OpenStreetMap Note Activities of InfiNorth for the last 12 Months
Overall Activities | 12 Months
Opened: 30 (28%) Commented: 21 (20%) Closed: 56 (52%) Reopened: 0 (0%)
Stats per month
Latest | Limit 250
Latest | Limit 250 | The colored events are made by InfiNorth
Note#⏱️ Last updatedEventContributorComment
5285705
Category: Unknown
1~ 4 months agoopenedInfiNorth
♦149
New signage is conflicting - heading East on Haultain, you first encounter a sign directing you onto Florence as a bike route, and Florence has other signs indicating it as a bike route. However, official wayfinding sign eastbound at Epworth directs cyclists onto Epworth instead. I am seeking clarification from Oak Bay Engineering before removing one as a designated bike route.
2~ 2 months agoclosedInfiNorth
♦149
Both streets appear to be designated as official bike routes according to signage.
5356925
Category: Unknown
1~ 2 months agoopenedInfiNorth
♦149
Boundary of Tribune Bay Park has changed. https://governmentofbc.maps.arcgis.com/apps/instant/basic/index.html?appid=4b3eb47c25ff45fa9f6bff45e3f2a389&center=-124.639173,49.528235&level=14
2~ 2 months agocommentedInfiNorth
♦149
I have made temporary approximate changes in the interim, further changes will need to be made using official data
3~ 2 months agocommentedDENelson83
♦2,520
Looks like no new letters patent have been issued amending this boundary.
4~ 2 months agocommentedInfiNorth
♦149
Odd, the BC Parks official map shows i (as linked). Comox iMap shows no park extension but it may be outdated: https://mapviewer.imaptoo.ca/secure/ iMap BC shows the boundary extension around the campground and to Shields Road, though Shields Road remains outside park boundary. I may inquire with CVRD and BC Parks about this as there seem to be discrepancies. Thanks for checking.
5~ 2 months agocommentedInfiNorth
♦149
From my research, BC Parks purchased the properties in question in 2021: https://www.timescolonist.com/local-news/tribune-bay-campsite-on-hornby-to-expand-include-new-walk-in-sites-8638121 Specific image that shows the parcels acquired: https://www.vmcdn.ca/f/files/victoriatimescolonist/json/2024/04/web1_04222024-tribune-bay-plans.jpg Campground planning has been underway for two years.
6~ 2 months agocommentedInfiNorth
♦149
Terrible clickbait headline notwithstanding, here is an image in DailyHive sourced from BC Parks showing the parcels a bit closer up: https://images-dh-production-baselayer.dailyhive.com/uploads/2025/10/B.C.-park-2-1024x948.jpg Official BC Parks Release: https://news.gov.bc.ca/releases/2026ENV0025-000587 https://helpshapebc.gov.bc.ca/tribune
5305367
Category: Unknown
1~ 3 months agoopenedInfiNorth
♦149
New MUP is almost finished, connecting (annoyingly) to a pedestrian only crossing..
2~ 2 months agoclosedInfiNorth
♦149
Finished
5314896
Category: Unknown
1~ 3 months agoopenedInfiNorth
♦149
District of Oak Bay's designated bike route plan for route 4.4a (central Oak Bay bikeway) is being relocated to Devon Road. This connector is not designated or designed for bikes.
5309368
Category: Organicmaps
1~ 3 months agoopenedShantiDam"Moka House ( Coffee shop ) " OSM snapshot date: 2024-06-13T18:38:33Z POI has no name POI types: building-address #organicmaps ios 2026.05.12-1-ios
2~ 3 months agocommentedInfiNorth
♦149
Added in, thank you!
3~ 3 months agoclosedInfiNorth
♦149
5308191
Category: Unknown
1~ 3 months agoopenedInfiNorth
♦149
Intersection is being redesigned and rebuilt somewhat during the Estevan/Haultain bikeway project. RRFBs have been removed but will be reinstalled. https://www.oakbay.ca/building-infrastructure/active-transportation/henderson-and-haultain-estevan-bikeways/
5308180
Category: Unknown
1~ 3 months agoopenedInfiNorth
♦149
Officially designated Henderson Bikeway RRFBs nearing completion, monitor this area over coming months for completion. https://www.oakbay.ca/building-infrastructure/active-transportation/henderson-and-haultain-estevan-bikeways/
5216237
Category: Unknown
1~ 5 months agoopenedInfiNorth
♦149
Will need resurvey and remap as cycle traffic is being separated from pedestrian traffic for the entire crossing including refuge islands on the east side of intersection.
