OpenStreetMap Note Activities of pehar_11 for the last 12 Months
Overall Activities | 12 Months
Opened: 34 (20%) Commented: 52 (31%) Closed: 82 (49%) Reopened: 1 (1%)
Stats per month
Latest | Limit 250
Latest | Limit 250 | The colored events are made by pehar_11
Note#⏱️ Last updatedEventContributorComment
5127973
Category: Unknown
1~ 1 month agoopenedpehar_11
♦202
Uklanjanje izlaza Anđeli u smjeru Istre.
5127970
Category: Unknown
1~ 1 month agoopenedpehar_11
♦202
Uspostava privremenog kružnog raksrižja (d=5m) radi potreba izgradnje izlaza Anđeli u smjeru Istre.
4534272
Category: StreetComplete
1~ 1 year agoopenedOsmwithspace
♦1,216
Here are some ways now. via StreetComplete 60.0-alpha1
2~ 11 months agocommentedpehar_11
♦202
Paths will be added after new aerial imagery is available. This note will stay unresolved until the necessary changes are made.
3~ 8 months agocommentedalessandrocarmeli
♦769
quali modifiche?
4~ 8 months agocommentedpehar_11
♦202
Correction and registration of the remaining pedestrian paths, surfaces and urban equipment in the north-eastern area of ​​the Benčić neighborhood is required. Due to the lack of photographs from the field or orthophoto showing the area, corrections and changes have not been entered on the map.
5~ 1 month agoclosedpehar_11
♦202
6~ 16 days agoreopenedOsmwithspace
♦1,216
I reopen it because it's not yet solved.
4533697
Category: StreetComplete
1~ 1 year agoopenedOsmwithspace
♦1,216
Here is a footway now. via StreetComplete 60.0-alpha1
2~ 1 year agocommentedpehar_11
♦202
27.11.2024. Path added. Please close this note if the issue is solved or provide additional information.
3~ 1 year agoclosedpehar_11
♦202
4~ 1 year agoreopenedOsmwithspace
♦1,216
5~ 1 year agocommentedOsmwithspace
♦1,216
I think we have to wait for a new satellite image.
6~ 11 months agocommentedpehar_11
♦202
Paths will be added after new aerial imagery is available. This note will stay unresolved until the necessary changes are made.
7~ 8 months agocommentedalessandrocarmeli
♦769
quali modifiche?
8~ 8 months agocommentedpehar_11
♦202
Correction and registration of the remaining pedestrian paths, surfaces and urban equipment in the north-eastern area of ​​the Benčić neighborhood is required. Due to the lack of photographs from the field or orthophoto showing the area, corrections and changes have not been entered on the map.
9~ 1 month agoclosedpehar_11
♦202
10~ 16 days agoreopenedOsmwithspace
♦1,216
I reopen it because it's not yet solved.
4891675
Category: unknown
1~ 7 months agoopened---Extra lane here. Apparently a bus stop, but cars are parking here (around 10 places). No road sign that it's not allowed.
2~ 6 months agocommentedpehar_11
♦202
At the attached location, there is no additional traffic lane; instead, the expansion is used as a platform for boarding and alighting passengers. According to the Road Traffic Safety Act, parking vehicles on all road surfaces where traffic is obstructed is prohibited, including bus stops - which in this case is properly marked with vertical and horizontal signage, even without a sign explicitly prohibiting stopping and parking.
3~ 6 months agocommentedpehar_11
♦202
In the near future, all bus stations in the area of Opatija and Lovran will be subsequently checked and changed, and at places that have characteristics and possibilities, OSM tag "highway:platform" (transit platform) will be introduced.
4~ 1 month agoclosedpehar_11
♦202
5112727
Category: Unknown
1~ 2 months agoopened---This old entrance / exit does not exist anymore.
2~ 1 month agoclosedpehar_11
♦202
Changes made.
5112722
Category: Unknown
1~ 2 months agoopened---This new entrance / exit is now open for traffic.
2~ 1 month agoclosedpehar_11
♦202
Changes made.
5091600
Category: Unknown
1~ 2 months agoopenedpehar_11
♦202
Molim uspostaviti kružno raskrižje na predmetnoj lokaciji.
4789799
Category: unknown
1~ 9 months agoopenedpehar_11
♦202
Novoizgrađeno kružno raskrižje u obodnoj zoni čvora Škurinje (A7) i Osječke ulice je pušteno u promet, iako su u tijeku radovi. Zbog formiranja novig raskrižja izmjenjene su pozicije ulazno-izlaznih krakova čvora Škurinje na način da su direktno spojeni sa uključnim i isključnim privizom silazno-ulazne rampe čvora Škurinje. Potrebno korigirati raskrižje i ostale sadržaje u zoni zahvata.
2~ 8 months agocommentedpehar_11
♦202
Uspostavljen redovam režim prometa na južnom kružnom raksrižju čvora Škurinje (D403/A7). Korekcija u tijeku.
3~ 8 months agocommentedalessandrocarmeli
♦769
Hvala na ispravcima, ali ako su otvoreni ispravni otvori i zatvaranja cesta s raznim relacijama, hvala
4~ 8 months agocommentedpehar_11
♦202
The D403/A7/Osječka ulica roundabout has been put into a temporary regime, with only the southern intersection in operation, with active approaches from the D403 direction towards the Škurinje junction (input arm), from the Zagreb direction towards Škurinje (exit lane), while the northern roundabout is under construction and is not in the regular traffic regime. Traffic signals at this location are out of use. After the establishment of the regular traffic regime on the entire Škurinje junction, which includes both roundabouts, a correction of routes and connections in the same area is required. Given the active duration of the works, the routes and connections have not been restored to their original state. The correction of the connections of the input-output arms of the Škurinje junction is underway as part of the project to update the data of the Rijeka bypass.
