4789799
Category: unknown
12025-06-04 13:14openedpehar_11
♦197
Novoizgrađeno kružno raskrižje u obodnoj zoni čvora Škurinje (A7) i Osječke ulice je pušteno u promet, iako su u tijeku radovi. Zbog formiranja novig raskrižja izmjenjene su pozicije ulazno-izlaznih krakova čvora Škurinje na način da su direktno spojeni sa uključnim i isključnim privizom silazno-ulazne rampe čvora Škurinje. Potrebno korigirati raskrižje i ostale sadržaje u zoni zahvata. A newly built roundabout intersection in the peripheral zone of the Škurinje node (A7) and Osječka Street has been opened to traffic, although work is still in progress. Due to the formation of the new intersection, the positions of the entrance-exit branches of the Škurinje node have been changed so that they are directly connected with the on-ramp and off-ramp merge of the Škurinje node. It is necessary to correct the intersection and other contents in the affected area.
22025-06-06 19:34commentedpehar_11
♦197
Uspostavljen redovam režim prometa na južnom kružnom raksrižju čvora Škurinje (D403/A7). Korekcija u tijeku.
32025-06-07 00:05commentedalessandrocarmeli
♦769
Hvala na ispravcima, ali ako su otvoreni ispravni otvori i zatvaranja cesta s raznim relacijama, hvala
42025-06-07 00:37commentedpehar_11
♦197
The D403/A7/Osječka ulica roundabout has been put into a temporary regime, with only the southern intersection in operation, with active approaches from the D403 direction towards the Škurinje junction (input arm), from the Zagreb direction towards Škurinje (exit lane), while the northern roundabout is under construction and is not in the regular traffic regime. Traffic signals at this location are out of use. After the establishment of the regular traffic regime on the entire Škurinje junction, which includes both roundabouts, a correction of routes and connections in the same area is required. Given the active duration of the works, the routes and connections have not been restored to their original state. The correction of the connections of the input-output arms of the Škurinje junction is underway as part of the project to update the data of the Rijeka bypass.
52025-07-04 11:49commentedpehar_11
♦197
Uređeno je kružno raskrižje u punom obliku uz korekciju relacije D403 sa uključno-isključnim krakovima. Podaci destinacija na krakovima biti će ažurirani nakon uspostave vertikalne signalizacije.
62025-07-11 09:51commentedpehar_11
♦197
U jutarnjim satima petka, 11.7.2025. godine u promet je u potpunosti pušteno kružno raskrižje sa privozima iz svih smjerova. Podaci destinacija na krakovima biti će ažurirani nakon obilaska terena i dokumentiranja vertikalne signalizacije.
72025-09-20 19:17commentedpehar_11
♦197
Djelomično je ažurirana signalizacija na ulazno-izlaznim krakovima i privozima. Zbog nedostataka podataka, izmjene će u potpunosti biti završene nakon obilaska kružnog raskrižja.
82025-10-06 12:19closedpehar_11
♦197
4981438
Category: Unknown
12025-09-27 12:34opened---Here is a connecting road which is a turn around option via the roundabouts to the INA petrol station, parking facility and A8 back to Matulji. Why has it been deleted here recently ? It has always existed and was always open for all traffic.
22025-10-06 08:54closedpehar_11
♦197
4975347
Category: Unknown
12025-09-22 19:51openedpehar_11
♦197
Uspostavljeno je kružno raskrižje na D8 na križanju Ljubljanska cesta/Pavlovac u oba smjera. Autobusno stajalište "Pavlovac" za linije 23 i 34 izmješteno je prije kružnog raskrižja iz smjera Rijeke u smjeru Matulja, te autobusna linija 34 ne koristi istoimeno stajalište zbog promjene lokacije. Ulica "Pavlovac" nakon uspostave kružnog rakrižja ima dva privoza, ulazni krak iz smjera Ljubljanske ceste u smjeru Pavlovca i izlazni krak iz smjera Pavlovca u smjeru Ljubljanske ceste. Izmjenjeni su pješački prijelazi na način da se isti od sada nalaze na svakom privozu, dok je u središtu i sa južne strane Ljubljanske ceste iz smjera Matulja u smjeru Rijeke projektirano zelenilo i zelene površine. Molim uspostavu kružnog raskrižja i korekciju autobsnih relacija za linije 23 i 34 u oba smjera.A roundabout has been established on D8 at the intersection of Ljubljanska cesta/Pavlovac in both directions. The bus stop "Pavlovac" for lines 23 and 34 has been relocated before the roundabout from the direction of Rijeka towards Matulji, and bus line 34 no longer uses the same-named stop due to the change in location. Pavlovac street after the establishment of the roundabout has two accesses, an entrance arm from Ljubljanska cesta towards Pavlovac and an exit arm from Pavlovac towards Ljubljanska cesta. Pedestrian crossings have been modified so that they are now located on each access, while greenery and green areas have been designed in the center and on the southern side of Ljubljanska cesta from Matulji towards Rijeka. I request the establishment of a roundabout and correction of bus routes for lines 23 and 34 in both directions.
22025-10-03 08:12closedgeorgandreas
♦58
4952689
Category: Unknown
12025-09-08 13:32opened---The beginning of this path is overgrown completely, we couldnt find any way to get to it, we didn't even see where it was through the trees and shrubbery. I don't know how the other end looks, but it's definitely not accessible from the top currently
22025-09-20 19:37commentedpehar_11
♦197
A note about the trail being inaccessible due to overgrown vegetation has been added to the trail. Since the trail exists and its condition further along is unknown, it remains marked on the map. If you have additional information, please add it in a comment so the map can be updated; otherwise, the note will be considered as resolved.