2~ 5 months agocommentedInfiNorth
♦149
Note - the construction is not yet complete.
3~ 3 months agocommentedInfiNorth
♦149
Completed. MOTT has not installed correct signage and signals are not accessible to cyclists but they claim the construction is done.
4~ 3 months agoclosedInfiNorth
♦149
42979591~ 2 years agoopenedsmithkm
♦285
https://www.saanich.ca/assets/Local~Government/Documents/Engineering/Cycling-%20Network.pdf Shows this as a cycle path
2~ 1 year agocommentedDENelson83
♦2,520
Are you sure it actually goes through this cemetery? Or are you referring to the nearby Douglas Street Connector bike path?
3~ 1 year agocommentedcrassula
♦52
I think their map is indicating this trail, and connecting it back to the Douglas Connector. Will have to bike and check it out, it does look like there is a parallel gravel trail here.
4~ 3 months agoclosedInfiNorth
♦149
Bicycle designation in place. Confirmed that Saanich has designated this as an official bike route despite being parallel to the Douglas connector.
43226381~ 2 years agoopenedsmithkm
♦285
Tagging Bastion Square as one big pedestrian area obscures the presence of many stairs and ramps connecting different parts of the square.
2~ 2 years agocommentedDENelson83
♦2,520
Tell Paul Norman about this and he can update OSM-Carto to fix this. https://www.openstreetmap.org/user/pnorman
3~ 2 years agocommentedsmithkm
♦285
No I didn't mean that the rendering is misrepresenting the data, the data is misrepresenting the reality by tagging it in a way that suggests it's a big flat paved area instead of a complex set of steps and ramps. I need to go back to take some pictures, particularly of the areas obscured by trees in the air photos This note is to remember to do that, or if I take a while to get to it for someone else to do it.
4~ 1 year agocommentedInfiNorth
♦149
I know the space enough to put in data interim which can be corrected later.
5~ 4 months agocommentedDENelson83
♦2,520
Or I can put this data in once the aerial imagery has been updated.
6~ 3 months agocommentedInfiNorth
♦149
The space is currently accurately mapped in terms of alignment with current geometry, the issue is that any routefinding algorithm will not be able to direct pedestrians through the square currently due to lack of paths.
7~ 2 months agoclosedDENelson83
♦2,520
I visited Bastion Square as part of my mapping tour-de-force in Greater Victoria this past weekend, and I have drawn in everything that I was able to observe.
5276455
Category: Unknown
1~ 4 months agoopenedDENelson83
♦2,520
Multiple businesses in this building. Ground survey recommended.
2~ 3 months agocommentedInfiNorth
♦149
Please stop posting such an excessive number of comments for businesses with no details.
3~ 3 months agocommentedFizzie-DWG
♦7,709
In that case, please feel free to survey them.
4~ 3 months agoclosedFizzie-DWG
♦7,709
4684894
Category: unknown
1~ 1 year agoopened---This applies to the central area of UVic in general, but these thicker areas (like where the pin is on now) are also walkable by foot, unlike what Openstreetmap thinks.
2~ 1 year agocommentedsmithkm
♦285
It is tagged as walkable, but some routing engines don't like routing through area geometries.
3~ 1 year agoclosedInfiNorth
♦149
I agree that this is an issue. To many routing systems this is an impassible area.
4~ 1 year agoreopenedInfiNorth
♦149
5~ 5 months agoclosedInfiNorth
♦149
Extensive MUPs and trails have been added at UVIC pedestrian area for routefinding algorithms. Resolving.
5202653
Category: Unknown
1~ 5 months agoopenedInfiNorth
♦149
There is no visible trail here, and where there are fragments of a trail is it covered in deadfall. Recommend removing the last kilometre or so of this trail.
2~ 5 months agocommentedhikr_WillA
♦1
I don't agree. Like many officially-unmaintained trails in the Sooke Hills, it is faint with some deadfall, but it is flagged, and extends farther than the indicated trail.
