| Note | # | ⏱️ Last updated | Event | Contributor | Comment |
|---|---|---|---|---|---|
| 2886442 | 1 | ~ 4 years ago | opened | Benjamin Muller ♦31 | This leg of Traveler Street has been closed under a reconfiguration of the intersection. Includes several transit relations that must be corrected before deletion. |
| 2 | ~ 2 years ago | commented | lmum ♦1,000 | Intersection was reconfigured in 2022 and matches imagery. to me, it looks like the 9 Inbound bus route is incorrectly tagged. I don't do much with transit relations, can someone who does address this? | |
| 3 | ~ 9 months ago | commented | dannmer ♦18,951 | Has this been fixed? | |
| 4 | ~ 2 months ago | commented | dannmer ♦18,951 | Can someone take a look at this to see if it's been fixed? | |
| 5 | ~ 11 days ago | closed | cubbe8 ♦63 | Yes fixed | |
| 3607911 | 1 | ~ 3 years ago | opened | erf4 ♦14 | Unable to answer "Is there a bench at this stop?" for https://osm.org/way/769481997 via StreetComplete 51.1: There is a bench on the connected section of platform to the south |
| 2 | ~ 1 month ago | closed | cubbe8 ♦63 | ||
| 4690373 Category: StreetComplete | 1 | ~ 1 year ago | opened | jstuli ♦1 | Unable to answer "Do these steps have a ramp? What kind?" – Steps – https://osm.org/way/220541945 via StreetComplete 60.3: There is no ramp, but there is an elevator |
| 2 | ~ 1 year ago | commented | lmum ♦1,000 | Currently, OSM data indicate that the elevator can only be reached by steps. Do you recall if the route to access to the elevator has ramp access? | |
| 3 | ~ 1 month ago | closed | cubbe8 ♦63 | ||
| 3980072 | 1 | ~ 2 years ago | opened | adeverteuil | 16 and 17 take separate paths, separated by a glass wall for about 10 meters, then splitting out. |
| 2 | ~ 1 year ago | commented | CurlingMan13 ♦52,641 | Possibly map as two walkways? Or would it make more sense to add: Seperated=yes or divided=yes, or something like that? | |
| 3 | ~ 1 month ago | closed | cubbe8 ♦63 | ||
| 4813094 Category: StreetComplete | 1 | ~ 10 months ago | opened | hdevine825 ♦680 | Parklet here via StreetComplete 61.1 Attached photo(s): https://streetcomplete.app/p/285437.jpg |
| 2 | ~ 9 months ago | commented | lmum ♦1,000 | I've removed the parking outline from this from this section, but it's not clear from imagery how the parklet should be traced. | |
| 3 | ~ 3 months ago | closed | cubbe8 ♦63 | no more | |
| 4890819 Category: StreetComplete | 1 | ~ 8 months ago | opened | absentwalrus ♦38 | Unable to answer "Do these traffic lights have a tactile indication for blind people for when it’s safe to cross?" – Crossing With Pedestrian Signals – https://osm.org/node/12122565971 via StreetComplete 61.2: I've never understood what this means. |
| 2 | ~ 3 months ago | closed | cubbe8 ♦63 | it means does it have aps | |
| 5009804 Category: Unknown | 1 | ~ 6 months ago | opened | Ian Wagner ♦27 | It looks like this may be mapped wrong. From satellite imagery I can see a left turn indication which suggests that you can legally turn left onto Blue Hill Avenue, but right now there's no real path to do that. Additionally, it looks like you may be able to proceed legally straight onto Georgia Street, but probably should be verified by someone with local knowledge. |
| 2 | ~ 3 months ago | closed | cubbe8 ♦63 | fixed | |
| 5065708 Category: Unknown | 1 | ~ 4 months ago | opened | --- | Shouldn't Bridge Street start from the intersection with Veterans of Foreign Wars Parkway? |
| 2 | ~ 3 months ago | closed | cubbe8 ♦63 | No street sign present | |
| 4448226 Category: unknown | 1 | ~ 1 year ago | opened | cubbe8 ♦63 | new playground and field need to be added, no imagery available |
| 2 | ~ 3 months ago | closed | cubbe8 ♦63 | ||
| 3816838 | 1 | ~ 2 years ago | opened | moses4690226 ♦23 | This only have single lane traffic via StreetComplete 53.3 Attached photo(s): https://westnordost.de/p/165811.jpg |
| 2 | ~ 2 years ago | commented | KiloThree ♦32 | Given the intersection has 2 lanes going straight into this section, and further along this is marked for 2 lanes with the same width, I think this is still 2 lanes. Looking at mapillary, there were lane markings, I think they've just worn? | |
