OpenStreetMap Note Activities of nyanpsyche for the last 12 Months
Overall Activities | 12 Months
Opened: 23 (23%) Commented: 13 (13%) Closed: 60 (60%) Reopened: 4 (4%)
Stats per month
Latest | Limit 250
Latest | Limit 250 | The colored events are made by nyanpsyche
Note#⏱️ Last updatedEventContributorComment
4960470
Category: Unknown
1~ 1 year agoopenednyanpsyche
♦118
Traffic signals currently being installed.
2~ 10 months agocommentedmaxwellward
♦2,979
Are these signals now installed?
3~ 10 months agocommentednyanpsyche
♦118
Yes, but they haven't been turned on yet
4~ 10 months agocommentedkeithonearth
♦1,775
It might be worth it if I add to this comment, that the traffic lights are still wrapped up in plastic, and inactive.
5~ 10 months agocommentednyanpsyche
♦118
Great point! There also aren't pavement markings for the stop lines and pedestrian crossings yet, so I'd speculate that the signals might not be turned on until after winter.
6~ 7 months agocommentedSieva
♦93
Still not on.
7~ 7 months agocommentednyanpsyche
♦118
New duct banks have been installed over the last few weeks. The sidewalk was removed and the replacement currently being cured.
8~ 4 months agocommentednyanpsyche
♦118
Cambie street has been repaved and temporary lane markings are in place. Permanant painting seems to be taking place this weekend, and it looks likely that these lights will be activated then.
9~ 4 months agocommentedSieva
♦93
Lane markings aren't done, lights are not on.
10~ 3 months agocommentedSieva
♦93
Lights are still not on.
11~ 2 months agocommentednyanpsyche
♦118
Signal heads are being installed today on W 30th Ave
12~ 20 days agoclosednyanpsyche
♦118
5513825
Category: StreetComplete
1~ 24 days agoopenedmachegav
♦4
Unable to answer "What’s the surface here?" – Foot Path – https://osm.org/way/1274313553 via StreetComplete 63.4: No path exists Attached photo(s): https://streetcomplete.app/p/370630.jpg
2~ 23 days agoclosednyanpsyche
♦118
5513821
Category: StreetComplete
1~ 24 days agoopenedmachegav
♦4
Unable to answer "Do the trees here have needles or leaves?" – Tree Row – https://osm.org/way/1086865319 via StreetComplete 63.4: Shrubs only Attached photo(s): https://streetcomplete.app/p/370629.jpg
2~ 23 days agoclosednyanpsyche
♦118
5513498
Category: Unknown
1~ 24 days agoopenednyanpsyche
♦118
There is a new protected cycleway along Broughton Street and Hastings treet adjacent to the new school building.
2~ 20 days agoclosedkrmatthews
♦8
5483620
Category: Unknown
1~ 1 month agoopenedEdDThese islands need names. I think they're N & S Pender Island but it would be better if somebody with local knowledge to be sure could edit them.
2~ 1 month agoclosednyanpsyche
♦118
The north and south Pender Islands are already named https://www.openstreetmap.org/relation/2140392 https://www.openstreetmap.org/relation/8335965
5312791
Category: Unknown
1~ 4 months agoopenednyanpsyche
♦118
BMO will be moving their branch to this location once construction is complete
2~ 3 months agocommentedSieva
♦93
still under construction
3~ 1 month agoclosednyanpsyche
♦118
Drove by and there was signage saying it was open. Haven't been able to confirm on the ground though.
4~ 1 month agoreopenednyanpsyche
♦118
5~ 27 days agoclosedQuigleyJones
♦3,307
added
5401507
Category: Unknown
1~ 2 months agoopenednyanpsyche
♦118
New traffic signals are being installed here, but construction seems to have been stalled/delayed. Unlikely to be in service any time soon.