3~ 5 months agocommentedInfiNorth
♦149
This isn't even faint. For the last kilometre, as mentioned above, there is no trail. I have a lot of experience routefinding, and there is neither a reason for a trail to exist here nor is there any indication a trail exists here. It's not a trail, it's a route.
5199976
Category: Unknown
1~ 5 months agoopenedInfiNorth
♦149
Full marked and RRFB signalized Crossing under construction - Will require survey in next two months along with rest of Cook Street for protected bike lanes.
2~ 4 months agocommentedDENelson83
♦2,520
It has now been roughly two months. Do you want to survey it again?
3~ 3 months agocommentedcrassula
♦52
It is still under construction
5098063
Category: Unknown
1~ 8 months agoopenedsmithkm
♦285
Significant changes to geometry here. Need to survey some GPS traces of the bike paths and sidewalks.
2~ 7 months agocommentedInfiNorth
♦149
Geometry updated. No median present on Jutland anymore as SB lane has become a bikeway.
3~ 5 months agoclosedInfiNorth
♦149
5196733
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
This area needs regular checkups in the coming months as Oak Bay has announced bike lanes along this stretch of Cedar Hill Cross
5187074
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
There are no protected bike lane at this intersection. Removed from map but will need a new survey when construction complete. Survey date: March 1st, 2026
2~ 6 months agocommentedInfiNorth
♦149
Minor correction - Comment should have said "marked cycle crossing." There are no road markings at this time.
3~ 4 months agocommentedcrassula
♦52
There are road markings now. Can't remember well enough to update map
5169422
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
New Perimeter Trail Segment (seen here: https://metrovancouver.org/services/regional-parks/Documents/campbell-valley-regional-park-map.pdf) from 16th to 8th Avenue needs to be mapped as an MUP.
2~ 3 months agoclosedDunbarLoop
♦51
Walked a portion today -- 2026 May 20 -- Yes, it is a fine gravel map. Map updated. Ticket closed unless someone finds a missing section
5168019
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
This bus stop appears to have been eliminated during the bike lane construction.
2~ 6 months agoclosedmaxwellward
♦2,460
Thanks, removed it
5164185
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
One of these bus stops is redundant.
2~ 6 months agoclosedmaxwellward
♦2,460
Removed lesser detailed one, thanks
5164184
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
One of these bus stops is redundant.
2~ 6 months agoclosedmaxwellward
♦2,460
Removed lesser detailed one, thanks
5164180
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
One of these bus stops is redundant.
2~ 6 months agoclosedmaxwellward
♦2,460
Removed lesser detailed one, thanks
5164179
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
One of these bus stops is redundant.
2~ 6 months agoclosedmaxwellward
♦2,460
5164178
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
One of these bus stops is redundant.
2~ 6 months agoclosedmaxwellward
♦2,460
5164177
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
One of these bus stops is redundant.
2~ 6 months agoclosedmaxwellward
♦2,460
4955858
Category: Unknown
1~ 11 months agoopenedcrassula
♦52
New school needs to be added here, plus eventually modifications to old building which is in the process of being demolished.
2~ 6 months agocommentedInfiNorth
♦149
Approximate school building added, no surrounding infrastructure mapped.
3~ 6 days agocommentedmaxwellward
♦2,460
Added some paths and the parking lot based on bluro-vision Esri imagery, but more will need to be done as more imagery comes along.
4778468
Category: unknown
1~ 1 year agoopened---This building was replaced with 'Journal in Jubilee' by Aryze, 6 stories. Nice building
2~ 6 months agoclosedInfiNorth
♦149
Added with address
5163165
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
This path used to have modal filter gates. Survey needed to confirm their absence.
5163164
Category: Unknown
1~ 6 months agoopenedInfiNorth
♦149
Site survey needed for which buildings are completed or under construction along Nigel Avenue
42741211~ 2 years agoopened---This is a construction site, and there are separated sidewalks on Nigel Gate.
2~ 6 months agoclosedInfiNorth
♦149
This has been mapped
5163003
Category: Unknown
1~ 6 months agoopenedPendergirl4This parking lot has had an exit at this end of the lot for several years now. The lot is now entry only off orillia and exit only at both ends. This can be seen on satellite imagery.
2~ 6 months agocommentedPendergirl4There are also several paths missing, which are shown in the Saanich GIS map. https://map.saanich.ca/html5viewer/?viewer=Public
3~ 6 months agoclosedInfiNorth
♦149
parking lots updated, paths between fields and across lots added.
