposed:bridge=yes | |
| 4659387 Category: unknown | 1 | 2025-03-10 14:40 | opened | Daitruxdd ♦144 | Maplewood library construction. Scheduled to open fall 2025 |
| 2 | 2025-03-11 01:27 | commented | CurlingMan13 ♦52,160 | updated date format. | |
| 3 | 2025-09-21 03:59 | commented | Max Kravitz ♦1 | Library Completed | |
| 4 | 2025-09-21 04:00 | closed | Max Kravitz ♦1 | ||
| 4653080 Category: unknown | 1 | 2025-03-06 03:23 | opened | Daitruxdd ♦144 | 176 RIVERSIDE MULTIFAMILY DEVELOPMENT |
| 2 | 2025-03-09 22:29 | commented | CurlingMan13 ♦52,160 | Update: Added address to construction area gleaned from descriptive name tag. | |
| 3 | 2025-10-30 02:06 | commented | CurlingMan13 ♦52,160 | Making rounds on open notes. No progress on aerial imagery. | |
| 4 | 2025-11-16 19:49 | commented | CurlingMan13 ♦52,160 | Buildings removed on aerial imagery. no signs of new construction yet. | |
| 4652624 Category: unknown | 1 | 2025-03-05 16:22 | opened | Stay Off My Property | This is a private Driveway. Not a public road or access. Please remove from Map. |
| 2 | 2025-03-05 17:01 | closed | Daitruxdd ♦144 | fixed | |
| 4652641 Category: unknown | 1 | 2025-03-05 16:36 | opened | Stay Off My Property | Private Driveway for 558 West Farms Rd. ONLY- Not public road or access |
| 2 | 2025-03-05 17:01 | closed | Daitruxdd ♦144 | ||
| 3 | 2025-03-05 17:01 | reopened | Daitruxdd ♦144 | fixed | |
| 4 | 2025-03-05 17:01 | closed | Daitruxdd ♦144 | ||
| 4652626 Category: unknown | 1 | 2025-03-05 16:23 | opened | Stay Off My Property | This is also part of the private driveway. Should not be used by delivery drivers |
| 2 | 2025-03-05 17:01 | closed | Daitruxdd ♦144 | fixed | |
| 4652639 Category: unknown | 1 | 2025-03-05 16:36 | opened | Stay Off My Property | Part of private driveway. No drive through |
| 2 | 2025-03-05 17:01 | closed | Daitruxdd ♦144 | fixed | |
| 4652643 Category: unknown | 1 | 2025-03-05 16:37 | opened | Stay Off My Property | This looks to be Devlin Way |
| 2 | 2025-03-05 17:00 | closed | Daitruxdd ♦144 | fixed | |
| 4619289 Category: Onosm.org | 1 | 2025-02-08 13:41 | opened | --- | onosm.org submitted note from a business: Name: Peace of Mind Counseling & Consulting addr:housenumber=63 addr:street=W Main St A-5 addr:city=Freehold addr:postcode=07728 Phone number: 848-300-3933 Website: http://pomcc.org/ Social Network: https://www.facebook.com/profile.php?viewas=100000686899395&id=61563126396262 Opening Hours: Monday 9 am–7 pm Tuesday 9 am–9 pm Wednesday 9 am–9 pm Thursday 9 am–9 pm Friday 9 am–6 pm Saturday 8 am–6 pm Sunday 8 am–6 pm Category: Counseling & Mental Health Description: Welcome to Peace of Mind Counseling & Consulting, where compassionate care meets specialized expertise. Our group of dedicated Mental Health Therapists focuses on guiding individuals through anxiety, depression, and trauma with personalized care. We understand that healing is unique to each person, which is why we offer flexible appointment times and the option of in-person or telehealth sessions. At POMCC, our diverse team of clinicians each brings their own area of specialization, ensuring that you can find a therapist who resonates with your needs and journey. Whether you're seeking support for anxiety management, overcoming depression, or processing trauma, we are here to support you every step of the way. Discover a therapist who understands you at POMCC. Contact us today to begin your path towards healing and well-being. Accepted payment methods: |
| 2 | 2025-03-03 19:01 | closed | Daitruxdd ♦144 | added | |
| 4638950 Category: unknown | 1 | 2025-02-23 17:59 | opened | Daitruxdd ♦144 | the Kingsley Construction |
| 2 | 2025-02-23 18:00 | commented | Daitruxdd ♦144 | survey with road network needed and other featured needed | |
| 3 | 2025-05-11 07:05 | commented | CurlingMan13 ♦52,160 | Providing update to note as requested (due to open note). Expanded construction area and added other details based on site plan located: https://www.tapinto.net/towns/south-plainfield/sections/government/articles/planning-board-to-continue-durham-avenue-development-meeting-in-december | |