32025-09-20 19:43closedpehar_11
♦197
4802347
Category: StreetComplete
12025-06-12 11:18openednessie2010
♦117
In context of overlay "Things" – Kosić (Bus Stop) – https://osm.org/node/6784997188 via StreetComplete 61.1: Busstop must be next to the street
22025-09-20 19:42closedpehar_11
♦197
4968732
Category: Unknown
12025-09-19 11:35opened---Zbog izvođenja radova izvanrednog održavanja na mostu Dobra IV na dionici autoceste A6, doći će do zatvaranja za prometa kraka čvora Vrbovsko kojim se prometuje iz naselja Vrbovsko u smjeru Rijeke. Predviđeno trajanje radova je od 18.09.2025. godine do 24.10.2025. godine. Za vrijeme trajanja radova promet će biti preusmjeren na obilazni pravac kako slijedi: naselje Vrbovsko i okolica – DC 42 – DC 3 – ŽC 5034 – čvor Ravna Gora (A6).Due to the execution of extraordinary maintenance works on the Dobra IV bridge on the A6 highway section, there will be a closure for traffic of the Vrbovsko node branch which is used for traffic from the Vrbovsko settlement towards Rijeka. The expected duration of the works is from September 18th, 2025 to October 24th, 2025. During the duration of the works, traffic will be redirected to a detour route as follows: Vrbovsko settlement and surroundings – DC 42 – DC 3 – ŽC 5034 – Ravna Gora node (A6).
22025-09-20 19:40closedpehar_11
♦197
Izlazni krak čvora Vrbovsko (16+700 km) na autocesti A6 iz smjera Vrbovskog u smjeru Rijeke je privremeno zatvoren, stoga nema potrebe za trajnim zatvaranjem istoga.
4912552
Category: Organicmaps
12025-08-16 09:49openedmulc
♦1
"The leftovers of an old house on top of the hill, no roof, just remainders of the walls. Walls seem old, likely older then 70 years, but maybe just ruins would be a better label" OSM snapshot date: 2025-07-08T15:45:36Z POI has no name POI types: historic-ruins #organicmaps android
22025-08-24 17:05commentedpehar_11
♦197
Building has been marked as abandoned and ruined. Please close this note or reply if further fixes are required.
32025-09-20 19:27closedpehar_11
♦197
4921477
Category: Spam
12025-08-21 10:23opened---Potpisanim ugovorom između Općine Matulji, Hrvatskih autocesta i Bina-Istra, predviđa se izmještanje i izgradnja novog vijadukta u Ulici Branka Laginje na način da se ukloni postojeći prijelaz te se izmjesti prema zapadnom dijelu trase autoceste u smjeru tunela Učka, kako bi se omogućio prijelaz vozila za vrijeme izgradnje sjevernog kolnika između tunela Učka i izlaza Matulji-Opatija u smjeru Kanfanara. Postojeći cestovni prijelaz sa dvije prometne trake se uklanja s obzirom da njegov profil širine i visine ne odgovara parametrima za potrebu izgradnje novog kolnika. Na predmetnoj lokaciji planira se i izgradnja nerazvrstane ceste od Ulice Branka Laginje do Jankovićeve ceste, kao trajna pristupna cesta za lokalno stanovništvo s obzirom na prostorne i tehničke mogućnosti. Poveznica: https://www.novilist.hr/rijeka-regija/opatija/opcina-matulji-potpisala-nove-sporazume-s-hac-om-i-bina-istrom-evo-sto-je-dogovoreno/
22025-09-07 17:46commentedpehar_11
♦197
Added but awaiting further information.
32025-09-20 19:27closedpehar_11
♦197
4965728
Category: Unknown
12025-09-17 09:21opened---Zabrana prometa za sva vozila zbog radova na autocesti A6 na spojnom kraku čvora Orehovica (sa autoceste A7 na autocestu A6) na kolniku u smjeru Zagreba. Promet je preusmjeren i vodi se obilaznim pravcima: Za smjer Zagreb (od strane Krka/Križišća) obilazni pravac je: čvor Sv. Kuzam (A7) – DC 40 – čvor Čavle (A6). Obilazni pravac za vozila koja se kreću sa DC 404 za smjer Zagreb je: čvor Rijeka istok (Draga/A7) – čvor Sv. Kuzam (A7) – DC 40 – čvor Čavle (A6). Predviđeno trajanje radova je do 15.10.2025. godine“. Molimo korisnike za strpljenje i oprez.Traffic ban for all vehicles due to works on the A6 highway at the Orehovica junction connector (from A7 highway to A6 highway) in the direction of Zagreb. Traffic is redirected and runs through detour routes: For the direction of Zagreb (from Krka/Križišća side), the detour route is: Sv. Kuzam junction (A7) - DC 40 - Čavle junction (A6). The detour route for vehicles coming from DC 404 for the direction of Zagreb is: Rijeka East junction (Draga/A7) - Sv. Kuzam junction (A7) - DC 40 - Čavle junction (A6). The expected duration of the works is until October 15, 2025. We ask users for patience and caution.
22025-09-20 19:27closedpehar_11
♦197
Izlazni krak čvora Orehovica (81+300 km) na autocesti A6 iz smjera Križišća u smjeru Zagreba je privremeno zatvoren, stoga nema potrebe za trajnim zatvaranjem istoga.
4893195
Category: StreetComplete
12025-08-05 10:42openedkozlorf
♦397
Parking only for guests of Hotel Paris on this side of a road via StreetComplete 61.2
22025-09-18 20:26commentedMilivojTočno. U Ulici Vladimira Nazora sa gornje i donjeg dijela ceste su parkinzi. Sa donje strane ceste samo za goste hotela Paris.
32025-09-20 19:15commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:15closedpehar_11
♦197
Changes made.
4893194
Category: StreetComplete
12025-08-05 10:41openedkozlorf
♦397
Public parking on this side of a road via StreetComplete 61.2
22025-08-05 17:58commentedkozlorf
♦397
Paid parking places, municipal zone-0
32025-09-20 19:15commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:15closedpehar_11
♦197
Changes made.