2~ 1 month agoclosednyanpsyche
♦118
5429041
Category: StreetComplete
1~ 2 months agoopenedZarr
♦1,117
Driveway should connect to road via StreetComplete 63.2
2~ 1 month agoclosednyanpsyche
♦118
Connected, thanks for the comment
5410281
Category: Unknown
1~ 2 months agoopenednyanpsyche
♦118
Changest 186104426 reverted the north side pedestrian crossing to the old alignment. This was previously mapped correctly per the current configuration following the opening of Oakridge mall
2~ 2 months agoclosednyanpsyche
♦118
5411517
Category: Unknown
1~ 2 months agoopenednyanpsyche
♦118
I should've taken better notes, but there is currently a bus stop here
2~ 2 months agoclosedjustinsenemy
♦292
5407778
Category: Unknown
1~ 2 months agoopeneddgryski
♦100
This tree row outline is incorrect.
2~ 2 months agoclosednyanpsyche
♦118
Corrected, thanks for the note.
5392364
Category: Unknown
1~ 2 months agoopened---Routing data defect: restriction relation 12166279 (only_left_turn) is topologically disconnected. The from way 469031153 and via way 894089971 share no OSM node in the 2026-07-11 Geofabrik BC snapshot and current relation data. Please verify the signed turn geometry and reconnect, update, or remove the relation based on local evidence. This prevents strict light-vehicle routing validation.
2~ 2 months agoclosednyanpsyche
♦118
Thanks from the comment. There were some overlapping & redundant restrictions as well as this misconnected one. I've revised the intersection with a fresh set of restriction relations to address the errors and improve clarity.
5189297
Category: Unknown
1~ 7 months agoopenednyanpsyche
♦118
New Traffic signals have been installed, but are not active.
2~ 4 months agocommentedQwandri
♦9
Traffic signals still not active as of today
3~ 3 months agocommentedSieva
♦93
still not active
4~ 2 months agoclosednyanpsyche
♦118
Lights have been activated
5346396
Category: Unknown
1~ 3 months agoopenedSieva
♦93
1. The bike tracks are on both sides of the road, separated with concrete barriers. Not very consistent. 2. This bike track's direction is wrong.
2~ 2 months agoclosednyanpsyche
♦118
Thanks for the note. Bike tracks have now been mapped separately on both sides and the incorrectly mapped direction has been fixed.
4695051
Category: unknown
1~ 1 year agoopenedInfiNorth
♦154
132 St has protected bike lanes. Currently mapped as "standard lane," should be "bike track" in segments that are protected.
2~ 2 months agocommentednyanpsyche
♦118
Added; thank you for the note.
3~ 2 months agoclosednyanpsyche
♦118
5377297
Category: EveryDoor
1~ 3 months agoopenednyanpsyche
♦118
culvert #EveryDoor
5377296
Category: EveryDoor
1~ 3 months agoopenednyanpsyche
♦118
trail bend and creek culvert are at the same location #EveryDoor
5371918
Category: Unknown
1~ 3 months agoopenednyanpsyche
♦118
New running track has been completed.
2~ 22 days agocommentedmaxwellward
♦2,979
Added the rough outline of the new track
3~ 21 days agoclosedQuigleyJones
♦3,307
fixed
5314345
Category: Unknown
1~ 4 months agoopenednyanpsyche
♦118
Choy Yuen Crescent & the adjacent cycleway looked open from 45th Ave, but I didn't get a chance to survey down the road to see if that was true.
2~ 4 months agocommentednyanpsyche
♦118
Sign at the start of the cycle path says "cyclists dismount". Path isn't painted either so looks like they opened it temporarily but it's not completed yet
3~ 4 months agoclosednyanpsyche
♦118
Surveyed
5312792
Category: Unknown
1~ 4 months agoopenednyanpsyche
♦118
RBC is moving their branch here. Unclear when exactly it will open based off signage.
2~ 3 months agocommentedSieva
♦93
“opening soon” as of now. the place looks empty.
5273066
Category: Unknown
1~ 5 months agoopenedTriangleMaple
♦439
https://dailyhive.com/vancouver/7-eleven-vancouver-closure-knight-33rd The 7-Eleven here is apparently "permanently closing".
2~ 4 months agoclosednyanpsyche
♦118
5288325
Category: Unknown
1~ 4 months agoopenednyanpsyche
♦118
Mall will be opening on May 28. Currently unclear if surrounding roadworks (new sidewalk, bike paths) will be open prior to this date.
