OpenStreetMap Note Activities of cubbe8 for the last 12 Months
Overall Activities | 12 Months
Opened: 0 (0%) Commented: 1 (5%) Closed: 18 (90%) Reopened: 1 (5%)
Stats per month
Latest | Limit 250
Latest | Limit 250 | The colored events are made by cubbe8
Note#⏱️ Last updatedEventContributorComment
5347769
Category: Unknown
1~ 2 months agoopenedwijwijBicycle contraflow lane on east side of Park St runs north from Marion St to Beacon St.
2~ 2 months agocommentedwijwijCar traffic is one way on Park St from Beacon St to Marion St only. Rest of Park St is two-way. I am new to osm and do not know how to add the tags for this.
3~ 1 month agoclosedcubbe8
♦65
5339821
Category: Unknown
1~ 2 months agoopenedjm428
♦195
Area of park south of this note is under construction
2~ 1 month agoclosedcubbe8
♦65
28864421~ 4 years agoopenedBenjamin Muller
♦31
This leg of Traveler Street has been closed under a reconfiguration of the intersection. Includes several transit relations that must be corrected before deletion.
2~ 2 years agocommentedlmum
♦1,095
Intersection was reconfigured in 2022 and matches imagery. to me, it looks like the 9 Inbound bus route is incorrectly tagged. I don't do much with transit relations, can someone who does address this?
3~ 1 year agocommenteddannmer
♦22,645
Has this been fixed?
4~ 7 months agocommenteddannmer
♦22,645
Can someone take a look at this to see if it's been fixed?
5~ 4 months agoclosedcubbe8
♦65
Yes fixed
36079111~ 3 years agoopenederf4
♦16
Unable to answer "Is there a bench at this stop?" for https://osm.org/way/769481997 via StreetComplete 51.1: There is a bench on the connected section of platform to the south
2~ 5 months agoclosedcubbe8
♦65
4690373
Category: StreetComplete
1~ 1 year agoopenedjstuli
♦1
Unable to answer "Do these steps have a ramp? What kind?" – Steps – https://osm.org/way/220541945 via StreetComplete 60.3: There is no ramp, but there is an elevator
2~ 1 year agocommentedlmum
♦1,095
Currently, OSM data indicate that the elevator can only be reached by steps. Do you recall if the route to access to the elevator has ramp access?
3~ 5 months agoclosedcubbe8
♦65
39800721~ 2 years agoopenedadeverteuil
♦9
16 and 17 take separate paths, separated by a glass wall for about 10 meters, then splitting out.
2~ 1 year agocommentedCurlingMan13
♦54,282
Possibly map as two walkways? Or would it make more sense to add: Seperated=yes or divided=yes, or something like that?
3~ 6 months agoclosedcubbe8
♦65
4813094
Category: StreetComplete
1~ 1 year agoopenedhdevine825
♦707
Parklet here via StreetComplete 61.1 Attached photo(s): https://streetcomplete.app/p/285437.jpg
2~ 1 year agocommentedlmum
♦1,095
I've removed the parking outline from this from this section, but it's not clear from imagery how the parklet should be traced.
3~ 8 months agoclosedcubbe8
♦65
no more
4890819
Category: StreetComplete
1~ 1 year agoopenedabsentwalrus
♦38
Unable to answer "Do these traffic lights have a tactile indication for blind people for when it’s safe to cross?" – Crossing With Pedestrian Signals – https://osm.org/node/12122565971 via StreetComplete 61.2: I've never understood what this means.
2~ 8 months agoclosedcubbe8
♦65
it means does it have aps
5009804
Category: Unknown
1~ 10 months agoopenedIan Wagner
♦27
It looks like this may be mapped wrong. From satellite imagery I can see a left turn indication which suggests that you can legally turn left onto Blue Hill Avenue, but right now there's no real path to do that. Additionally, it looks like you may be able to proceed legally straight onto Georgia Street, but probably should be verified by someone with local knowledge.
2~ 8 months agoclosedcubbe8
♦65
fixed
5065708
Category: Unknown
1~ 9 months agoopened---Shouldn't Bridge Street start from the intersection with Veterans of Foreign Wars Parkway?
2~ 8 months agoclosedcubbe8
♦65
No street sign present
4448226
Category: unknown
1~ 1 year agoopenedcubbe8
♦65
new playground and field need to be added, no imagery available
2~ 8 months agoclosedcubbe8
♦65
38168381~ 3 years agoopenedmoses4690226
♦23
This only have single lane traffic via StreetComplete 53.3 Attached photo(s): https://westnordost.de/p/165811.jpg
2~ 3 years agocommentedKiloThree
♦32
Given the intersection has 2 lanes going straight into this section, and further along this is marked for 2 lanes with the same width, I think this is still 2 lanes. Looking at mapillary, there were lane markings, I think they've just worn?
3~ 2 years agocommentedCurlingMan13
♦54,282
I agree they are probably just worn. What should be done in order to close the note?
4~ 2 years agocommentedKiloThree
♦32
If there still aren't markings at this location, I'd suggest filing a 311 request with the city, and we could add `lane_markings=no` in the meantime. I wouldn't remove the lanes count, as this does continue to function as 2 traffic lanes even with degraded markings
5~ 9 months agoclosedcubbe8
♦65
4863464
Category: unknown
1~ 1 year agoopenedabsentwalrus
♦38
This bike lane continues up Ruggles Street
2~ 1 year agocommentedabsentwalrus
♦38
Although it goes from a path next to the sidewalk, on the same level. To a lane in the road with pylons. To paint on the side of the street. All on the same street. Welcome to Boston.
3~ 9 months agoclosedcubbe8
♦65
40560411~ 2 years agoopenedAntiCompositeNumber
♦366
Is this a MassDOT lot? It's not listed at https://www.mass.gov/park-and-ride. Verify parking operator.
2~ 9 months agoclosedcubbe8
♦65
4656213
Category: unknown
1~ 1 year agoopenedtemportalflux
♦3
Ongoing construction on and next to River St from Green St to Mass Ave. Limited impact on roads, but sidewalks are often closed/moved. Likely to continue for many months of 2025.
2~ 1 year agocommentedCurlingMan13
♦54,282
Ok. Just make sure to keep it updated. If you forget, I am sure someone will ping this note semi-regularly to make sure it wasn't forgotten about.
3~ 1 year agocommentedtemportalflux
♦3
Will do. I'm sure this will continue for a number of months yet. Its been active for at least a year or two so far.
4~ 10 months agocommentedRedEyedVireo
♦158
Construction is still ongoing here with closed sidewalks and temporary traffic control as of Monday.
5~ 10 months agocommentedcubbe8
♦65
this is being monitored on weekly basis
6~ 9 months agoclosedcubbe8
♦65
5051733
Category: Unknown
1~ 9 months agoopenedRipe_Berries
♦1
There needs to be a connection here to allow bicycles to access the carlton street foot bridge from carlton st. The current infrastructure makes cyclists use 3 Carlton street's drive way.
2~ 9 months agoclosedcubbe8
♦65
43159271~ 2 years agoopenedlmum
♦1,095
Separated bike paths will be added to Comm Ave carriageway in 2025 (Auburn St to Melrose). Adding a note here to ensure they are updated once complete https://www.newtonma.gov/government/planning/transportation-planning/projects/commonwealth-avenue-carriageway-redesign
2~ 10 months agocommentedRedEyedVireo
♦158
This is still an ongoing project as of mid Sept 2025.
3~ 9 months agoclosedcubbe8
♦65
4~ 9 months agoreopenedcubbe8
♦65
5~ 9 months agoclosedcubbe8
♦65
ok we did it