4894113
Category: StreetComplete
12025-08-05 18:52openedkozlorf
♦397
4 public paid parking places along this side of the street, municipal zone-0 via StreetComplete 61.2
22025-09-20 19:00commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
32025-09-20 19:15closedpehar_11
♦197
Changes made.
4894006
Category: StreetComplete
12025-08-05 17:45openedkozlorf
♦397
4 public parking places (paid, zone 0) via StreetComplete 61.2 Attached photo(s): https://streetcomplete.app/p/296122.jpg
22025-09-18 20:29commentedMilivojTočno!
32025-09-20 18:59commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:15closedpehar_11
♦197
Changes made.
4894121
Category: StreetComplete
12025-08-05 18:56openedkozlorf
♦397
Public parking places all along this side of the street, municipal zone-0 via StreetComplete 61.2
22025-09-18 20:28commentedMilivojTočno!
32025-09-20 19:00commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:14closedpehar_11
♦197
Changes made.
4894104
Category: unknown
12025-08-05 18:45openedkozlorf
♦397
Public paid parking, municipal zone-0
22025-09-18 20:29commentedMilivojGotovo isključivo za goste hotela Imperijal
32025-09-20 19:00commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:14closedpehar_11
♦197
Changes made.
4894099
Category: StreetComplete
12025-08-05 18:42openedkozlorf
♦397
10 public parking places along this side of the road, municipal zone-0 via StreetComplete 61.2
22025-09-18 20:27commentedMilivojTočno.
32025-09-20 19:00commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:14closedpehar_11
♦197
Changes made.
4894080
Category: StreetComplete
12025-08-05 18:30openedkozlorf
♦397
Paid public parking places all along this side of the road, municipal zone-0 via StreetComplete 61.2
22025-09-18 20:30commentedMilivojTočno!
32025-09-20 19:00commentedpehar_11
♦197
The data is currently under review and will be updated once its accuracy is confirmed.
42025-09-20 19:14closedpehar_11
♦197
Changes made.
4968036
Category: Unknown
12025-09-18 20:23openedMilivojOpatija, Garaža Gorovo. 1) Krivo su ucrtani ulasci u garažu: iz Ulice M.Tita u Ulicu Jurja Dobrile ulazi se s donje strane, a takav je i ulaz i u garažu (a ne kako je to ucrtano u karti). Sa gornje strane (na križanju ulice Jurja Dobrile i Drage Gervea se NE ulazi u garažu već izlazi). 2) Garaža ima i dio na koji se ulazi i izlazi iz Ulice Drage Gervaisa. 3) Ulica Vladimira Nazora je ostala jednosmjerna, ali u obratnom smjeru (a ne kako je pokazano sada na karti).
22025-09-20 18:59commentedpehar_11
♦197
Podaci su u provjeri i bit će ažurirani nakon potvrde točnosti.
32025-09-22 10:15closedMilivoj
4941623
Category: Unknown
12025-09-01 20:28opened---The opening date mentioned by user Pehar_11 for this round-about is outdated. The new real date for completion will be on 24 september.
22025-09-07 17:45closedpehar_11
♦197
The expected opening date of the roundabout on D3 Ljubljanska cesta/Pavlovac has been corrected to September 24th. Thank you for providing this information.
4921483
Category: unknown
12025-08-21 10:26opened---Na predmetnoj lokaciji se nalazi P+R parkiralište za korisnike međugradske željeznice između Šapjana i Matulja. Parlirakište je osvijetljeno i bez naplate, a materijal podloge je krupan šljunak. Pristup parkiralištu moguć se kod ulice Ivana Matetića Ronjgova ili kod Ceste za Osojnaki. Karakteristike ulaza ne omogućuju parkiranje teretnih vozila i autobusa. Prodaja karata vrši se u vlaku kod osoblja ili putem HŽPP-a.At the subject location there is a P+R parking lot for users of the intercity railway between Šapjani and Matulji. The parking lot is lit and free of charge, and the substrate material is coarse gravel. Access to the parking lot is possible from Ivana Matetića Ronjgova Street or from the road to Osojnaki. The characteristics of the entrance do not allow parking of freight vehicles and buses. Ticket sales are carried out on the train by staff or through HŽPP.
22025-09-03 20:24closedpehar_11
♦197
4921401
Category: unknown
12025-08-21 09:34opened---Na službenim stranicama Bina-Istra čvor se vodi pod nazivom "Lupoglav".On the official website of Bina-Istra, the node is referred to as "Lupoglav".
22025-08-22 14:51closedpehar_11
♦197
MINISTARSTVO MORA, PROMETA I INFRASTRUKTURE 11 Na temelju članka 7. stavka 2. Zakona o cestama (»Narodne novine«, broj 84/11, 22/13, 54/13, 148/13, 92/14 i 110/19), ministar mora, prometa i infrastrukture donosi ODLUKU O OZNAČAVANJU AUTOCESTA Članak 1. Ovom se Odlukom uređuje označavanje autocesta, njihove stacionaže, brojeva izlaza i prometnih čvorišta te naziva izlaza, prometnih čvorišta i odmorišta.
4921399
Category: unknown
12025-08-21 09:34opened---Na službenim stranicama Bina-Istra čvor se vodi pod nazivom "Vranja".On the official website of Bina-Istra, the node is referred to as "Vranja".
22025-08-22 14:51closedpehar_11
♦197
MINISTARSTVO MORA, PROMETA I INFRASTRUKTURE 11 Na temelju članka 7. stavka 2. Zakona o cestama (»Narodne novine«, broj 84/11, 22/13, 54/13, 148/13, 92/14 i 110/19), ministar mora, prometa i infrastrukture donosi ODLUKU O OZNAČAVANJU AUTOCESTA Članak 1. Ovom se Odlukom uređuje označavanje autocesta, njihove stacionaže, brojeva izlaza i prometnih čvorišta te naziva izlaza, prometnih čvorišta i odmorišta.