5~ 8 months agocommentedpehar_11
♦202
Uređeno je kružno raskrižje u punom obliku uz korekciju relacije D403 sa uključno-isključnim krakovima. Podaci destinacija na krakovima biti će ažurirani nakon uspostave vertikalne signalizacije.
6~ 7 months agocommentedpehar_11
♦202
U jutarnjim satima petka, 11.7.2025. godine u promet je u potpunosti pušteno kružno raskrižje sa privozima iz svih smjerova. Podaci destinacija na krakovima biti će ažurirani nakon obilaska terena i dokumentiranja vertikalne signalizacije.
7~ 5 months agocommentedpehar_11
♦202
Djelomično je ažurirana signalizacija na ulazno-izlaznim krakovima i privozima. Zbog nedostataka podataka, izmjene će u potpunosti biti završene nakon obilaska kružnog raskrižja.
8~ 4 months agoclosedpehar_11
♦202
4981438
Category: Unknown
1~ 5 months agoopened---Here is a connecting road which is a turn around option via the roundabouts to the INA petrol station, parking facility and A8 back to Matulji. Why has it been deleted here recently ? It has always existed and was always open for all traffic.
2~ 4 months agoclosedpehar_11
♦202
4975347
Category: Unknown
1~ 5 months agoopenedpehar_11
♦202
Uspostavljeno je kružno raskrižje na D8 na križanju Ljubljanska cesta/Pavlovac u oba smjera. Autobusno stajalište "Pavlovac" za linije 23 i 34 izmješteno je prije kružnog raskrižja iz smjera Rijeke u smjeru Matulja, te autobusna linija 34 ne koristi istoimeno stajalište zbog promjene lokacije. Ulica "Pavlovac" nakon uspostave kružnog rakrižja ima dva privoza, ulazni krak iz smjera Ljubljanske ceste u smjeru Pavlovca i izlazni krak iz smjera Pavlovca u smjeru Ljubljanske ceste. Izmjenjeni su pješački prijelazi na način da se isti od sada nalaze na svakom privozu, dok je u središtu i sa južne strane Ljubljanske ceste iz smjera Matulja u smjeru Rijeke projektirano zelenilo i zelene površine. Molim uspostavu kružnog raskrižja i korekciju autobsnih relacija za linije 23 i 34 u oba smjera.
2~ 5 months agoclosedgeorgandreas
♦60
4952689
Category: Unknown
1~ 5 months agoopened---The beginning of this path is overgrown completely, we couldnt find any way to get to it, we didn't even see where it was through the trees and shrubbery. I don't know how the other end looks, but it's definitely not accessible from the top currently
2~ 5 months agocommentedpehar_11
♦202
A note about the trail being inaccessible due to overgrown vegetation has been added to the trail. Since the trail exists and its condition further along is unknown, it remains marked on the map. If you have additional information, please add it in a comment so the map can be updated; otherwise, the note will be considered as resolved.
3~ 5 months agoclosedpehar_11
♦202
4802347
Category: StreetComplete
1~ 8 months agoopenednessie2010
♦117
In context of overlay "Things" – Kosić (Bus Stop) – https://osm.org/node/6784997188 via StreetComplete 61.1: Busstop must be next to the street
2~ 5 months agoclosedpehar_11
♦202
4968732
Category: Unknown
1~ 5 months agoopened---Zbog izvođenja radova izvanrednog održavanja na mostu Dobra IV na dionici autoceste A6, doći će do zatvaranja za prometa kraka čvora Vrbovsko kojim se prometuje iz naselja Vrbovsko u smjeru Rijeke. Predviđeno trajanje radova je od 18.09.2025. godine do 24.10.2025. godine. Za vrijeme trajanja radova promet će biti preusmjeren na obilazni pravac kako slijedi: naselje Vrbovsko i okolica – DC 42 – DC 3 – ŽC 5034 – čvor Ravna Gora (A6).
2~ 5 months agoclosedpehar_11
♦202
Izlazni krak čvora Vrbovsko (16+700 km) na autocesti A6 iz smjera Vrbovskog u smjeru Rijeke je privremeno zatvoren, stoga nema potrebe za trajnim zatvaranjem istoga.
4912552
Category: Organicmaps
1~ 6 months agoopenedmulc
♦1
"The leftovers of an old house on top of the hill, no roof, just remainders of the walls. Walls seem old, likely older then 70 years, but maybe just ruins would be a better label" OSM snapshot date: 2025-07-08T15:45:36Z POI has no name POI types: historic-ruins #organicmaps android
2~ 6 months agocommentedpehar_11
♦202
Building has been marked as abandoned and ruined. Please close this note or reply if further fixes are required.