5163001
Category: Unknown
1~ 6 months agoopenedPendergirl4This intersection has recently been changed to a traffic circle (similar to seaton/hampton), and the north side of Regina has had a sidewalk installed through to Tillicum road. There is a link at the bottom of this page to the schematic drawing of what the road now looks like: https://hello.saanich.ca/en/projects/seaton-regina-sidewalk-1
2~ 6 months agocommentedInfiNorth
♦149
Fixed - Regina Ave was also missing name W of Seaton. Sidewalk drawn in approximately. Traffic Circle drawn.
3~ 6 months agoclosedInfiNorth
♦149
4962145
Category: Unknown
1~ 11 months agoopenedInfiNorth
♦149
Other segments of McKenzie's lackluster flexpost bike lanes are not marked as protected.
2~ 6 months agoclosedInfiNorth
♦149
4856589
Category: unknown
1~ 1 year agoopened---The bus stop Majestic at Dougall has moved to Majestic at Hawthorne, and there is a new pedestrian crossing.
2~ 6 months agoclosedInfiNorth
♦149
bus stop relocated, crossing added.
4912172
Category: Organicmaps
1~ 1 year agoopenedRobert ModelewskiThe place has gone or never existed. A user of Organic Maps application has reported that the POI was visible on the map (see snapshot date below), but was not found on the ground. OSM snapshot date: 2025-06-08T00:18:23Z POI has no name POI types: landuse-forest #organicmaps ios
2~ 9 months agocommentedalester
♦465
It isn't clear what needs to be fixed here. The automated text is saying that the forested area doesn't exist, but I'm reasonably certain they haven't logged the entire area east of the dump and around Prospect Lake
3~ 6 months agoclosedInfiNorth
♦149
This area has no false locations.
4865336
Category: StreetComplete
1~ 1 year agoopeneddiscontinuity
♦46
This is a shelter under which there are tables for folks to eat at. There are 4 or 5 tables with 4 seats each. via StreetComplete 61.1
2~ 6 months agoclosedInfiNorth
♦149
Structure changed to picnic shelter
5095573
Category: Unknown
1~ 8 months agoopenedsmithkm
♦285
This segment between the connection to the parking aisle and the intersection with the highway is not built to cycleway standard, it's just a sidewalk made of concrete slabs that has a single sign in one direction designating it as shared. I think highway=footway + bicycle=designated would better represent this than highway=cycleway. The rest, from the connector to the parking lot up to Ravine Way is built as a unsegregated cycleway (wide and smooth asphault).
2~ 7 months agocommentedInfiNorth
♦149
Incorrect. This is legally designated as a multi-use path, and that is evident both from the original project drawings, the finished product (seen two weeks ago in person), and the fact that the crossing of Carey has elephants' feet, which are only used on designated MUPs. Please stop arbitrarily declaring your opinion to be the appropriate way to map things.
3~ 7 months agoclosedInfiNorth
♦149
4~ 7 months agoreopenedsmithkm
♦285
5~ 7 months agocommentedsmithkm
♦285
I've been trying to clarify what the actual correct way to tag this based on the standards outlined in the wiki is. That's WHY I've been using notes rather than just changing things unilaterally. I want to have things consistent. You're the one who keeps cutting off my attempts to do so while declaring your own opinion to be uncontestable fact. I could be wrong, you could be wrong, or the wiki itself could just be so ambiguous that it's not a matter of right and wrong. That's the entire point. I don't care which of us is the one who is right. I care about making sure that what we put in the database is consistent.
6~ 7 months agocommentedInfiNorth
♦149
I have already stated: The official plans state this is an MUP It is contiguous to the MUP network along Carey Road It is adjoined at all intersections by elephants feet, which denote pedestrian and cyclist use - a feature of MUPs. It is legally designated as an MUP. As it is very new, and the CRD Bikemap is outdated, it does not appear in the CRD Bikemap. I do not see how this has any ambiguity. It is an MUP in every way other than paving style - which is not a method of identifying MUP status in Saanich (another example is the MUP outside the Shelbourne St. Church of Christ).
7~ 7 months agoclosedInfiNorth
♦149
Confirmed today. Dual green bubble pedestrian-cycling signage, just as there was when I originally made this edit. It's designated an MUP and it is signed an MUP. This is closed.