4738081
Category: StreetComplete
12025-05-02 08:27openedmnalis ALTernative
♦13,543
radovi makadam via StreetComplete_ee 61.0-beta1 Attached photo(s): https://streetcomplete.app/p/275079.jpg https://streetcomplete.app/p/275080.jpg https://streetcomplete.app/p/275081.jpg
22025-05-04 20:13commentedMatija Nalis
♦14,895
comment radi se most preko pruge
32025-08-09 07:22commentedpehar_11
♦197
Završeni radovi, redovan promet (izvor: HAK)
4881270
Category: unknown
12025-07-29 07:54opened---#mapycom our user indicates maxspeed 100 kmh
22025-08-09 07:22closedpehar_11
♦197
According to data from Hrvatske autoceste (Croatian Motorways), the speed limit on the Drežnik viaduct is set at 100 km/h, as indicated by the corresponding traffic sign; therefore, the speed has been corrected.
4891675
Category: unknown
12025-08-04 11:15opened---Extra lane here. Apparently a bus stop, but cars are parking here (around 10 places). No road sign that it's not allowed.
22025-08-09 07:14commentedpehar_11
♦197
At the attached location, there is no additional traffic lane; instead, the expansion is used as a platform for boarding and alighting passengers. According to the Road Traffic Safety Act, parking vehicles on all road surfaces where traffic is obstructed is prohibited, including bus stops - which in this case is properly marked with vertical and horizontal signage, even without a sign explicitly prohibiting stopping and parking.
32025-08-09 07:17commentedpehar_11
♦197
In the near future, all bus stations in the area of Opatija and Lovran will be subsequently checked and changed, and at places that have characteristics and possibilities, OSM tag "highway:platform" (transit platform) will be introduced.
4896367
Category: unknown
12025-08-07 00:53openedpehar_11
♦197
ParkirališteParking lot
4896366
Category: unknown
12025-08-07 00:53openedpehar_11
♦197
Kapelica na moru (u zoni 50 m)Chapel by the sea (in the 50m zone)
4896365
Category: unknown
12025-08-07 00:51openedpehar_11
♦197
MrežaNetwork
4896364
Category: unknown
12025-08-07 00:51openedpehar_11
♦197
Kamera za video-nadzorVideo surveillance cameras
4896363
Category: unknown
12025-08-07 00:51openedpehar_11
♦197
MrežaNetwork
4896362
Category: unknown
12025-08-07 00:51openedpehar_11
♦197
MrežaNetwork
4896361
Category: unknown
12025-08-07 00:50openedpehar_11
♦197
Toranj spasioca
4896360
Category: unknown
12025-08-07 00:50openedpehar_11
♦197
Samo ta vozila s dozvolomOnly vehicles with permission
4896359
Category: unknown
12025-08-07 00:49openedpehar_11
♦197
Površina za pješake // TrgPedestrian zone // Square
4896358
Category: unknown
12025-08-07 00:49openedpehar_11
♦197
Fabro
4896357
Category: unknown
12025-08-07 00:48openedpehar_11
♦197
Zona za pješakePedestrian zone
4896355
Category: unknown
12025-08-07 00:47openedpehar_11
♦197
Drukčiji oblik plaže // Materijal beton // Tuševi 2 kom // Suncobrani // Caffe bar // MrežaDifferent type of beach // Material concrete // Showers 2 pieces // Sun umbrellas // Cafe bar // Network
4888717
Category: unknown
12025-08-02 15:41opened---Photo point i ljuljačkePhotography in July
22025-08-07 00:46closedpehar_11
♦197
4888712
Category: unknown
12025-08-02 15:39opened---Joo bar
22025-08-07 00:46closedpehar_11
♦197
4888715
Category: unknown
12025-08-02 15:40opened---PortoPort
22025-08-07 00:46closedpehar_11
♦197
4888713
Category: unknown
12025-08-02 15:40opened---ZelenaGreen
22025-08-07 00:46closedpehar_11
♦197
4888754
Category: unknown
12025-08-02 15:59opened---Zastave 3 komFlags of three companies
22025-08-07 00:46closedpehar_11
♦197
4888688
Category: unknown
12025-08-02 15:33opened---Ljudevita GajaLudwig Gay
22025-08-03 15:54closedpehar_11
♦197
4890431
Category: unknown
12025-08-03 15:31opened---UspornikAccelerator
22025-08-03 15:41closedpehar_11
♦197
4890430
Category: unknown
12025-08-03 15:31opened---UspornikAccelerator
22025-08-03 15:40closedpehar_11
♦197
4890429
Category: unknown
12025-08-03 15:30opened---UspornikAccelerator
22025-08-03 15:40closedpehar_11
♦197
4890428
Category: unknown
12025-08-03 15:29opened---UspornikAccelerator
22025-08-03 15:40closedpehar_11
♦197
4887065
Category: unknown
12025-08-01 15:06opened---UčeničkaStudent
22025-08-03 15:40closedpehar_11
♦197
4889906
Category: unknown
12025-08-03 11:25opened---The renovation of this tunnel will soon be completed. It will be open again for all traffic in mid-september (according to the company Bina Istra).
22025-08-03 13:03closedpehar_11
♦197
The opening date has been edited according to data provided by Bina-Istra.