3~ 5 months agoclosedpehar_11
♦202
4921477
Category: Spam
1~ 6 months agoopened---Potpisanim ugovorom između Općine Matulji, Hrvatskih autocesta i Bina-Istra, predviđa se izmještanje i izgradnja novog vijadukta u Ulici Branka Laginje na način da se ukloni postojeći prijelaz te se izmjesti prema zapadnom dijelu trase autoceste u smjeru tunela Učka, kako bi se omogućio prijelaz vozila za vrijeme izgradnje sjevernog kolnika između tunela Učka i izlaza Matulji-Opatija u smjeru Kanfanara. Postojeći cestovni prijelaz sa dvije prometne trake se uklanja s obzirom da njegov profil širine i visine ne odgovara parametrima za potrebu izgradnje novog kolnika. Na predmetnoj lokaciji planira se i izgradnja nerazvrstane ceste od Ulice Branka Laginje do Jankovićeve ceste, kao trajna pristupna cesta za lokalno stanovništvo s obzirom na prostorne i tehničke mogućnosti. Poveznica: https://www.novilist.hr/rijeka-regija/opatija/opcina-matulji-potpisala-nove-sporazume-s-hac-om-i-bina-istrom-evo-sto-je-dogovoreno/
2~ 5 months agocommentedpehar_11
♦202
Added but awaiting further information.
3~ 5 months agoclosedpehar_11
♦202
4965728
Category: Unknown
1~ 5 months agoopened---Zabrana prometa za sva vozila zbog radova na autocesti A6 na spojnom kraku čvora Orehovica (sa autoceste A7 na autocestu A6) na kolniku u smjeru Zagreba. Promet je preusmjeren i vodi se obilaznim pravcima: Za smjer Zagreb (od strane Krka/Križišća) obilazni pravac je: čvor Sv. Kuzam (A7) – DC 40 – čvor Čavle (A6). Obilazni pravac za vozila koja se kreću sa DC 404 za smjer Zagreb je: čvor Rijeka istok (Draga/A7) – čvor Sv. Kuzam (A7) – DC 40 – čvor Čavle (A6). Predviđeno trajanje radova je do 15.10.2025. godine“. Molimo korisnike za strpljenje i oprez.
2~ 5 months agoclosedpehar_11
♦202
Izlazni krak čvora Orehovica (81+300 km) na autocesti A6 iz smjera Križišća u smjeru Zagreba je privremeno zatvoren, stoga nema potrebe za trajnim zatvaranjem istoga.
4893195
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
Parking only for guests of Hotel Paris on this side of a road via StreetComplete 61.2
2~ 5 months agocommentedMilivojTočno. U Ulici Vladimira Nazora sa gornje i donjeg dijela ceste su parkinzi. Sa donje strane ceste samo za goste hotela Paris.
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4893194
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
Public parking on this side of a road via StreetComplete 61.2
2~ 7 months agocommentedkozlorf
♦398
Paid parking places, municipal zone-0
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4894113
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
4 public paid parking places along this side of the street, municipal zone-0 via StreetComplete 61.2
2~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
3~ 5 months agoclosedpehar_11
♦202
Changes made.
4894006
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
4 public parking places (paid, zone 0) via StreetComplete 61.2 Attached photo(s): https://streetcomplete.app/p/296122.jpg
2~ 5 months agocommentedMilivojTočno!
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4894121
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
Public parking places all along this side of the street, municipal zone-0 via StreetComplete 61.2
2~ 5 months agocommentedMilivojTočno!
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4894104
Category: unknown
1~ 7 months agoopenedkozlorf
♦398
Public paid parking, municipal zone-0
2~ 5 months agocommentedMilivojGotovo isključivo za goste hotela Imperijal
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4894099
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
10 public parking places along this side of the road, municipal zone-0 via StreetComplete 61.2
2~ 5 months agocommentedMilivojTočno.
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4894080
Category: StreetComplete
1~ 7 months agoopenedkozlorf
♦398
Paid public parking places all along this side of the road, municipal zone-0 via StreetComplete 61.2
2~ 5 months agocommentedMilivojTočno!
3~ 5 months agocommentedpehar_11
♦202
The data is currently under review and will be updated once its accuracy is confirmed.
4~ 5 months agoclosedpehar_11
♦202
Changes made.
4968036
Category: Unknown
1~ 5 months agoopenedMilivojOpatija, Garaža Gorovo. 1) Krivo su ucrtani ulasci u garažu: iz Ulice M.Tita u Ulicu Jurja Dobrile ulazi se s donje strane, a takav je i ulaz i u garažu (a ne kako je to ucrtano u karti). Sa gornje strane (na križanju ulice Jurja Dobrile i Drage Gervea se NE ulazi u garažu već izlazi). 2) Garaža ima i dio na koji se ulazi i izlazi iz Ulice Drage Gervaisa. 3) Ulica Vladimira Nazora je ostala jednosmjerna, ali u obratnom smjeru (a ne kako je pokazano sada na karti).
2~ 5 months agocommentedpehar_11
♦202
Podaci su u provjeri i bit će ažurirani nakon potvrde točnosti.
3~ 5 months agoclosedMilivoj
4941623
Category: Unknown
1~ 6 months agoopened---The opening date mentioned by user Pehar_11 for this round-about is outdated. The new real date for completion will be on 24 september.
2~ 5 months agoclosedpehar_11
♦202
The expected opening date of the roundabout on D3 Ljubljanska cesta/Pavlovac has been corrected to September 24th. Thank you for providing this information.
4921483
Category: unknown
1~ 6 months agoopened---Na predmetnoj lokaciji se nalazi P+R parkiralište za korisnike međugradske željeznice između Šapjana i Matulja. Parlirakište je osvijetljeno i bez naplate, a materijal podloge je krupan šljunak. Pristup parkiralištu moguć se kod ulice Ivana Matetića Ronjgova ili kod Ceste za Osojnaki. Karakteristike ulaza ne omogućuju parkiranje teretnih vozila i autobusa. Prodaja karata vrši se u vlaku kod osoblja ili putem HŽPP-a.
2~ 6 months agoclosedpehar_11
♦202
4921401
Category: unknown
1~ 6 months agoopened---Na službenim stranicama Bina-Istra čvor se vodi pod nazivom "Lupoglav".