2~ 4 months agocommentedHlennrick
♦16
Outdoor area from the corner of 41 with the skytrain station to the mall door is open to public, mall is still not letting people in tho
3~ 4 months agoclosedHlennrick
♦16
Mall is open
5242724
Category: Unknown
1~ 5 months agoopenedBurnabyTomThere is a multi-use pathway on the north side of this section of Still Creek Avenue that connects the Central Valley Greenway to the SB bike lane on Willingdon Ave.
2~ 5 months agoclosednyanpsyche
♦118
Thanks for the note! I was able to confirm that this path is considered an urban trail by the City of Burnaby, but I've marked it a bicycle=yes instead of bicycle=designated since there's no signage along the path specifying it is a shared use path.
3~ 5 months agoreopenednyanpsyche
♦118
4~ 5 months agoclosednyanpsyche
♦118
I've come to the realization that this is inconsistent with similar urban trails that have been tagged. I will in fact be changing it to be bicycle=designated
5274225
Category: Unknown
1~ 5 months agoopenednyanpsyche
♦118
There are new sidewalks & curb ramps for pedestrian crossings along Fraser at the Kent Ave crossings. Haven't been able to survey the exact extent of additions yet.
2~ 4 months agoclosedkrmatthews
♦8
5251552
Category: Unknown
1~ 5 months agoopenednyanpsyche
♦118
Addresses ascend from west to east here. 129 & 139 are likely switched around and should be surveyed to confirm
2~ 5 months agocommentedDENelson83
♦2,520
i.e., Eastbound on East 8th Avenue is up the street.
3~ 5 months agocommentednyanpsyche
♦118
I've just noticed the typo in my original comment (how embarassing!), thanks for the clarification
4~ 5 months agocommentedDENelson83
♦2,520
Yeah, I define the terms "up" and "down" a street by referring to the house numbers on the street.
5~ 5 months agoclosedQuigleyJones
♦3,307
fixed
5226810
Category: Unknown
1~ 6 months agoopened---Recreation Centre North is missing
2~ 5 months agocommentedreplication
♦25
photo: Attached photo(s): https://streetcomplete.app/p/337156.jpg
3~ 5 months agocommentednyanpsyche
♦118
I've added the approx. building footprint, but I haven't surveyed the site to determine the exact situation on the ground.
4~ 4 months agoclosedQuigleyJones
♦3,307
5206083
Category: StreetComplete
1~ 6 months agoopenedNancy Devine
♦198
Not really a path. Gravel 0.5m wide by building and dirt in landscaping. via StreetComplete 63.0
2~ 6 months agocommentedjustinsenemy
♦292
Is this due to construction, or does it seem to be permanently like this?
3~ 6 months agocommentedNancy Devine
♦198
It is not an area under construction. There is evidence this is used as a path because here are pieces of wood set in the dirt to bridge over some of the muddier areas. To get to the path, we had to squeeze between the building and a dumpster. I don't think it rises to the level of a mapped path...more like a worn section in the grass where people cut through to make a shortcut.
4~ 5 months agoclosednyanpsyche
♦118
Based off historial imagery, the path shown mapped here was present prior to construction. Based off Nancy's comment it, I believe this path was removed and an informal desire path has now sprung up in its place. Unfortunately the most up to date imagery available for use does not yet show the status on the ground here, but I will make the necessary changes based off your information.
5254719
Category: CoMaps
1~ 5 months agoopenedmap_lover_42
♦1
"Name should be changed from "Archery" to "Burnaby Archery Range"" OSM snapshot date: 2026-04-05T19:23:11Z POI has no name POI types: sport-archery leisure-pitch #CoMaps android 2026.04.07-8
2~ 5 months agoclosednyanpsyche
♦118
Updated, thank you for your note.