4887053
Category: unknown
12025-08-01 14:58opened---Ulica Matije GupcaMatija Gubec Street
22025-08-02 17:48closedpehar_11
♦197
4887057
Category: unknown
12025-08-01 15:00opened---Dolac
22025-08-02 17:47closedpehar_11
♦197
4888466
Category: unknown
12025-08-02 13:40opened---VrtlarskaEmbarrassing
22025-08-02 17:47closedpehar_11
♦197
4887068
Category: unknown
12025-08-01 15:08opened---Petra PreradovićaSquare of Petra Preradović
22025-08-02 17:47closedpehar_11
♦197
291321212021-10-28 09:56opened---Apartments Kate Murter
22024-12-12 23:17commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-07-11 10:26closedpehar_11
♦197
11.7.2025. Changes made The search for accommodation facilities established the existence of apartment accommodation at the location in question. The accommodation has been corrected and added to the map. Changeset: https://www.openstreetmap.org/changeset/168788274
249360812021-01-11 08:29openedMamutinka
♦4,602
#Mapy.cz user reports: č.p. 20
22024-12-12 23:15commentedpehar_11
♦197
13.12.2024. Please provide additional information.
32025-07-11 10:19closedpehar_11
♦197
11.7.2025. Note closed due to lack of information
275174312021-07-12 10:31openedPan Perníček
♦13,485
Forwarding anonymous report from #Mapy.cz user, please verify: There's a beacon.
22024-12-12 23:13commentedpehar_11
♦197
13.11.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-07-11 10:16closedpehar_11
♦197
11.7.2025. No changes made Subsequent verification of the maritime and land infrastructure confirmed the existence of a green lighthouse in the proposed area. A verification of spatial data showed that a lighthouse already exists on the attached pond. Furthermore, no changes were made to the map in that area. Beacon information: https://www.openstreetmap.org/node/486087316
274592112021-07-08 08:59openedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "Beach bar FJAKA. Tel.:05093275107 "
22025-06-04 17:08commentedpehar_11
♦197
4.6.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-07-11 10:10closedpehar_11
♦197
11.7.2025. No changes made Beach bar "Fjaka" is situated on the beach and is part of Autocamp Korisina. Furthermore, no changes will be made to the location in question due to the location already existing on the OSM map.
4473716
Category: unknown
12024-10-11 07:27openedpehar_11
♦197
Autobusne linije 23 (Permani — Matulji — Rijeka) i 32 (Lovran — Opatija — Rijeka) ne koriste autobusno stajalište Dječja bolnica u smjeru Rijeke. Stajalište koristi samo linija 1 (Bivio — Pećine).Bus lines 23 (Permani - Matulji - Rijeka) and 32 (Lovran - Opatija - Rijeka) do not use the Children's Hospital bus stop in the direction of Rijeka. The stop is used only by line 1 (Bivio - Pećine).
22025-07-04 14:21closedpehar_11
♦197
Korigirano.
4473718
Category: unknown
12024-10-11 07:28openedpehar_11
♦197
Autobusne linije 23 (Rijeka — Matulji — Permani) i 32 (Rijeka — Opatija — Lovran) ne koriste autobusno stajalište Dječja bolnica u smjeru Opatije. Stajalište koristi samo linija 1 (Pećine — Bivio).Bus lines 23 (Rijeka - Matulji - Permani) and 32 (Rijeka - Opatija - Lovran) do not use the Dječja bolnica bus stop in the direction of Opatija. The stop is used only by line 1 (Pećine - Bivio).
22025-07-04 14:21closedpehar_11
♦197
Korigirano.
4473723
Category: unknown
12024-10-11 07:34openedpehar_11
♦197
Autobusno stajalište Bazeni kantrida u smjeru Rijeke koriste autobusne linije 1 (Bivio — Pećine), 23 (Permani — Matulji — Rijeka) i 32 (Lovran — Opatija — Rijeka).The Bazeni Kantrida bus stop in the direction of Rijeka is used by bus lines 1 (Bivio - Pećine), 23 (Permani - Matulji - Rijeka) and 32 (Lovran - Opatija - Rijeka).
22025-07-04 14:21closedpehar_11
♦197
Korigirano.
4473721
Category: unknown
12024-10-11 07:31openedpehar_11
♦197
Autobusno stajalište Bazeni kantrida u smjeru Opatije koriste autobusne linije 1 (Pećine — Bivio), 23 (Rijeka — Matulji — Permani) i 32 (Rijeka — Opatija — Lovran).The Bazeni Kantrida bus stop in the direction of Opatija is used by bus lines 1 (Pećine - Bivio), 23 (Rijeka - Matulji - Permani) and 32 (Rijeka - Opatija - Lovran).
22025-07-04 14:21closedpehar_11
♦197
Korigirano.
4804684
Category: StreetComplete
12025-06-13 17:11openednessie2010
♦117
Unable to answer "What’s the name of this stop?" – Bus Stop – https://osm.org/node/11012763013 via StreetComplete 61.1: Dobble
22025-06-15 23:11commentedpehar_11
♦197
According to the open data of suburban bus stops under the jurisdiction of KD Autotrolej, the official name of the bus stop is "Gornji Marinići". More information can be found at https://data.rijeka.hr/dataset/autobusne-stanice/resource/25e4d446-2c92-420f-9c54-559bb4c8a91a. Please close this note if the issue is solved.
32025-07-02 15:54closedpehar_11
♦197
4744066
Category: unknown
12025-05-05 17:49openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uklanjanje privremenog kružnog raskrižja na križanju Riva/Riva Boduli/Ilica Ignazia Henckea/Ulica Ivana Zajca te uspostava redovnog režima prometa gdje je Ulica Ignazia Henckea u punom dvosmjernom profilu ulice.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The temporary roundabout at the intersection of Riva/Riva Boduli/Ilica Ignazia Henckea/Ivana Zajca Street will be removed and regular traffic regime will be established where Ignazia Henckea Street is in full two-way street profile.
22025-06-07 00:09commentedalessandrocarmeli
♦769
quindi i vechi lavori sono rimossi?, verifica se le linee AT sono identiche, grazie.