2~ 6 months agoclosedpehar_11
♦202
MINISTARSTVO MORA, PROMETA I INFRASTRUKTURE 11 Na temelju članka 7. stavka 2. Zakona o cestama (»Narodne novine«, broj 84/11, 22/13, 54/13, 148/13, 92/14 i 110/19), ministar mora, prometa i infrastrukture donosi ODLUKU O OZNAČAVANJU AUTOCESTA Članak 1. Ovom se Odlukom uređuje označavanje autocesta, njihove stacionaže, brojeva izlaza i prometnih čvorišta te naziva izlaza, prometnih čvorišta i odmorišta.
4921399
Category: unknown
1~ 6 months agoopened---Na službenim stranicama Bina-Istra čvor se vodi pod nazivom "Vranja".
2~ 6 months agoclosedpehar_11
♦202
MINISTARSTVO MORA, PROMETA I INFRASTRUKTURE 11 Na temelju članka 7. stavka 2. Zakona o cestama (»Narodne novine«, broj 84/11, 22/13, 54/13, 148/13, 92/14 i 110/19), ministar mora, prometa i infrastrukture donosi ODLUKU O OZNAČAVANJU AUTOCESTA Članak 1. Ovom se Odlukom uređuje označavanje autocesta, njihove stacionaže, brojeva izlaza i prometnih čvorišta te naziva izlaza, prometnih čvorišta i odmorišta.
4738081
Category: StreetComplete
1~ 10 months agoopenedmnalis ALTernative
♦13,706
radovi makadam via StreetComplete_ee 61.0-beta1 Attached photo(s): https://streetcomplete.app/p/275079.jpg https://streetcomplete.app/p/275080.jpg https://streetcomplete.app/p/275081.jpg
2~ 10 months agocommentedMatija Nalis
♦16,141
comment radi se most preko pruge
3~ 6 months agocommentedpehar_11
♦202
Završeni radovi, redovan promet (izvor: HAK)
4881270
Category: unknown
1~ 7 months agoopened---#mapycom our user indicates maxspeed 100 kmh
2~ 6 months agoclosedpehar_11
♦202
According to data from Hrvatske autoceste (Croatian Motorways), the speed limit on the Drežnik viaduct is set at 100 km/h, as indicated by the corresponding traffic sign; therefore, the speed has been corrected.
4896367
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Parkiralište
2~ 3 months agoclosedhbogner
♦1,488
dodano
4896366
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Kapelica na moru (u zoni 50 m)
4896365
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Mreža
4896364
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Kamera za video-nadzor
2~ 2 months agoclosedMatija Nalis
♦16,141
#added
4896363
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Mreža
4896362
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Mreža
2~ 2 months agoclosedMatija Nalis
♦16,141
#added
4896361
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Toranj spasioca
2~ 2 months agoclosedMatija Nalis
♦16,141
#added
4896360
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Samo ta vozila s dozvolom
2~ 2 months agoclosedMatija Nalis
♦16,141
#updated
4896359
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Površina za pješake // Trg
2~ 2 months agoclosedMatija Nalis
♦16,141
#added
4896358
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Fabro
2~ 2 months agoclosedMatija Nalis
♦16,141
#added
4896357
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Zona za pješake
2~ 2 months agoclosedMatija Nalis
♦16,141
#added
4896355
Category: unknown
1~ 6 months agoopenedpehar_11
♦202
Drukčiji oblik plaže // Materijal beton // Tuševi 2 kom // Suncobrani // Caffe bar // Mreža
2~ 2 months agoclosedMatija Nalis
♦16,141
#fixed poravnao plažu, stavio tuš i cafe; ali nepoznate precizine lokacije
4888717
Category: unknown
1~ 7 months agoopened---Photo point i ljuljačke
2~ 6 months agoclosedpehar_11
♦202
4888712
Category: unknown
1~ 7 months agoopened---Joo bar
2~ 6 months agoclosedpehar_11
♦202
4888715
Category: unknown
1~ 7 months agoopened---Porto
2~ 6 months agoclosedpehar_11
♦202
4888713
Category: unknown
1~ 7 months agoopened---Zelena
2~ 6 months agoclosedpehar_11
♦202
4888754
Category: unknown
1~ 7 months agoopened---Zastave 3 kom
2~ 6 months agoclosedpehar_11
♦202
4888688
Category: unknown
1~ 7 months agoopened---Ljudevita Gaja
2~ 7 months agoclosedpehar_11
♦202
4890431
Category: unknown
1~ 7 months agoopened---Uspornik
2~ 7 months agoclosedpehar_11
♦202
4890430
Category: unknown
1~ 7 months agoopened---Uspornik
2~ 7 months agoclosedpehar_11
♦202
4890429
Category: unknown
1~ 7 months agoopened---Uspornik
2~ 7 months agoclosedpehar_11
♦202
4890428
Category: unknown
1~ 7 months agoopened---Uspornik
2~ 7 months agoclosedpehar_11
♦202
4887065
Category: unknown
1~ 7 months agoopened---Učenička
2~ 7 months agoclosedpehar_11
♦202
4889906
Category: unknown
1~ 7 months agoopened---The renovation of this tunnel will soon be completed. It will be open again for all traffic in mid-september (according to the company Bina Istra).
2~ 7 months agoclosedpehar_11
♦202
The opening date has been edited according to data provided by Bina-Istra.