| 4 | 2025-05-11 07:10 | commented | CurlingMan13 ♦52,160 | As requested due to open note, I added building outlines and some parking areas observed on latest aerial imagery. | |
| 5 | 2025-09-10 03:08 | commented | CurlingMan13 ♦52,160 | Figuring you want an update... New details were added from latest imagery update. | |
| 6 | 2025-10-15 05:12 | commented | CurlingMan13 ♦52,160 | Guessing you want an update due to still open note (and no details in note)? Not sure since no info in note on why it is still open. No new updates to aerial imagery found. | |
| 7 | 2026-01-06 23:42 | commented | CurlingMan13 ♦52,160 | No newer imagery available since last update in October. | |
| 4624432 Category: unknown | 1 | 2025-02-12 17:57 | opened | Daitruxdd ♦144 | One Globe Court Apartment building construction |
| 2 | 2025-02-15 06:29 | commented | CurlingMan13 ♦52,160 | Buildings demolished yet on the North end and South ends of this construction area? If so, they should be tagged as demolished. | |
| 3 | 2025-02-16 17:45 | commented | Daitruxdd ♦144 | Buildings have been demolished and the new structure can be seen | |
| 4 | 2025-03-08 20:31 | commented | DawsZed ♦229 | As an update, I've added the outline of the building under construction, seen by survey and cross-referenced with online renders | |
| 5 | 2025-08-26 06:52 | commented | CurlingMan13 ♦52,160 | Any update on construction? | |
| 6 | 2025-08-28 13:32 | commented | DawsZed ♦229 | From survey this morning, the wooden exterior structure of the building seems almost complete. Still needs roofing/facade/etc exterior and interior work, so about halfway complete. | |
| 7 | 2025-10-30 03:07 | commented | CurlingMan13 ♦52,160 | Any update on status? | |
| 8 | 2025-11-16 20:51 | commented | CurlingMan13 ♦52,160 | Any update on status? | |
| 9 | 2026-01-14 19:58 | commented | CurlingMan13 ♦52,160 | Any update on progress or status? | |
| 4604874 Category: Onosm.org | 1 | 2025-01-28 09:15 | opened | --- | onosm.org submitted note from a business: Name: Bright Vision Technologies addr:housenumber=991 addr:street=US-22 Suite 200 addr:city=Bridgewater addr:postcode=08807 Phone number: 908-938-4442 Website: https://www.bvteck.com/ Social Network: https://www.facebook.com/people/Bright-Vision-Technologies/61552980130160/ Opening Hours: Monday 8am _ 7pm Tuesday 8am _ 7pm Wednesday 8am _ 7pm Thursday 8am _ 7pm Friday 8am _ 7pm Saturday Closed Sunday Closed Category: Employment Agencies Description: Located in Bridgewater Township, New Jersey, Bright Vision Technologies is your trusted partner for innovative employment and staffing solutions. As a premier employment consultant, we connect top talent with leading businesses across industries, including IT, healthcare, engineering, finance, and manufacturing. Our tailored services range from temporary staffing and permanent placements to contract-to-hire and executive recruitment. We are committed to fostering diversity and inclusion through equitable hiring practices and helping businesses build strong, dynamic teams. With a reputation for excellence, expertise, and personalized service, Bright Vision Technologies is dedicated to driving career success and business growth. Accepted payment methods: |
| 2 | 2025-02-12 20:06 | closed | Daitruxdd ♦144 | added | |
| 4395635 Category: unknown | 1 | 2024-08-21 16:47 | opened | Daitruxdd ♦144 | Can someone provide a status for this new road. I should be open by now but I can’t find any information about it actually being open |
| 2 | 2024-10-18 12:19 | commented | DawsZed ♦229 | This is the Route 1&9T Extension (New Road) under the Lincoln Tunnel Access Project. From what I could find, there are three contracts to this roadway - this segment is Contract 1, which is complete. Found this document that shows its progress: https://www.nj.gov/transportation/capital/stip2433/sec11/pdf/njtpa.pdf Eventually the full extension of the roadway will fly over the Croxton Intermodal Terminal going SW, go under the NJ Transit lines, and join with Westside Avenue. One of the slides in this presentation shows the future alignment: https://0c337598-168f-4f94-ad4c-29cfee3567ca.filesusr.com/ugd/98f1dc_ff7e7c2802564755abf19e5121865cb9.pdf Not sure if NJTPA would open this segment when it's part of a larger roadway? If anyone local here can take a look to confirm, it'd be appreciated. | |