5243148
Category: StreetComplete
1~ 5 months agoopenedtretono
♦23
Bench with water fountain via StreetComplete 63.0 Attached photo(s): https://streetcomplete.app/p/337375.jpg
2~ 5 months agoclosednyanpsyche
♦118
Thanks for the note, added
5244862
Category: Unknown
1~ 5 months agoopenedakana932
♦10
this tower and townhouse complex is now being demolished for redevelopment
2~ 5 months agoclosednyanpsyche
♦118
Thanks for the note; updated
5241824
Category: StreetComplete
1~ 5 months agoopenedreplication
♦25
single crossing, middle barrier does not extend quite so far via StreetComplete 63.0
2~ 5 months agoclosednyanpsyche
♦118
The crossing is already tagged as a single way with no refuge island explicitly tagged.
5241823
Category: StreetComplete
1~ 5 months agoopenedreplication
♦25
single crossing, middle barrier does not extend quite so far via StreetComplete 63.0
2~ 5 months agoclosednyanpsyche
♦118
The crossing is already tagged as a single way with no refuge island explicitly tagged.
5189295
Category: Unknown
1~ 7 months agoopenednyanpsyche
♦118
The TD Bank will be moving to this location s oon, but has not yet at the time of survey.
2~ 3 months agocommentedSieva
♦93
not open yet, construction indoors
5163913
Category: EveryDoor
1~ 7 months agoopenednyanpsyche
♦118
Mineral laboratory named Bureau Veritas. Street number 9950 #EveryDoor
2~ 7 months agoclosedmaxwellward
♦2,979
added
5150079
Category: Organicmaps
1~ 8 months agoopenedartelfer
♦1
"Silver Harbour Senior Centre" OSM snapshot date: 2025-11-23T18:39:39Z POI has no name POI types: building #organicmaps ios 2026.01.28-11-ios
2~ 8 months agoclosednyanpsyche
♦118
Added, thanks
5125985
Category: Unknown
1~ 8 months agoopenedDENelson83
♦2,520
Is this the Squamish Nation's band office?
2~ 8 months agocommentednyanpsyche
♦118
I don't believe so, their website lists it as 320 Seymour Blvd
3~ 8 months agocommentedDENelson83
♦2,520
Unfortunately, that address is not geocoded. Finding street address data for indigenous reserves in Canada is rather difficult.
4~ 6 months agocommentedSeeQuinn
♦7
No. This is a landscaping supply company.
5~ 4 months agoclosedQuigleyJones
♦3,307
added
5052687
Category: StreetComplete
1~ 10 months agoopenedScope65432
♦10
Fire hydrant via StreetComplete 61.3
2~ 8 months agoclosednyanpsyche
♦118
5138528
Category: Unknown
1~ 8 months agoopenedDENelson83
♦2,520
Bridge closed until further notice due to vessel strike. https://www.cbc.ca/news/canada/british-columbia/westham-island-bridge-closed-9.7055494
2~ 8 months agoclosednyanpsyche
♦118
I've updated the access restrictions to reflect that the bridge is closed for vehicles but open for pedestrian access
5152441
Category: Unknown
1~ 8 months agoopenednyanpsyche
♦118
The location of the bus stop suggests that buses may go straight through in the right-turn lane. Survey is needed to confirm.
2~ 8 months agocommentedself_aware_dodecahedron
♦2
This is correct, yes. The turn lane doubles as a bus bay.
3~ 8 months agoclosedself_aware_dodecahedron
♦2
5117857
Category: StreetComplete
1~ 9 months agoopenedlone-cloud
♦28
Unable to answer "What street is this on?" – house number 125: Building – https://osm.org/way/165621155 via StreetComplete 62.1: It's a shed/garage
2~ 8 months agoclosednyanpsyche
♦118
5129759
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What’s the surface here?" – Path – https://osm.org/way/402534102 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
5129757
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What surface does this road have?" – Parking Aisle – https://osm.org/way/381427844 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
5129756
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What’s the surface here?" – Foot Path – https://osm.org/way/257169819 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
5129755
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What kind of parking is this?" – Parking Lot – https://osm.org/way/381427848 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
5129754
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What kind of parking is this?" – Disabled (Parking Lot) – https://osm.org/way/381427853 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
5129753
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What kind of parking is this?" – Parking Lot – https://osm.org/way/381427849 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
5129758
Category: StreetComplete
1~ 8 months agoopenedlone-cloud
♦28
Unable to answer "What surface does this road have?" – Service Road – https://osm.org/way/260672010 via StreetComplete 62.1: Construction of new Harry Jerome here
2~ 8 months agoclosednyanpsyche
♦118
4719263
Category: unknown
1~ 1 year agoopened---There is a path here connecting the schoolyard to a pedestrian entrance next to the parking lot entrance.