4887053
Category: unknown
1~ 7 months agoopened---Ulica Matije Gupca
2~ 7 months agoclosedpehar_11
♦202
4887057
Category: unknown
1~ 7 months agoopened---Dolac
2~ 7 months agoclosedpehar_11
♦202
4888466
Category: unknown
1~ 7 months agoopened---Vrtlarska
2~ 7 months agoclosedpehar_11
♦202
4887068
Category: unknown
1~ 7 months agoopened---Petra Preradovića
2~ 7 months agoclosedpehar_11
♦202
29132121~ 4 years agoopened---Apartments Kate Murter
2~ 1 year agocommentedpehar_11
♦202
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 7 months agoclosedpehar_11
♦202
11.7.2025. Changes made The search for accommodation facilities established the existence of apartment accommodation at the location in question. The accommodation has been corrected and added to the map. Changeset: https://www.openstreetmap.org/changeset/168788274
24936081~ 5 years agoopenedMamutinka
♦4,602
#Mapy.cz user reports: č.p. 20
2~ 1 year agocommentedpehar_11
♦202
13.12.2024. Please provide additional information.
3~ 7 months agoclosedpehar_11
♦202
11.7.2025. Note closed due to lack of information
27517431~ 4 years agoopenedPan Perníček
♦13,671
Forwarding anonymous report from #Mapy.cz user, please verify: There's a beacon.
2~ 1 year agocommentedpehar_11
♦202
13.11.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 7 months agoclosedpehar_11
♦202
11.7.2025. No changes made Subsequent verification of the maritime and land infrastructure confirmed the existence of a green lighthouse in the proposed area. A verification of spatial data showed that a lighthouse already exists on the attached pond. Furthermore, no changes were made to the map in that area. Beacon information: https://www.openstreetmap.org/node/486087316
27459211~ 4 years agoopenedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "Beach bar FJAKA. Tel.:05093275107 "
2~ 9 months agocommentedpehar_11
♦202
4.6.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 7 months agoclosedpehar_11
♦202
11.7.2025. No changes made Beach bar "Fjaka" is situated on the beach and is part of Autocamp Korisina. Furthermore, no changes will be made to the location in question due to the location already existing on the OSM map.
4473716
Category: unknown
1~ 1 year agoopenedpehar_11
♦202
Autobusne linije 23 (Permani — Matulji — Rijeka) i 32 (Lovran — Opatija — Rijeka) ne koriste autobusno stajalište Dječja bolnica u smjeru Rijeke. Stajalište koristi samo linija 1 (Bivio — Pećine).
2~ 8 months agoclosedpehar_11
♦202
Korigirano.
4473718
Category: unknown
1~ 1 year agoopenedpehar_11
♦202
Autobusne linije 23 (Rijeka — Matulji — Permani) i 32 (Rijeka — Opatija — Lovran) ne koriste autobusno stajalište Dječja bolnica u smjeru Opatije. Stajalište koristi samo linija 1 (Pećine — Bivio).
2~ 8 months agoclosedpehar_11
♦202
Korigirano.
4473723
Category: unknown
1~ 1 year agoopenedpehar_11
♦202
Autobusno stajalište Bazeni kantrida u smjeru Rijeke koriste autobusne linije 1 (Bivio — Pećine), 23 (Permani — Matulji — Rijeka) i 32 (Lovran — Opatija — Rijeka).
2~ 8 months agoclosedpehar_11
♦202
Korigirano.
4473721
Category: unknown
1~ 1 year agoopenedpehar_11
♦202
Autobusno stajalište Bazeni kantrida u smjeru Opatije koriste autobusne linije 1 (Pećine — Bivio), 23 (Rijeka — Matulji — Permani) i 32 (Rijeka — Opatija — Lovran).
2~ 8 months agoclosedpehar_11
♦202
Korigirano.
4804684
Category: StreetComplete
1~ 8 months agoopenednessie2010
♦117
Unable to answer "What’s the name of this stop?" – Bus Stop – https://osm.org/node/11012763013 via StreetComplete 61.1: Dobble
2~ 8 months agocommentedpehar_11
♦202
According to the open data of suburban bus stops under the jurisdiction of KD Autotrolej, the official name of the bus stop is "Gornji Marinići". More information can be found at https://data.rijeka.hr/dataset/autobusne-stanice/resource/25e4d446-2c92-420f-9c54-559bb4c8a91a. Please close this note if the issue is solved.
3~ 8 months agoclosedpehar_11
♦202
4744066
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uklanjanje privremenog kružnog raskrižja na križanju Riva/Riva Boduli/Ilica Ignazia Henckea/Ulica Ivana Zajca te uspostava redovnog režima prometa gdje je Ulica Ignazia Henckea u punom dvosmjernom profilu ulice.
2~ 8 months agocommentedalessandrocarmeli
♦769
quindi i vechi lavori sono rimossi?, verifica se le linee AT sono identiche, grazie.
3~ 8 months agocommentedpehar_11
♦202
The roundabout at the Riva/Riva Boduli/Ignazia Henckea Street/Ivana Zajca Street location has been removed, and a one-way traffic regime has been established in the eastbound direction with 4 functional traffic lanes in the same direction. Public transport lines need to be adjusted after the roundabout is removed.
4~ 8 months agoclosedpehar_11
♦202
The roundabout at the Riva/Riva Boduli/Ignazia Henckea Street/Ivana Zajca Street location has been removed. Please note that some relations have been removed and they require additional edits.
4807375
Category: unknown
1~ 8 months agoopened---This restaurant is permanently closed since the year 2023.