| 3 | ~ 2 years ago | commented | CurlingMan13 ♦52,641 | I agree they are probably just worn. What should be done in order to close the note? | |
| 4 | ~ 2 years ago | commented | KiloThree ♦32 | If there still aren't markings at this location, I'd suggest filing a 311 request with the city, and we could add `lane_markings=no` in the meantime. I wouldn't remove the lanes count, as this does continue to function as 2 traffic lanes even with degraded markings | |
| 5 | ~ 4 months ago | closed | cubbe8 ♦63 | ||
| 4863464 Category: unknown | 1 | ~ 9 months ago | opened | absentwalrus ♦38 | This bike lane continues up Ruggles Street |
| 2 | ~ 9 months ago | commented | absentwalrus ♦38 | Although it goes from a path next to the sidewalk, on the same level. To a lane in the road with pylons. To paint on the side of the street. All on the same street. Welcome to Boston. | |
| 3 | ~ 5 months ago | closed | cubbe8 ♦63 | ||
| 4056041 | 1 | ~ 2 years ago | opened | AntiCompositeNumber ♦355 | Is this a MassDOT lot? It's not listed at https://www.mass.gov/park-and-ride. Verify parking operator. |
| 2 | ~ 5 months ago | closed | cubbe8 ♦63 | ||
| 4656213 Category: unknown | 1 | ~ 1 year ago | opened | temportalflux ♦3 | Ongoing construction on and next to River St from Green St to Mass Ave. Limited impact on roads, but sidewalks are often closed/moved. Likely to continue for many months of 2025. |
| 2 | ~ 1 year ago | commented | CurlingMan13 ♦52,641 | Ok. Just make sure to keep it updated. If you forget, I am sure someone will ping this note semi-regularly to make sure it wasn't forgotten about. | |
| 3 | ~ 1 year ago | commented | temportalflux ♦3 | Will do. I'm sure this will continue for a number of months yet. Its been active for at least a year or two so far. | |
| 4 | ~ 5 months ago | commented | RedEyedVireo ♦158 | Construction is still ongoing here with closed sidewalks and temporary traffic control as of Monday. | |
| 5 | ~ 5 months ago | commented | cubbe8 ♦63 | this is being monitored on weekly basis | |
| 6 | ~ 5 months ago | closed | cubbe8 ♦63 | ||
| 5051733 Category: Unknown | 1 | ~ 5 months ago | opened | Ripe_Berries ♦1 | There needs to be a connection here to allow bicycles to access the carlton street foot bridge from carlton st. The current infrastructure makes cyclists use 3 Carlton street's drive way. |
| 2 | ~ 5 months ago | closed | cubbe8 ♦63 | ||
| 4315927 | 1 | ~ 1 year ago | opened | lmum ♦1,000 | Separated bike paths will be added to Comm Ave carriageway in 2025 (Auburn St to Melrose). Adding a note here to ensure they are updated once complete https://www.newtonma.gov/government/planning/transportation-planning/projects/commonwealth-avenue-carriageway-redesign |
| 2 | ~ 5 months ago | commented | RedEyedVireo ♦158 | This is still an ongoing project as of mid Sept 2025. | |
| 3 | ~ 5 months ago | closed | cubbe8 ♦63 | ||
| 4 | ~ 5 months ago | reopened | cubbe8 ♦63 | ||
| 5 | ~ 5 months ago | closed | cubbe8 ♦63 | ok we did it | |
| 3134064 | 1 | ~ 4 years ago | opened | cdevers ♦24 | The Tobin School has been razed, and the area between Concord Avenue and Vassal Lane, bounded by Fresh Pond Parkway & the Massachusetts National Guard site to the west and the houses along Alpine St to the east, is now a giant construction site. This includes the area of the Father Callanan Playground. As of April 2022, the site has been more or less leveled and new construction hasn’t started yet. |
| 2 | ~ 1 year ago | commented | lmum ♦1,000 | It looks like this is still under construction, with a target open date in Fall 2025 | |
| 3 | ~ 8 months ago | closed | cubbe8 ♦63 | ||
| 4803495 Category: unknown | 1 | ~ 10 months ago | opened | kilroywashere81 ♦340 | What's going on here? Is there a gate in the sidewalk? |
| 2 | ~ 10 months ago | commented | dannmer ♦18,951 | It looks like the intention was to map a gate in the fence | |
| 3 | ~ 8 months ago | closed | cubbe8 ♦63 | ||
| 2636914 | 1 | ~ 4 years ago | opened | colgza | Most of the light rail stops on the MBTA Green Line west of Copley station should be tagged with `railway=halt`. |
| 2 | ~ 4 years ago | commented | colgza | https://wiki.openstreetmap.org/wiki/Tag:railway%3Dhalt | |