32025-06-07 00:31commentedpehar_11
♦197
The roundabout at the Riva/Riva Boduli/Ignazia Henckea Street/Ivana Zajca Street location has been removed, and a one-way traffic regime has been established in the eastbound direction with 4 functional traffic lanes in the same direction. Public transport lines need to be adjusted after the roundabout is removed.
42025-06-18 16:58closedpehar_11
♦197
The roundabout at the Riva/Riva Boduli/Ignazia Henckea Street/Ivana Zajca Street location has been removed. Please note that some relations have been removed and they require additional edits.
4807375
Category: unknown
12025-06-15 16:38opened---This restaurant is permanently closed since the year 2023.
22025-06-15 23:13closedpehar_11
♦197
The restaurant at this location has been removed. Changeset: https://www.openstreetmap.org/changeset/167670449
4801413
Category: unknown
12025-06-11 22:12opened---Re-opening of the old tunnel - quote: "in the middle of summer and the tourist season" is just a fairy tale of the user pehar_11. He does not mention any sources. Nobody should believe this false info. Truth is: Completion in autumn or late 2025.
22025-06-12 13:16commentedpehar_11
♦197
According to the information received from Bina-Istra, the concessionaire for the Istrian Y, via a phone call and an official e-mail address available on the company's website, the following written statement was forwarded: "Due to intensive renovation work on the tunnel tube under renovation, we are unable to provide information on the date or approximate period for opening the tunnel tube to traffic." Initial information received from Bina-Istra after the launch of the new tunnel tube predicted the opening of both tunnel tubes by the middle or end of the current tourist season, but due to the extensive renovation of the pavement structure and tunnel formwork, the dynamics of the works vary depending on the stage of renovation and works. If you have information that is reliable and accurate and is not from unverified media sources, please submit it here in the form of a link, so that it can be verified. All communication and explanations regarding the progress of the works in the Učka tunnel, as well as the possible openings and dynamics of the works, are communicated exclusively through official channels to ensure the accuracy and reliability of the entered data. In the future, please write all comments on this subject in this note to avoid unnecessary accumulation of notes in this area. Additionally, please refrain from calling out authors or editors from this area. Once again, if you have different and verified information, please publish it publicly or provide it in private messages.
32025-06-15 23:12closedpehar_11
♦197
4798270
Category: unknown
12025-06-10 05:17openedatt
♦49
Add stairs
22025-06-10 21:45commentedpehar_11
♦197
Stairs have been added to the location in question. Please review the changes and close this note. https://www.openstreetmap.org/changeset/167465058
32025-06-14 19:10closedpehar_11
♦197
4797440
Category: unknown
12025-06-09 14:20opened---This tunnel will NOT already be re-opened in July because its refurbishment will only be completed in the last quarter of year 2025.
22025-06-10 21:36commentedpehar_11
♦197
According to Bina-Istra, the concessionaire for the Istrian Y, there is currently no predetermined date for the opening of the southern tunnel tube, which is presently undergoing extensive pavement and technical renovation. Sources claim that the completion of the works is expected "in the middle of summer and the tourist season". Consequently, without an exact or approximate opening date, the current date remains in force and will be changed after its expiration. In the meantime, a request has been sent to the road manager to obtain a statement, which will provide accurate and reliable information.
32025-06-12 13:17closedpehar_11
♦197
Switched to: https://www.openstreetmap.org/note/4801413
4632552
Category: OsmAnd
12025-02-18 18:02openedYukiCRO
♦20
Dodat nešto #OsmAndAdd something
22025-02-18 18:43commentedYukiCRO
♦20
Sve i svačega ima ovdje pa bi trebalo nadodati.
32025-06-07 00:03closedalessandrocarmeli
♦769
navedite što dodati umjesto otvaranja nasumičnih bilješki, hvala FI
42025-06-07 00:45reopenedpehar_11
♦197
4533697
Category: StreetComplete
12024-11-26 13:36openedOsmwithspace
♦1,197
Here is a footway now. via StreetComplete 60.0-alpha1
22024-11-26 23:00commentedpehar_11
♦197
27.11.2024. Path added. Please close this note if the issue is solved or provide additional information.
32024-11-28 17:06closedpehar_11
♦197
42024-12-01 10:57reopenedOsmwithspace
♦1,197
52024-12-01 10:57commentedOsmwithspace
♦1,197
I think we have to wait for a new satellite image.
62025-03-06 19:00commentedpehar_11
♦197
Paths will be added after new aerial imagery is available. This note will stay unresolved until the necessary changes are made.
72025-06-07 00:07commentedalessandrocarmeli
♦769
quali modifiche?
82025-06-07 00:33commentedpehar_11
♦197
Correction and registration of the remaining pedestrian paths, surfaces and urban equipment in the north-eastern area of ​​the Benčić neighborhood is required. Due to the lack of photographs from the field or orthophoto showing the area, corrections and changes have not been entered on the map.
4534272
Category: StreetComplete
12024-11-27 06:29openedOsmwithspace
♦1,197
Here are some ways now. via StreetComplete 60.0-alpha1
22025-03-06 19:00commentedpehar_11
♦197
Paths will be added after new aerial imagery is available. This note will stay unresolved until the necessary changes are made.
32025-06-07 00:07commentedalessandrocarmeli
♦769
quali modifiche?
42025-06-07 00:33commentedpehar_11
♦197
Correction and registration of the remaining pedestrian paths, surfaces and urban equipment in the north-eastern area of ​​the Benčić neighborhood is required. Due to the lack of photographs from the field or orthophoto showing the area, corrections and changes have not been entered on the map.
4646602
Category: unknown
12025-03-01 13:46opened---Here is a new petrol station of the company INA.
22025-03-04 17:15commentedronaldp85
♦84
Silić je najavio i otvaranje Odmarališta Kvarner 20. ožujka, u suradnji s INA-om. Objekt će nuditi panoramski pogled, kafić, restoran, dječje igralište i benzinsku crpku, a u budućnosti se planira i postavljanje električne punionice. Silić also announced the opening of the Kvarner Resort on March 20, in collaboration with INA. The facility will offer panoramic views, a café, a restaurant, a children's playground and a gas station, with plans to install an electric charging station in the future.