2~ 8 months agoclosedpehar_11
♦202
The restaurant at this location has been removed. Changeset: https://www.openstreetmap.org/changeset/167670449
4801413
Category: unknown
1~ 8 months agoopened---Re-opening of the old tunnel - quote: "in the middle of summer and the tourist season" is just a fairy tale of the user pehar_11. He does not mention any sources. Nobody should believe this false info. Truth is: Completion in autumn or late 2025.
2~ 8 months agocommentedpehar_11
♦202
According to the information received from Bina-Istra, the concessionaire for the Istrian Y, via a phone call and an official e-mail address available on the company's website, the following written statement was forwarded: "Due to intensive renovation work on the tunnel tube under renovation, we are unable to provide information on the date or approximate period for opening the tunnel tube to traffic." Initial information received from Bina-Istra after the launch of the new tunnel tube predicted the opening of both tunnel tubes by the middle or end of the current tourist season, but due to the extensive renovation of the pavement structure and tunnel formwork, the dynamics of the works vary depending on the stage of renovation and works. If you have information that is reliable and accurate and is not from unverified media sources, please submit it here in the form of a link, so that it can be verified. All communication and explanations regarding the progress of the works in the Učka tunnel, as well as the possible openings and dynamics of the works, are communicated exclusively through official channels to ensure the accuracy and reliability of the entered data. In the future, please write all comments on this subject in this note to avoid unnecessary accumulation of notes in this area. Additionally, please refrain from calling out authors or editors from this area. Once again, if you have different and verified information, please publish it publicly or provide it in private messages.
3~ 8 months agoclosedpehar_11
♦202
4798270
Category: unknown
1~ 8 months agoopenedatt
♦49
Add stairs
2~ 8 months agocommentedpehar_11
♦202
Stairs have been added to the location in question. Please review the changes and close this note. https://www.openstreetmap.org/changeset/167465058
3~ 8 months agoclosedpehar_11
♦202
4797440
Category: unknown
1~ 8 months agoopened---This tunnel will NOT already be re-opened in July because its refurbishment will only be completed in the last quarter of year 2025.
2~ 8 months agocommentedpehar_11
♦202
According to Bina-Istra, the concessionaire for the Istrian Y, there is currently no predetermined date for the opening of the southern tunnel tube, which is presently undergoing extensive pavement and technical renovation. Sources claim that the completion of the works is expected "in the middle of summer and the tourist season". Consequently, without an exact or approximate opening date, the current date remains in force and will be changed after its expiration. In the meantime, a request has been sent to the road manager to obtain a statement, which will provide accurate and reliable information.
3~ 8 months agoclosedpehar_11
♦202
Switched to: https://www.openstreetmap.org/note/4801413
4632552
Category: OsmAnd
1~ 1 year agoopenedYukiCRO
♦20
Dodat nešto #OsmAnd
2~ 1 year agocommentedYukiCRO
♦20
Sve i svačega ima ovdje pa bi trebalo nadodati.
3~ 8 months agoclosedalessandrocarmeli
♦769
navedite što dodati umjesto otvaranja nasumičnih bilješki, hvala FI
4~ 8 months agoreopenedpehar_11
♦202
4646602
Category: unknown
1~ 1 year agoopened---Here is a new petrol station of the company INA.
2~ 1 year agocommentedronaldp85
♦84
Silić je najavio i otvaranje Odmarališta Kvarner 20. ožujka, u suradnji s INA-om. Objekt će nuditi panoramski pogled, kafić, restoran, dječje igralište i benzinsku crpku, a u budućnosti se planira i postavljanje električne punionice. Silić also announced the opening of the Kvarner Resort on March 20, in collaboration with INA. The facility will offer panoramic views, a café, a restaurant, a children's playground and a gas station, with plans to install an electric charging station in the future.
3~ 1 year agocommentedronaldp85
♦84
https://www.poslovni.hr/hrvatska/evo-kada-zavrsava-obnova-stare-cijevi-tunela-ucka-na-gradilistu-je-vise-od-150-radnika-rade-u-tri-smjene-4474518
4~ 1 year agocommentedpehar_11
♦202
Objekt INA-Kvarner upisan je na spomenutoj lokaciji na internetskim stranicama INA-e. Kako bi ista bila upisana na OSM, molim povratni podatak ukoliko je PUO Kvarner otvoreno za sva vozila. Sadržaji PUO Kvarner idalje nisu definirani i upisani na OSM podlogu. Isti će biti provjereni i upisani u potpunosti nakon otvaranja PUO Kvarner u cjelosti.
5~ 11 months agocommentedpehar_11
♦202
Ucrtan je objekt INA - odmorište Kvarner. Lokacija nije precizna. Predviđeno otvaranje benzinske postaje je 20. ožujka 2025. Točna pozicija biti će definirana nakon dostupnog ortofota i puštanja u promet odmorišta Kvarner za sva vozila.
6~ 10 months agocommentedJaffaKetchup
♦11
I've added what I can for now - the petrol station forecourt and surrounding retail area still needs mapping, but that might be easier to do once fully open. I've added the future roads and parking areas, based on some official documentation and what I can see is complete/not complete from some news report photos etc. Once fully opened, I believe they will remove the easternmost 'loop', and reverse the direction of the current lowermost road on the other side of the easternmost parking and path. It will then be a split design like the one at Rebri - although I don't know how this factors in the local traffic.
7~ 10 months agocommentedpehar_11
♦202
Thanks for helping out. I'll personally visit the PUO Kvarner area once it's open and make any necessary changes. According to Bina-Istra, the rest area will only be opened after the Učka–Matulji section of the A8 is fully open to all traffic.