| 3 | ~ 4 years ago | commented | colgza | It is also acceptable to use `railway=tram_stop` on light rail stops. | |
| 4 | ~ 8 months ago | closed | cubbe8 ♦63 | ||
| 3838944 | 1 | ~ 2 years ago | opened | JesseFTW ♦464 | Now under construction via StreetComplete 53.2 Attached photo(s): https://westnordost.de/p/168756.jpg |
| 2 | ~ 8 months ago | closed | cubbe8 ♦63 | ||
| 4895574 Category: unknown | 1 | ~ 8 months ago | opened | jm428 ♦119 | Is this real? I didn't see any signs of a cycleway under construction |
| 2 | ~ 8 months ago | closed | Hypsometric ♦4,329 | If you are referring to the way under this note (https://www.openstreetmap.org/way/382228674) it is underground power cable. I haven't ever noticed one before. I had to take a closer look to realize what it was. In iD it looks like a way that is under construction... until I looked at the tags. :-) | |
| 3 | ~ 8 months ago | reopened | jm428 ♦119 | I was talking about this, it is on top of the underground power cable https://www.openstreetmap.org/way/1354066740/ | |
| 4 | ~ 8 months ago | commented | Hypsometric ♦4,329 | Thanks. That explains why it looked like construction. The cycleway is already tagged on River Street (https://www.openstreetmap.org/way/799519915). The way in question was added 6 months ago (https://www.openstreetmap.org/changeset/161732793). If a new cycleway is being put in that is separate from the road (i.e. it is not a bike lane) then it should stay. If they are just updating the cycleway which is a bike lane in the street, then the way should be deleted. | |
| 5 | ~ 8 months ago | closed | cubbe8 ♦63 | New sidewalk level cycle track is being installed. | |
| 4857602 Category: unknown | 1 | ~ 9 months ago | opened | cubbe8 ♦63 | Sign at Riverway says pilgrim road but sign at Francis says this is also Francis. Not sure which name to use |
| 2 | ~ 9 months ago | closed | cubbe8 ♦63 | The sign at Francis and pilgrim appears to be bent. | |
| 4787548 Category: StreetComplete | 1 | ~ 10 months ago | opened | DMilechin ♦17 | Unable to answer "Is this foot path completed?" – Road Under Construction – https://osm.org/way/1247469143 via StreetComplete 61.1: This lot is demolished |
| 2 | ~ 10 months ago | commented | CurlingMan13 ♦52,641 | Still a construction zone? | |
| 3 | ~ 10 months ago | commented | DMilechin ♦17 | Not sure if it's an active construction site currently, but it does seem they are getting ready to build something soon. | |
| 4 | ~ 9 months ago | closed | cubbe8 ♦63 | This is under construction | |
| 4787547 Category: StreetComplete | 1 | ~ 10 months ago | opened | DMilechin ♦17 | Unable to answer "Is this foot path completed?" – Road Under Construction – https://osm.org/way/1247952955 via StreetComplete 61.1: This lot is demolished. |
| 2 | ~ 9 months ago | closed | cubbe8 ♦63 | ||
| 4787545 Category: StreetComplete | 1 | ~ 10 months ago | opened | DMilechin ♦17 | Unable to answer "Is this foot path completed?" – Road Under Construction – https://osm.org/way/1289786922 via StreetComplete 61.1: This lot is Demolished |
| 2 | ~ 9 months ago | closed | cubbe8 ♦63 | ||
| 4787546 Category: StreetComplete | 1 | ~ 10 months ago | opened | DMilechin ♦17 | Unable to answer "Is this foot path completed?" – Road Under Construction – https://osm.org/way/1247952951 via StreetComplete 61.1: This lot is Demolished |
| 2 | ~ 9 months ago | closed | cubbe8 ♦63 | ||
| 4787544 Category: StreetComplete | 1 | ~ 10 months ago | opened | DMilechin ♦17 | Unable to answer "Is this foot path completed?" – Road Under Construction – https://osm.org/way/1247469134 via StreetComplete 61.1: This lot is Demolished |
| 2 | ~ 9 months ago | closed | cubbe8 ♦63 | ||
| 4787543 Category: StreetComplete | 1 | ~ 10 months ago | opened | DMilechin ♦17 | Unable to answer "Is this foot path completed?" – Road Under Construction – https://osm.org/way/1247469151 via StreetComplete 61.1: This lot is Demolished |
| 2 | ~ 9 months ago | closed | cubbe8 ♦63 | Don’t need so many notes for the same thing | |
| 4344042 | 1 | ~ 1 year ago | opened | lmum ♦1,000 | Volpe redevelopment will begin in 2024-25. Areas between Third/Potter/Fifth/Monoe/Binney should be tagged as construction once groundbreaking occurs. |
| 2 | ~ 10 months ago | closed | cubbe8 ♦63 | okay done |