32025-03-04 17:15commentedronaldp85
♦84
https://www.poslovni.hr/hrvatska/evo-kada-zavrsava-obnova-stare-cijevi-tunela-ucka-na-gradilistu-je-vise-od-150-radnika-rade-u-tri-smjene-4474518
42025-03-05 00:48commentedpehar_11
♦197
Objekt INA-Kvarner upisan je na spomenutoj lokaciji na internetskim stranicama INA-e. Kako bi ista bila upisana na OSM, molim povratni podatak ukoliko je PUO Kvarner otvoreno za sva vozila. Sadržaji PUO Kvarner idalje nisu definirani i upisani na OSM podlogu. Isti će biti provjereni i upisani u potpunosti nakon otvaranja PUO Kvarner u cjelosti.
52025-03-15 14:24commentedpehar_11
♦197
Ucrtan je objekt INA - odmorište Kvarner. Lokacija nije precizna. Predviđeno otvaranje benzinske postaje je 20. ožujka 2025. Točna pozicija biti će definirana nakon dostupnog ortofota i puštanja u promet odmorišta Kvarner za sva vozila.
62025-04-24 20:56commentedJaffaKetchup
♦9
I've added what I can for now - the petrol station forecourt and surrounding retail area still needs mapping, but that might be easier to do once fully open. I've added the future roads and parking areas, based on some official documentation and what I can see is complete/not complete from some news report photos etc. Once fully opened, I believe they will remove the easternmost 'loop', and reverse the direction of the current lowermost road on the other side of the easternmost parking and path. It will then be a split design like the one at Rebri - although I don't know how this factors in the local traffic.
72025-04-24 21:01commentedpehar_11
♦197
Thanks for helping out. I'll personally visit the PUO Kvarner area once it's open and make any necessary changes. According to Bina-Istra, the rest area will only be opened after the Učka–Matulji section of the A8 is fully open to all traffic.
82025-06-04 13:09closedalessandrocarmeli
♦769
added
92025-06-04 21:44reopenedJaffaKetchup
♦9
102025-06-04 21:45commentedJaffaKetchup
♦9
Hey alessandrocarmeli, I think we're still waiting for a ground survey here, I can't see if you've added any info?
112025-06-06 23:58commentedalessandrocarmeli
♦769
dipende se la stazione è stata aperta del tutto (ways) o solo l'area della stazione di servizio
122025-06-07 00:21commentedpehar_11
♦197
Please note that the Rest area Kvarner is not functioning at its full capacity, except for the INA gas station, which is currently operational 24/7. The rest area will be open at its full capacity (including playground areas and other services) after the construction between the tunnel Učka and the exit Matulji-Opatija is completed.
4585430
Category: unknown
12025-01-11 19:51opened---Z 6085 has a length of 1.1km only according to 2024 route log https://narodne-novine.nn.hr/clanci/sluzbeni/2024_07_86_1514.html (it was 1.5km long in the past). Thus, we should truncate 6085
22025-03-12 11:42commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-06-04 17:10commentedpehar_11
♦197
4.6.2025. Report denied. Unable to verify provided infomation. This note remains open and unsolved.
4754276
Category: unknown
12025-05-11 20:44opened---This restaurant is permanently closed since the year 2023.
22025-05-27 13:03commentedpehar_11
♦197
27.5.2025. Note solved The restaurant at this location has been marked as out of service and removed. Please close this note or reply if further action is needed.
32025-06-04 17:07closedpehar_11
♦197
4.6.2025. Note closed and solved.
4551172
Category: unknown
12024-12-12 10:11openedKookykooky
♦652
Forwarding anonymous report from #mapycz user, please verify: "No go through, private property" thank you
22025-06-04 17:06commentedpehar_11
♦197
4.6.2025. Note under review.
4756797
Category: unknown
12025-05-13 12:35opened--- Tunnel
22025-05-14 10:55closedpehar_11
♦197
Tunnel Mala Kapela is already at this location.
4756798
Category: unknown
12025-05-13 12:36opened---Tunnel
22025-05-14 10:55closedpehar_11
♦197
Tunnel Brinje is already at this location.
4756801
Category: unknown
12025-05-13 12:36opened---tunnel
22025-05-14 10:55closedpehar_11
♦197
Tunnel Brezik is already at this location.
4756802
Category: unknown
12025-05-13 12:37opened---tunnel
22025-05-14 10:54closedpehar_11
♦197
Tunnel Plasina is already at this location.
4756803
Category: unknown
12025-05-13 12:37opened---tunnel
22025-05-14 10:54closedpehar_11
♦197
Tunnel Grič is already at this location.
4756806
Category: unknown
12025-05-13 12:38opened---tunnel
22025-05-14 10:54closedpehar_11
♦197
Tunnel Sveti Rok is already at this location.
4744108
Category: unknown
12025-05-05 18:03openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Premještanje početnog stajališta za linije 1A, 5 i 32 za smjer zapad na autobusno stajalište Jelačićev trg nakon obnove cestovne signalizacije.From Tuesday, April 6th, 2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The initial stop for lines 1A, 5, and 32 in the west direction will be relocated to the Jelačić Square bus stop after the renovation of road signage.
22025-05-10 20:50closedpehar_11
♦197
4744080
Category: unknown
12025-05-05 17:54openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Jelačićev trg u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The bus stop Jelačićev trg in the west direction will be re-established after the completion of the final works on the renovation of road signage.
22025-05-10 20:50closedpehar_11
♦197
4744078
Category: unknown
12025-05-05 17:53openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Palazzo Modello u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The establishment of the Palazzo Modello bus stop in the west direction after the completion of the final works on the renovation of road signage.