8~ 9 months agoclosedalessandrocarmeli
♦769
added
9~ 9 months agoreopenedJaffaKetchup
♦11
10~ 9 months agocommentedJaffaKetchup
♦11
Hey alessandrocarmeli, I think we're still waiting for a ground survey here, I can't see if you've added any info?
11~ 8 months agocommentedalessandrocarmeli
♦769
dipende se la stazione è stata aperta del tutto (ways) o solo l'area della stazione di servizio
12~ 8 months agocommentedpehar_11
♦202
Please note that the Rest area Kvarner is not functioning at its full capacity, except for the INA gas station, which is currently operational 24/7. The rest area will be open at its full capacity (including playground areas and other services) after the construction between the tunnel Učka and the exit Matulji-Opatija is completed.
4585430
Category: unknown
1~ 1 year agoopened---Z 6085 has a length of 1.1km only according to 2024 route log https://narodne-novine.nn.hr/clanci/sluzbeni/2024_07_86_1514.html (it was 1.5km long in the past). Thus, we should truncate 6085
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 9 months agocommentedpehar_11
♦202
4.6.2025. Report denied. Unable to verify provided infomation. This note remains open and unsolved.
4754276
Category: unknown
1~ 9 months agoopened---This restaurant is permanently closed since the year 2023.
2~ 9 months agocommentedpehar_11
♦202
27.5.2025. Note solved The restaurant at this location has been marked as out of service and removed. Please close this note or reply if further action is needed.
3~ 9 months agoclosedpehar_11
♦202
4.6.2025. Note closed and solved.
4551172
Category: unknown
1~ 1 year agoopenedKookykooky
♦673
Forwarding anonymous report from #mapycz user, please verify: "No go through, private property" thank you
2~ 9 months agocommentedpehar_11
♦202
4.6.2025. Note under review.
4756797
Category: unknown
1~ 9 months agoopened--- Tunnel
2~ 9 months agoclosedpehar_11
♦202
Tunnel Mala Kapela is already at this location.
4756798
Category: unknown
1~ 9 months agoopened---Tunnel
2~ 9 months agoclosedpehar_11
♦202
Tunnel Brinje is already at this location.
4756801
Category: unknown
1~ 9 months agoopened---tunnel
2~ 9 months agoclosedpehar_11
♦202
Tunnel Brezik is already at this location.
4756802
Category: unknown
1~ 9 months agoopened---tunnel
2~ 9 months agoclosedpehar_11
♦202
Tunnel Plasina is already at this location.
4756803
Category: unknown
1~ 9 months agoopened---tunnel
2~ 9 months agoclosedpehar_11
♦202
Tunnel Grič is already at this location.
4756806
Category: unknown
1~ 9 months agoopened---tunnel
2~ 9 months agoclosedpehar_11
♦202
Tunnel Sveti Rok is already at this location.
4744108
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Premještanje početnog stajališta za linije 1A, 5 i 32 za smjer zapad na autobusno stajalište Jelačićev trg nakon obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
4744080
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Jelačićev trg u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
4744078
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Palazzo Modello u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
4744101
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Riječki neboder u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
4744098
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Trg Republike Hrvatske u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
4744075
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Riva u smjeru istok nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
4744087
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Ukidanje autobusnog stajališta Palazzo Modello u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
Uklonjeno.
4744091
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Ukidanje autobusnog stajališta Palazzo Modello u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
Uklonjeno.
4744102
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Ukidanje autobusnog stajališta Jadrolinija u smjeru zapad nakon završnih radova obnove cestovne signalizacije.
2~ 9 months agoclosedpehar_11
♦202
Uklonjeno
4744074
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava redovnog režima prometa gdje je Ulica Riva u punom jednosmernom profilu ulice za smjer istok. Vozila iz smjera Fiumare kreću se redovno Scarpinom ulicom, Adamićevom ulicom i Trpimirovom ulicom za smjer zapad.
2~ 10 months agocommentedpehar_11
♦202
Izmijenjen režim.
3~ 9 months agoclosedpehar_11
♦202
4743292
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. U promet se stavljaju Scarpina ulica, Adamićeva ulica, Trpimirova ulica te privozi Ciottina ulica, Zadarska ulica, Splitska ulica, Zanonova ulica i Riva Boduli nakon završetka iscrtavanja horizontalne signalizacije. Pješački prijelazi, otoci te semafori i područja za pješake ostaju nepromijenjena. Pješačko područje trga 111. brigade otvoreno je za pješake. U funkciju se stavljaju autobusna stajališta Palazzo Modello, Trg Republike Hrvatske, Riječki neboder i Riva. Autobusni terminal Jelačićev trg od sada koriste linije 1A, 5 i 32.
2~ 10 months agocommentedpehar_11
♦202
Izmijenjen režim.
3~ 9 months agoclosedpehar_11
♦202
4744111
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uklanjanje privremene regulacije prometa na križanju Trpimirova ulica/Žabica/Krešimirova ulica za smjer zapad, uspostava zelenog otoka u zoni autobusnog kolodvora Žabica te vraćanje redovnog kapaciteta autobusnog kolodvora Žabica na redovni broj perona.
2~ 10 months agocommentedpehar_11
♦202
Izmijenjen režim.