4615440
Category: unknown
1~ 1 year agoopened---ELW and ECS are both seeing significant renovation/construction. Might be worth making a change to reflect that.
2~ 7 months agocommentedInfiNorth
♦149
Needs surveying
4974039
Category: Unknown
1~ 11 months agoopenedtechwizard2
♦3
The sidewalk on the north side of Ocean Ave between the path to Fourth Street and just east of the crosswalk by the roundabout is a shared pathway (bicycles designated). There's a curb drop just east of the crosswalk to allow cyclists back onto the road.
2~ 7 months agoclosedInfiNorth
♦149
That's weird and close to pointless but it's in the map now.
5155246
Category: Unknown
1~ 7 months agoopenedInfiNorth
♦149
One of the Eastbound bus stops is gone. Survey needed.
4974036
Category: Unknown
1~ 11 months agoopenedtechwizard2
♦3
The cycleways here look like they connect across the street but there's no crossing, they merge with the standard bike lanes in either direction.
2~ 7 months agoclosedInfiNorth
♦149
this has been corrected for routefinding algorithms, thanks very much mr man
5095599
Category: Unknown
1~ 8 months agoopenedDENelson83
♦2,520
A pedestrian path here connects the northern end of Bruce Gordon Place to Wallace Drive.
2~ 7 months agoclosedInfiNorth
♦149
Added in. Thank you for all your notes around here!
5095590
Category: Unknown
1~ 8 months agoopenedDENelson83
♦2,520
A pedestrian path here connects Blackglama Place to Pastel Crescent.
2~ 7 months agoclosedInfiNorth
♦149
Added in, thank you for noting this!
5086730
Category: Unknown
1~ 8 months agoopenedDENelson83
♦2,520
There is a footpath here liking Kristin Place to Peden Lane. The footpath depicted just north of here does not exist.
2~ 8 months agocommentedDENelson83
♦2,520
*linking, not liking.
3~ 7 months agoclosedInfiNorth
♦149
Thank you for noting, this has been fixed.
5091512
Category: Unknown
1~ 8 months agoopenedDENelson83
♦2,520
There is a pedestrian pathway here.
2~ 7 months agoclosedInfiNorth
♦149
Thank you for noting it is here - very strange it has never been mapped!
4663538
Category: unknown
1~ 1 year agoopenedInfiNorth
♦149
OpenStreetMap Wiki shows that this should be just part of Harbour Road rather than mapped separately, and tagged as followed: cycleway:left=track cycleway:right=no cycleway:left:oneway=no https://wiki.openstreetmap.org/wiki/Key:cycleway:right:oneway This seems to be a consistent problem throughout the entire CRD.
2~ 1 year agocommentedsmithkm
♦285
I've added cycleway:right=separate to Harbour Road.
3~ 1 year agocommented@eldang
♦21
I advocate for keeping the bike way separate because it's the beginning of a long regional trail, of which only a short segment is shared with Harbour Road. To merge this segment with the road would be less consistent with how locals describe it.
4~ 9 months agocommentedalester
♦465
Mapping a cycleway track as a separate way is an accepted way of doing things: https://wiki.openstreetmap.org/wiki/Tag:cycleway%3Dtrack#Alternatives_to_mapping_using_cycleway=track ...and I would argue it's more consistent with other highway tagging, where a road can be split into a dual carriageway due to a physical barrier between the directions. The one change I would suggest to the current tagging is to add cycleway=sidepath to the Goose way, to indicate that it's acting in the role of "cycleway=separate" to Harbour Road. https://wiki.openstreetmap.org/wiki/Tag:cycleway%3Dsidepath
5~ 7 months agocommentedInfiNorth
♦149
I would argue against this as, by separating the infrastructure, routing algorithms won't know to tell people to follow Harbour Road, they will instead be following an unnamed random path that the algorithm has no idea is on the pavement shared by the road with only a narrow concrete median separating it.
6~ 5 months agoclosedQuigleyJones
♦3,234
4930332
Category: Unknown
1~ 1 year agoopenedcrassula
♦52
Grange Road is undergoing significant active transportation upgrades. Marking to remind myself (or anyone else) to visit then add to OSM https://hello.saanich.ca/en/projects/grange-road-upgrades-1
2~ 7 months agoclosedInfiNorth
♦149
Grange Road S. of Burnside now has a two-way MUP connected to Goose. North of Burnside now has a sidewalk but no other modifications.
