| Note | # | ⏱️ Last updated | Event | Contributor | Comment |
|---|---|---|---|---|---|
| 5500267 Category: Unknown | 1 | ~ 1 month ago | opened | 宋又文 ♦16 | A new footpath and lift was built here after TGS finished, for S Rd W side. |
| 5500265 Category: Unknown | 1 | ~ 1 month ago | opened | 宋又文 ♦16 | Tram grade separation is finished, this depo branch and stop no longer exists. |
| 5500261 Category: Unknown | 1 | ~ 1 month ago | opened | 宋又文 ♦16 | Tram grade separation is finished. |