3~ 9 months agoclosedpehar_11
♦202
4726414
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Kamera za kontrolu brzine (lokacije kamere i zona kontrole nepoznata)
4722919
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Kamera za kontrolu brzine kretanja (Ž5047, poddionica 02, km 3+554)
2~ 10 months agoclosedpehar_11
♦202
4722928
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Kamera za kontrolu brzine kretanja (D8, poddionica 02, km 11+393)
2~ 10 months agoclosedpehar_11
♦202
4722346
Category: unknown
1~ 10 months agoopenedpehar_11
♦202
Kamera za kontrolu brzine kretanja (Ž5047, poddionica 03, km 0+367)
2~ 10 months agoclosedpehar_11
♦202
4666715
Category: unknown
1~ 11 months agoopened---The mapper "pehar_11" has already been informed here in winter that the old tube of the tunnel will NOT open in May 2025. But he did not believe it and therefore did not correct his wrong opening date. On 4 March, 2025 Bina Istra now has also officially confirmed that this tube will open in the middle of summer only (sredine ljeta 2025).
2~ 11 months agoclosedpehar_11
♦202
36959811~ 2 years agoopenedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "playground"
2~ 11 months agocommentedpehar_11
♦202
12.3.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 11 months agocommentedpehar_11
♦202
14.3.2025. Report accepted: Changes applied A playground area has been added to this location. Please close this note or provide additional information.
4~ 5 months agoclosedAPneunzehn74
♦2,025
is in the OSM data
40581481~ 2 years agoopenedMatyjaceForwarding anonymous report from #mapycz user, please verify: "HEALTH CENTER SENJ",
2~ 11 months agocommentedpehar_11
♦202
12.3.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 11 months agocommentedpehar_11
♦202
14.3.2025. Report accepted: Changes applied "Dom zdravlja Senj" / "Health center Senj" (Stara cesta 43, 53270 Senj) has been added to this location. Please close this note or provide additional information.
4~ 2 months agoclosedMatija Nalis
♦16,141
#alreadyfixed
4591653
Category: unknown
1~ 1 year agoopenedKookykooky
♦673
Forwarding anonymous report from #mapycz user, please verify: "there is a nudist beach here" thank you
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
33655881~ 3 years agoopenedPan Perníček
♦13,671
Forwarding anonymous report from #Mapy.cz user, please verify: There are three historic cannons.
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
37338211~ 2 years agoopenedfukejs
♦249
#Mapy.cz user reported: Denkmal (Gat Svetog Nikole) Der Leuchtturm ist am Steg links!!! please verify
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
39315291~ 2 years agoopenedPan Perníček
♦13,671
Forwarding anonymous report from #Mapycz user, please verify: Public shower is out of order. https://www.openstreetmap.org/node/9871191865
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 6 months agoclosedModrulj
♦12
Verified and map updated
32385631~ 3 years agoopenedPan Perníček
♦13,671
Forwarding anonymous report from #Mapy.cz user, please verify: The bakery is currently closed. https://www.openstreetmap.org/node/4271273144
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
40630711~ 2 years agoopenedMatyjaceForwarding anonymous report from #mapycz user, please verify: "apartments"
2~ 11 months agocommentedpehar_11
♦202
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
3~ 2 months agoclosedMatija Nalis
♦16,141
#added
4594764
Category: unknown
1~ 1 year agoopenedMatija Nalis
♦16,141
#surveyme tu negdje Ha Ha muzej (https://www.haha.house/)
2~ 11 months agoclosedpehar_11
♦202
Dodano.
4652351
Category: unknown
1~ 1 year agoopened---The mapper "pehar11" has already been informed here in winter that the old tube of the tunnel will NOT open in May 2025. But he did not believe it and did NOT correct the wrong opening date. Now Bina Istra has also officially confirmed that this tube will open in the middle of summer only (sredine ljeta).
2~ 11 months agocommentedpehar_11
♦202
The official opening date of Učka tunnel (A8) has been changed according to the official information provided by Bina Istra. All changes made on major motorway and highway relations are updated after the official information has been released to ensure that data is always up-to-date and correct. In case of any changes in the tunnel opening date, the current data will be edited after Bina Istra makes the official statement. You may enter any additional information below. Since the data was updated, please close this note if the issue is resolved. Please refrain from naming out loud mappers working in this area. For any additional information, you may reply here or reach me via DMs.
3~ 11 months agocommentedpehar_11
♦202
For additional information regarding this note, planned opening date for Učka tunnel has been set to 2025-05 and remains the same at the time. The last edit/data check on this tunnel and its date was at 2024-11-26. This information is also available on the map itself.
4~ 11 months agoclosedpehar_11
♦202
4474535
Category: Spam
1~ 1 year agoopenedpehar_11
♦202
Zbog produljenja radova u Adamićevoj ulici (i nastavka režima dvosmjernog prometa ulicom Riva) potrebno je preusmjeriti linije javnog gradskog prijevoza na relaciji Fiumara - Jelačićev trg - Veslarska - Riva (dvosmjerno) i dalje redovim trasama (za gradske linije) i relaciji Delta (autobusni terminal) - Šet. A.K. Miošića - D404 (Ulica Hinka Bačića) - Riva (dvosmjerno) i dalje redovnim trasama u smjeru Srdoči/Kastav/Permani/Lovran. Gradske linije koriste autobusna stajališta "Palazzo Modello" i "Jadrolinija" a prigradske linije stajališta "Ul.Ivana Zajca" i "Jadrolinija". Prigradske linije u smjeru Srdoči/Kastav/Permani/Lovran ne koriste autobusno stajalište "Fiumara pr". a gradske linije ne koriste stajalište "Riva" u smjeru Trsat/Kostrena/Pećine (zamjensko stajalište za sve gradske linije je autobusno stajalište "Žabica" i "Tržnica").
2~ 11 months agoclosedpehar_11
♦202
// Riješeno //