42979071~ 2 years agoopenedsmithkm
♦285
https://www.saanich.ca/assets/Local~Government/Documents/Engineering/Cycling-%20Network.pdf shows viewmont and Mapleton as shared bikeways.
2~ 1 year agocommentedInfiNorth
♦149
Also on CRD Map. No sharrows or any infrastructure in place.
3~ 7 months agoclosedInfiNorth
♦149
5065691
Category: Unknown
1~ 9 months agoopenedsmithkm
♦285
Seaton street here is marked as a cycle route, and the pedestrian underpass as a designated bike path. I don't remember and signs designating any of this for bicycles. Need to ground truth. The underpass is clearly designed for pedestrians only. It may be technically allowed for bikes in the basis of not technically being a sidewalk.
2~ 7 months agoclosedInfiNorth
♦149
Very clearly laid out explicitly in the official CRD bikemap. https://maps.crd.bc.ca/Html5Viewer/?viewer=BikeMap
3~ 7 months agoreopenedsmithkm
♦285
4~ 7 months agocommentedsmithkm
♦285
There have to be clear on site indications like markings or signs to count as "designated". At best I'd consider that highway=footpath bicycle=yes. As for Seaton Street, simply marking it orange on that map doesn't seem to count for anything. I already question trying to mark the randomly distributed "bike connector" signs using route relations but an aspirational bit of orange on a map with
5~ 7 months agoclosedsmithkm
♦285
6~ 7 months agoreopenedsmithkm
♦285
7~ 7 months agoclosedInfiNorth
♦149
It's officially designated on the regional government map, and is a bike route as per painted sharrows on the road along its entire length from the MUP across the playing fields to the tunnel. This includes on the recently rebuilt intersection at Regina Ave, showing that it is not a legacy feature that has been abandoned. This is both officially mapped as a bike route AND marked in real life as a bike route (and is used heavily by cyclists, to boot). StreetView: https://www.google.ca/maps/@48.4558843,-123.387306,3a,48.9y,205.65h,80.17t/data=!3m7!1e1!3m5!1sqYI7y88aZBJJwL16HE9aHA!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fcb_client%3Dmaps_sv.tactile%26w%3D900%26h%3D600%26pitch%3D9.834117373350864%26panoid%3DqYI7y88aZBJJwL16HE9aHA%26yaw%3D205.65105637713535!7i16384!8i8192!5m1!1e2?entry=ttu&g_ep=EgoyMDI2MDExMy4wIKXMDSoASAFQAw%3D%3D I also biked through there two days ago and can confirm this is a bike route as per pavement markings present in 2026. I am resolving this again. Please do not reactivate it.
5113973
Category: Unknown
1~ 8 months agoopenedInfiNorth
♦149
Geometry of dedicated bike tracks (PBLs) needs surveying. MUPs on either side of road are currently mapped, need confirmation of where PBLs start and stop around here, especially with bus stops.
4957770
Category: Unknown
1~ 11 months agoopened---This block has been changed. The road has been reopened and there is a protected bike path and separated, sidewalk grade path, on the east and west sides respectively. Can be tagged the same as the adjacent parts of Vancouver. See note above for changes to Pandora intersection.
2~ 8 months agoclosedInfiNorth
♦149
4957772
Category: Unknown
1~ 11 months agoopened---Road changes. The road has been filled with a median leaving a cycle path and sidewalk on each side. Cars coming eastbound on the Pandora access street have to turn right onto Vancouver, cars coming north on Vancouver have to turn right onto the access street.
2~ 8 months agoclosedInfiNorth
♦149
5041182
Category: Unknown
1~ 10 months agoopened---Should be a path from here straight across to the right
2~ 9 months agocommentedDENelson83
♦2,520
Use a cardinal direction. North or south.
3~ 8 months agoclosedInfiNorth
♦149
5090508
Category: Unknown
1~ 8 months agoopenedInfiNorth
♦149
Needs some ongoing surveys for the protected bike lane projects.
2~ 4 months agoclosedcrassula
♦52
Looks up to date now, project is finished
4663548
Category: unknown
1~ 1 year agoopenedInfiNorth
♦149
Do flexposts conform to OSM's definition of cycletrack?