2~ 1 year agocommentedmaxwellward
♦2,979
It appears this may no longer exist after some construction that was done.
3~ 8 months agoclosednyanpsyche
♦118
Foot path is visible in updated aerial imagery and has been added
5139264
Category: Unknown
1~ 8 months agoopenednyanpsyche
♦118
Looks like the mapped toilet here has since been demolished and replaced since it was added 10 years ago.
2~ 7 months agoclosedSieva
♦93
Fixed in https://www.openstreetmap.org/changeset/178639898
5066781
Category: Unknown
1~ 10 months agoopenednyanpsyche
♦118
Multiple speed humps have been installed along Union Street along with signage & road paint specifying "Cycle Street"
2~ 8 months agoclosednyanpsyche
♦118
5129766
Category: Unknown
1~ 8 months agoopenednyanpsyche
♦118
This separately mapped cycleway looks to be a painted bike lane and with no physical barriers from vehicle travel lanes on new imagery
2~ 8 months agoclosednyanpsyche
♦118
5129506
Category: Unknown
1~ 8 months agoopenednyanpsyche
♦118
Are these paths and staircases still here? It's hard to tell, but I can't seem to make anything out in the aerial imagery.
5122607
Category: StreetComplete
1~ 8 months agoopenedjoel56dt
♦217
Unable to answer "Do these traffic lights have a tactile indication for blind people for when it’s safe to cross?" – Crossing With Pedestrian Signals – https://osm.org/node/8085871612 via StreetComplete 62.1: This is an uncontrolled crossing, not a traffic controlled one.
2~ 8 months agoclosednyanpsyche
♦118
Indeed, updated!
5108715
Category: StreetComplete
1~ 9 months agoopenedZarr
♦1,117
Hole in pier here via StreetComplete 62.1
2~ 8 months agoclosednyanpsyche
♦118
Added
5117648
Category: StreetComplete
1~ 9 months agoopenedZarr
♦1,117
Canada Post drop box here via StreetComplete 62.1
2~ 9 months agoclosednyanpsyche
♦118
Added
5117647
Category: StreetComplete
1~ 9 months agoopenedZarr
♦1,117
Canada Post drop box via StreetComplete 62.1
2~ 9 months agoclosednyanpsyche
♦118
Added
5107691
Category: StreetComplete
1~ 9 months agoopenedlone-cloud
♦28
Unable to answer "What’s the name of this place?" – Thrift Store – https://osm.org/node/2061050832 via StreetComplete 62.1: Towers appt
2~ 9 months agoclosednyanpsyche
♦118
5106075
Category: StreetComplete
1~ 9 months agoopenedlone-cloud
♦28
Unable to answer "Is this still here?" – Salamat Financial Services (Financial Office) – https://osm.org/node/2061050828 via StreetComplete 62.1: Highrise towers here now
2~ 9 months agoclosednyanpsyche
♦118
5106077
Category: StreetComplete
1~ 9 months agoopenedlone-cloud
♦28
Unable to answer "Is this still here?" – Tehran Nights Restaurant (Restaurant) – https://osm.org/node/2061050827 via StreetComplete 62.1: High rise towers here now
2~ 9 months agoclosednyanpsyche
♦118
5106078
Category: StreetComplete
1~ 9 months agoopenedlone-cloud
♦28
Unable to answer "Is this still here?" – Persia Foods (Supermarket) – https://osm.org/node/2061050829 via StreetComplete 62.1: Appartment towers here
2~ 9 months agoclosednyanpsyche
♦118
Old buildings have been removed and replaced with a placeholder building to be revised once a proper trace can be completed.
4695052
Category: unknown
1~ 1 year agoopenedInfiNorth
♦154
Bikes lanes mapped separately should be mapped as part of the road.