| 3 | 2025-01-11 05:26 | commented | Daitruxdd ♦144 | apparently it won't be open until the other segments are finished | |
| 4 | 2025-01-11 23:04 | commented | DawsZed ♦229 | Yeah, I was here a day or two ago, both ends are blocked off with jersey barriers and closed signs, not even EMS could go down here | |
| 5 | 2025-02-12 18:10 | closed | edang3 ♦1 | ||
| 6 | 2025-02-12 18:22 | reopened | Daitruxdd ♦144 | ||
| 7 | 2025-05-22 13:41 | commented | DawsZed ♦229 | I feel like this can be resolved in favor of adding a new note at the construction east of Hudson Logistics Park (SW of this note) since that's the part under construction right now, up to you. Added the sources I found here into the ways already. | |
| 8 | 2025-07-17 11:16 | commented | dannmer ♦17,831 | Can the construction tags be removed from the roadway? Can the note be resolved? | |
| 9 | 2025-10-30 03:25 | commented | CurlingMan13 ♦52,160 | No response received on previous question... Please respond. Is the road still under construction? | |
| 10 | 2025-10-30 04:25 | closed | DawsZed ♦229 | This segment is paved but part of a larger road under construction that won't be complete for years. Everything's been added otherwise, no use for this note anymore. I'll keep track of this place in the meantime. | |
| 4622378 Category: StreetComplete | 1 | 2025-02-11 06:43 | opened | CurlingMan13 ♦52,160 | No physical seperation/barrier on this offramp. Should only be 1 path. via StreetComplete 60.1 |
| 2 | 2025-02-11 18:22 | closed | Daitruxdd ♦144 | Fixed | |
| 4622379 Category: StreetComplete | 1 | 2025-02-11 06:43 | opened | CurlingMan13 ♦52,160 | No physical seperation. Road should not be divided here. via StreetComplete 60.1 |
| 2 | 2025-02-11 18:22 | closed | Daitruxdd ♦144 | Fixed | |
| 4607788 Category: unknown | 1 | 2025-01-30 14:38 | opened | CurlingMan13 ♦52,160 | Bus route relation needs to be extended all the way to NYC https://www.openstreetmap.org/relation/12099770 https://academybus.com/Uploads/CommuterPDFs/Lakehurst_August_2024.pdf Does it go local or express on GSP? Or does it really matter? |
| 2 | 2025-01-30 14:38 | commented | CurlingMan13 ♦52,160 | All points south are updated and correct. | |
| 3 | 2025-02-11 17:41 | commented | Daitruxdd ♦144 | Ive seen multiple academy busses on the express lanes so I think its safe to assume they use express. | |
| 4 | 2025-02-11 18:29 | commented | CurlingMan13 ♦52,160 | Looking at the other bus routes here, I agree. I will continue running the relation north when I get a chance. | |
| 5 | 2025-03-09 22:38 | closed | CurlingMan13 ♦52,160 | Extended north. | |
| 4544662 Category: unknown | 1 | 2024-12-06 00:20 | opened | Daitruxdd ♦144 | Aberdeen Road bridge replacement and roadway improvements |
| 2 | 2025-01-27 06:48 | commented | CurlingMan13 ♦52,160 | Any update? Bear in mind that any updates made to OSM will take months to get into any navigation units, so even when it is reopened, it may take months to filter back into navigation apps and services that the road is usable once again. | |
| 3 | 2025-01-27 15:36 | commented | Daitruxdd ♦144 | It’s going to be closed till the end of this year | |
| 4 | 2025-08-04 05:30 | commented | CurlingMan13 ♦52,160 | Please review the wiki page for Key:construction. Short-term construction projects should not use highway=construction. This helps with OSM data that is used offline. https://wiki.openstreetmap.org/wiki/Key:construction#:~:text=Don%27t%20use%20construction%3D*%20to%20tag%20such%20short%2Dterm%20closures%2C | |
| 5 | 2025-09-11 15:28 | closed | DawsZed ♦229 | Bridge and roadway reopened per https://www.tnnewsonline.com/blogs/aberdeen-road-bridge-transformed-from-eyesore-to-community-asset; remove temporary access tagging to resolve. |