2~ 1 year agocommentedsmithkm
♦285
Yes, see https://wiki.openstreetmap.org/wiki/Key:cycleway#Buffered_and_protected_bicycle_ways
3~ 1 year agocommentedInfiNorth
♦149
This does not specify flextposts. Is specifically says that unprotected buffer is a standard cycleway=lane, with a buffer. There are no bollards here (flexposts are not bollards). There is literally no protection for cyclists at this point, no physical barrier to being run over by drivers.
4~ 9 months agocommentedsmithkm
♦285
This seems like something that needs to be sorted out on the wiki rather than here on a local note. The important thing is to ensure it's consistent across OSM.
5~ 9 months agocommentedInfiNorth
♦149
No idea how to do that. Not an active user - happy to take it somewhere that would actually have active discussion. This is also a localized issue, as our local government claimed flexposts 40 feet apart are "protection" but I'm willing to bet most people would find that ridiculous.
6~ 4 months agocommentedcrassula
♦52
We should probably indicate flexposts as cycleway=lane with the cycleway:buffer=* as discussed here: https://wiki.openstreetmap.org/wiki/Tag:cycleway%3Dlane
4986167
Category: Unknown
1~ 11 months agoopened---A ton of roadwork here needs to be surveyed in the next few months as projects wrap up (bike lanes).
2~ 10 months agocommentedInfiNorth
♦149
Some updates are complete. Construction still ongoing.
3~ 2 months agocommentedDENelson83
♦2,520
It has now been nine months. Does anyone want to survey the new cycling infrastructure here?
4836754
Category: unknown
1~ 1 year agoopened---This is not a cycleway. A sign westbound (down to Goose) says cyclists must dismount. Didn't see a corresponding sign eastbound. (Up to Gorge Road)
2~ 1 year agocommentedcrassula
♦52
It's unclear, there is no sign saying to dismount going the direction up to Gorge Road. Apparently this path is slated for a regrade soon.
3~ 1 year agocommentedsmithkm
♦285
Ah, that makes sense given the new bike infrastructure on Gorge. Do you have a public source for that? I'd like to know more. Given that it's signed in one direction, and this path really isn't well suited to bicycles because of the combined steepness, narrowness, and poor visibility. I think it's safe to assume it's meant to apply both ways. Tagging it as a footpath with bicycle=dismount until it gets upgraded seems appropriate to me.
4~ 10 months agoclosedInfiNorth
♦149
This trail has been demolished and is under reconstruction.
5033131
Category: Unknown
1~ 10 months agoopenedInfiNorth
♦149
Need confirmation of turn restrictions at this intersection - can general traffic turn Right from Ravine onto South Carey?
2~ 10 months agoclosedInfiNorth
♦149
5012498
Category: Unknown
1~ 10 months agoopened---I believe the bike lanes on Carey are now removed with the MUP opened to the public, but this needs confirmation.
2~ 10 months agoclosedInfiNorth
♦149
bike lanes removed
5022996
Category: Unknown
1~ 10 months agoopenedInfiNorth
♦149
User CheeseSplatter (https://www.openstreetmap.org/user/CheeseSplatter) has vandalized the map here, adding redundant clutter and outright deleting a segment of Shelbourne Street and all its relations. Assistance in reverting this vandalism would be appreciated from the community.
2~ 10 months agoclosedInfiNorth
♦149
Vandalism has been corrected.
4787626
Category: unknown
1~ 1 year agoopenedInfiNorth
♦149
There was a bridge here. Is it still in place? Survey needed
2~ 10 months agoclosedInfiNorth
♦149
4914732
Category: EveryDoor
1~ 1 year agoopeneddiscontinuity
♦46
uptown blvd is pedestrian only from this intersection north - probably up to the next crossing. #EveryDoor
2~ 1 year agocommenteddiscontinuity
♦46
ah and similarly all the parking is gone. there are picnic tables and lounge chair seating
3~ 10 months agoclosedInfiNorth
♦149
This has been fixed.