2~ 9 months agoclosednyanpsyche
♦118
Looks like this has been completed
5099464
Category: Unknown
1~ 9 months agoopenedDENelson83
♦2,520
Syntax error. Each house number must be in a separate node or way, as Garmin devices cannot properly parse house numbers that are grouped like this.
2~ 9 months agoclosednyanpsyche
♦118
5112719
Category: StreetComplete
1~ 9 months agoopenedKrazET
♦35
Missing new laneway that extends north from Smith Avenue via StreetComplete 62.1
2~ 9 months agoclosednyanpsyche
♦118
Added, thanks.
4815348
Category: unknown
1~ 1 year agoopenedqueenofthenightosphere
♦196
Survey these service roads/driveways. They don't match up with Maple Ridge's 2023 Aerial Imagery.
2~ 9 months agoclosednyanpsyche
♦118
I've updated the existing driveway alignment to match the current aerial imagery from Bing & MapBox + added a missing driveway. They seem to reflect the same imagery shown on the Ridge View GIS
5047377
Category: Unknown
1~ 10 months agoopenednyanpsyche
♦118
Raised intersection should be installed here now according to this city announcement. https://www.shapeyourcity.ca/strathcona-traffic/news_feed/strathcona-traffic-calming-update-implementation
2~ 10 months agocommentedjustinsenemy
♦292
Has anyone been able to survey this? I keep forgetting to when I'm in the neighbourhood.
3~ 10 months agocommentednyanpsyche
♦118
I've been in the area about 3 times since I've made that note and have forgotten as well T.T
4~ 8 months agoclosedSieva
♦93
Fixed in https://www.openstreetmap.org/changeset/178071935
5066890
Category: StreetComplete
1~ 10 months agoopenedGenShibe
♦27
Unable to answer "What are the opening hours here?" – Hon's Wonton House (Restaurant) – https://osm.org/node/3937011916 via StreetComplete 62.0: changed to kinton ramen Attached photo(s): https://streetcomplete.app/p/317872.jpg
2~ 10 months agoclosednyanpsyche
♦118
Updated, thanks
4796625
Category: unknown
1~ 1 year agoopenednyanpsyche
♦118
Intersection geometry has been modified slightly & poles for traffic signals are currently being installed. Based on progress of construction, new signals may not be turned on until the end of the year.
2~ 10 months agoclosednyanpsyche
♦118
Traffic signals have been turned on
4442091
Category: Organicmaps
1~ 2 years agoopenedimcan8dn
♦3
"Business sold and name changed to Copper Otter Pub. Rekive Joe's and I'll add Copper Otter." The place has gone or never existed. A user of Organic Maps application has reported that the POI was visible on the map (see snapshot date below), but was not found on the ground. OSM snapshot date: 2024-09-04T00:27:27Z POI name: Jo's Place POI types: amenity-restaurant #organicmaps android
2~ 1 year agocommentedDENelson83
♦2,520
Why not just change it over?
3~ 11 months agoclosednyanpsyche
♦118
4960976
Category: Unknown
1~ 1 year agoopenedMateusz Konieczny
♦41,386
https://www.openstreetmap.org/node/10123845625#map=19/48.780181/-123.280361 is it actually a signed hitchhiking location? see https://github.com/openstreetmap/id-tagging-schema/pull/1705#issuecomment-3287987345
2~ 11 months agoclosednyanpsyche
♦118
4960975
Category: Unknown
1~ 1 year agoopenedMateusz Konieczny
♦41,386
https://www.openstreetmap.org/node/10123845624 is it actually a signed hitchhiking location? see https://github.com/openstreetmap/id-tagging-schema/pull/1705#issuecomment-3287987345
2~ 11 months agoclosednyanpsyche
♦118
Yep, I visited over the summer, and there are designated hitchiking points throughout the island. The stops have standard signage and usually have makeshift seats like plastic chairs or wooden benches.
5019023
Category: Unknown
1~ 11 months agoopenedeerib
♦219
"The Park Theatre" here closing on October 26, 2025. https://dailyhive.com/vancouver/vancouver-park-theatre-closing-80-years
2~ 11 months agocommentedjustinsenemy
♦292
Not sure if it's worth deleting this listing when it's coming back by the end of the year. https://www.ctvnews.ca/vancouver/article/team-behind-the-rio-set-to-reopen-vancouvers-park-theatre-by-years-end/
3~ 11 months agoclosednyanpsyche
♦118
No need to delete; I've added the disused lifesycle prefix and removed the cineplex tags.
4999044
Category: Unknown
1~ 11 months agoopenedTriangleMaple
♦439
Not quite sure if this should be tagged as grass or the park should be extended over here
2~ 11 months agoclosedTriangleMaple
♦439
Decided park boundary should be extended
3~ 11 months agoreopenednyanpsyche
♦118
4~ 11 months agoclosednyanpsyche
♦118
Hi, do you have a source that the park area has been extended? The City's GIS service still shows the park boundaries at their original extent, and I couldnt' find a press release that these properties have been converted to park space.
5~ 11 months agoreopenednyanpsyche
♦118
6~ 11 months agocommentedTriangleMaple
♦439
Hi there, sorry about that, I should've checked beforehand. I've surveyed the area before and the previous properties there have been converted into a general grass space somewhere between 2024 - 2025, so there isn't much aerial imagery available. I was going to revert the area of the park, however, I went to check the City's community plan, and does looks like the boundary is extended in their 'Metrotown Downtown' plan for land use. It's marked as "park/open space" I've linked the sources below: Community plan page: https://www.burnaby.ca/our-city/strategies-and-plans/official-community-plan/community-plans Downtown plan: https://burnaby.widen.net/s/mmjwrxv6pm/metrotown-downtown-plan (Map on page 49/165 of the pdf) I'll comment these sources on to the changeset discussion if these sources are good.
7~ 11 months agocommentedTriangleMaple
♦439
(If you count the numbers on the bottom of the pdf, it's Page 37)
8~ 11 months agoclosednyanpsyche
♦118
Good thinking, that's perfect! I hadn't thought to check the community plan. It's not a good source on its own, but it confirms what you assumed based on your survey, so it's reliable here.
5025751
Category: StreetComplete
1~ 11 months agoopenedZarr
♦1,117
North leg is stop sign controlled. No related signals. West leg has ped activated signal via StreetComplete 61.3
2~ 11 months agoclosednyanpsyche
♦118
5025612
Category: StreetComplete
1~ 11 months agoopenedZarr
♦1,117
North and South leg are stop sign controlled, no lights. East West is ped activated light only via StreetComplete 61.3
2~ 11 months agoclosednyanpsyche
♦118
4993752
Category: StreetComplete
1~ 11 months agoopenedZarr
♦1,117
Missing sidewalk west side down to 18th via StreetComplete 61.3
2~ 11 months agoclosednyanpsyche
♦118
5001701
Category: Unknown
1~ 11 months agoopenednyanpsyche
♦118
Didn't have time to take proper notes, but this building construction has completed and the Jaguar + Landrover dealer formerly located on 1st Ave & Burrard as moved here.
2~ 10 months agoclosedjustinsenemy
♦292
Updated, and made sure to change the name to the service centre. Their dealership is still on 4th and Burrard
4959224
Category: Unknown
1~ 1 year agoopenedUnarmored5156
♦39
This entire area has changed massively from satellite imagery, will need an update of routing. From a quick glance there’s brand new cycle paths and protected cycle crosswalks.
2~ 1 year agocommentedDENelson83
♦2,520
No kidding. There has been a lot of development there.
3~ 11 months agocommentednyanpsyche
♦118
I've added road alignments cycleways, sidewalks and crossings that are currently visible in the Esri aerial imagery. Works on the south side of Northfield Rd and the Northeast corner of Bowen Rd intersections aren't visible yet so they'll still need updating.
4992521
Category: Unknown
1~ 1 year agoopenedmaxwellward
♦2,979
Should be surveyed to see if this sidewalk actually exists, doesn't seem to on aerials
2~ 11 months agocommentednyanpsyche
♦118
Looks like this sidewalk was added 20 days ago in changeset. I assume a survey was completed then to support the addition. https://www.openstreetmap.org/changeset/172194427
3~ 11 months agoclosedmaxwellward
♦2,979