4433631
Category: unknown
1~ 1 year agoopened---Barkerville Library and Archives
2~ 11 months agoclosedInfiNorth
♦149
Done
4433630
Category: unknown
1~ 1 year agoopened---Eldorado Gold Panning and Souvenirs
2~ 11 months agoclosedInfiNorth
♦149
Done
4433629
Category: unknown
1~ 1 year agoopened---Wesleyan Methodist Church
2~ 11 months agoclosedInfiNorth
♦149
Done
4433628
Category: unknown
1~ 1 year agoopened---F.J. McMahon's Confectionery
2~ 11 months agoclosedInfiNorth
♦149
Done
4433627
Category: unknown
1~ 1 year agoopened---King Guest House
2~ 11 months agoclosedInfiNorth
♦149
Done
4433625
Category: unknown
1~ 1 year agoopened---Wake Up Jake Restaurant
2~ 11 months agoclosedInfiNorth
♦149
Done
4433626
Category: unknown
1~ 1 year agoopened---Goldfield Bakery
2~ 11 months agoclosedInfiNorth
♦149
Done
4433622
Category: unknown
1~ 1 year agoopened---St. George Hotel
2~ 11 months agoclosedInfiNorth
♦149
Done
4433621
Category: unknown
1~ 1 year agoopened---Louis A. Blanc Photographic Gallery
2~ 11 months agoclosedInfiNorth
♦149
Done
4433623
Category: unknown
1~ 1 year agoopened---Cariboo Masonic Lodge #4
2~ 11 months agoclosedInfiNorth
♦149
Done
4433620
Category: unknown
1~ 1 year agoopened---House Hotel Coffee Saloon
2~ 11 months agoclosedInfiNorth
♦149
Done
4433618
Category: unknown
1~ 1 year agoopened---A. McPherson Watchmaker & Jeweller
2~ 11 months agoclosedInfiNorth
♦149
Added
4433617
Category: unknown
1~ 1 year agoopened---Mason & Daly General Merchants
2~ 11 months agoclosedInfiNorth
♦149
Added
4433616
Category: unknown
1~ 1 year agoopened---C. Strouss & Co.
2~ 11 months agoclosedInfiNorth
♦149
Added
4433615
Category: unknown
1~ 1 year agoopened---Canada Post
2~ 11 months agoclosedInfiNorth
♦149
Named and Added
4433614
Category: unknown
1~ 1 year agoopened---Theatre Royal
2~ 11 months agoclosedInfiNorth
♦149
Named
4433612
Category: unknown
1~ 1 year agoopened---Main Street
2~ 11 months agoclosedInfiNorth
♦149
Named
4433609
Category: unknown
1~ 1 year agoopened---Halverson House Mining Museum
2~ 11 months agoclosedInfiNorth
♦149
Added
4433611
Category: unknown
1~ 1 year agoopened---Lee Chong Co. Store, Chinese Museum
2~ 11 months agoclosedInfiNorth
♦149
Added
4433610
Category: unknown
1~ 1 year agoopened---Kwong Sang Wing Gift Shop
2~ 11 months agoclosedInfiNorth
♦149
Added
4973806
Category: Unknown
1~ 11 months agoopenedInfiNorth
♦149
Banff is no longer car free. Will update but may need some further edits.
2~ 7 months agoclosedQuigleyJones
♦3,234
4973734
Category: Unknown
1~ 11 months agoopenedInfiNorth
♦149
Bow valley parkway is seasonally converted into a bike route. Should this be seasonally edited to be turned into a multi-use trail? https://parks.canada.ca/pn-np/ab/banff/info/gestion-management/cyclisme-cycling
4949260
Category: Unknown
1~ 1 year agoopenedDarinJThe Coquihalla Highway is currently open. The Mine Creek Fire is still active, so further closures may be needed, but at this time (05:39 PST) the highway is open.
2~ 11 months agocommentedInfiNorth
♦149
Temporary closures aren't supposed to be marked in OSM. Long-Term construction changes can be shown, but closures lasting a few days or even a week shouldn't be marked.
3~ 10 months agoclosedStuart_L
♦151
4973425
Category: Unknown
1~ 11 months agoopenedInfiNorth
♦149
I am fairly certain this trail does not allow for cycling. It would only be suitable for mountain bikes, and the trailhead doesn't say it is a cycling trail.
2~ 8 months agoclosedStuart_L
♦151
Just checked on https://bcparks.ca/skagit-valley-park/ and it says "Bicycles are permitted on all roadways, the Centennial Trail and Skagit River Trail in Skagit Valley Park" so it appears that the trail here permits bicycles unless it is mis-named