22025-05-10 20:50closedpehar_11
♦197
4744101
Category: unknown
12025-05-05 17:56openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Riječki neboder u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The bus stop Riječki neboder in the west direction will be re-established after the completion of the final works on the renovation of road signage.
22025-05-10 11:54closedpehar_11
♦197
4744098
Category: unknown
12025-05-05 17:56openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Trg Republike Hrvatske u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The establishment of the Trg Republike Hrvatske bus stop in the west direction after the completion of the final works on the renovation of road signage.
22025-05-10 11:53closedpehar_11
♦197
4744075
Category: unknown
12025-05-05 17:53openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava autobusnog stajališta Riva u smjeru istok nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The establishment of the Riva bus stop in the east direction after the completion of the final works on the renovation of road signage.
22025-05-10 11:53closedpehar_11
♦197
4744087
Category: unknown
12025-05-05 17:54openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Ukidanje autobusnog stajališta Palazzo Modello u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The bus stop Palazzo Modello in the west direction will be abolished after the completion of the final works on the renovation of road signage.
22025-05-10 11:01closedpehar_11
♦197
Uklonjeno.
4744091
Category: unknown
12025-05-05 17:55openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Ukidanje autobusnog stajališta Palazzo Modello u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The bus stop Palazzo Modello in the west direction will be abolished after the completion of the final works on the renovation of road signage.
22025-05-10 11:01closedpehar_11
♦197
Uklonjeno.
4744102
Category: unknown
12025-05-05 17:57openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Ukidanje autobusnog stajališta Jadrolinija u smjeru zapad nakon završnih radova obnove cestovne signalizacije.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The abolition of the Jadrolinija bus stop in the west direction after the completion of the final works on the renovation of road signage.
22025-05-10 11:01closedpehar_11
♦197
Uklonjeno
4744074
Category: unknown
12025-05-05 17:52openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uspostava redovnog režima prometa gdje je Ulica Riva u punom jednosmernom profilu ulice za smjer istok. Vozila iz smjera Fiumare kreću se redovno Scarpinom ulicom, Adamićevom ulicom i Trpimirovom ulicom za smjer zapad.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. Regular traffic regime is being established where Riva Street is in full one-way street profile for east direction. Vehicles from Fiumara direction are moving regularly via Scarpina Street, Adamićeva Street, and Trpimirova Street towards the west.
22025-05-05 22:16commentedpehar_11
♦197
Izmijenjen režim.
32025-05-05 22:43closedpehar_11
♦197
4743292
Category: unknown
12025-05-05 11:04openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. U promet se stavljaju Scarpina ulica, Adamićeva ulica, Trpimirova ulica te privozi Ciottina ulica, Zadarska ulica, Splitska ulica, Zanonova ulica i Riva Boduli nakon završetka iscrtavanja horizontalne signalizacije. Pješački prijelazi, otoci te semafori i područja za pješake ostaju nepromijenjena. Pješačko područje trga 111. brigade otvoreno je za pješake. U funkciju se stavljaju autobusna stajališta Palazzo Modello, Trg Republike Hrvatske, Riječki neboder i Riva. Autobusni terminal Jelačićev trg od sada koriste linije 1A, 5 i 32. From Tuesday, April 6th, 2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. Scarpina Street, Adamićeva Street, Trpimirova Street, and access roads Ciottina Street, Zadarska Street, Splitska Street, Zanonova Street, and Riva Boduli will be opened to traffic after completing the horizontal signage. Pedestrian crossings, islands, and traffic lights, as well as pedestrian areas, remain unchanged. The pedestrian area of 111th Brigade Square is open to pedestrians. Bus stops Palazzo Modello, Republic of Croatia Square, Riječki neboder, and Riva will be put into operation. Jelačićev trg bus terminal will now be used by lines 1A, 5, and 32.
22025-05-05 22:15commentedpehar_11
♦197
Izmijenjen režim.
32025-05-05 22:43closedpehar_11
♦197
4744111
Category: unknown
12025-05-05 18:07openedpehar_11
♦197
Od utorka, 6.4.2025. u 04:00 uspostava redovnog prometa za sva vozila i linije javnog prijevoza Adamićevom ulicom u smjeru zapad. Uklanjanje privremene regulacije prometa na križanju Trpimirova ulica/Žabica/Krešimirova ulica za smjer zapad, uspostava zelenog otoka u zoni autobusnog kolodvora Žabica te vraćanje redovnog kapaciteta autobusnog kolodvora Žabica na redovni broj perona.From Tuesday, 6.4.2025 at 04:00, regular traffic for all vehicles and public transport lines will be established on Adamićeva Street in the west direction. The temporary traffic regulation at the intersection of Trpimirova Street/Žabica/Krešimirova Street for the west direction will be removed, a green zone will be established in the Žabica bus station area, and the regular capacity of the Žabica bus station will be restored to its regular number of platforms.
22025-05-05 22:15commentedpehar_11
♦197
Izmijenjen režim.
32025-05-05 22:43closedpehar_11
♦197
4726414
Category: unknown
12025-04-24 21:05openedpehar_11
♦197
Kamera za kontrolu brzine (lokacije kamere i zona kontrole nepoznata)Speed cameras (camera locations and control zones unknown)
4722919
Category: unknown
12025-04-22 15:34openedpehar_11
♦197
Kamera za kontrolu brzine kretanja (Ž5047, poddionica 02, km 3+554)Speed enforcement cameras (Ž5047, subsection 02, km 3+554)
22025-04-22 15:36closedpehar_11
♦197
4722928
Category: unknown
12025-04-22 15:35openedpehar_11
♦197
Kamera za kontrolu brzine kretanja (D8, poddionica 02, km 11+393)Speed enforcement cameras (D8, subsection 02, km 11+393)
22025-04-22 15:36closedpehar_11
♦197
4722346
Category: unknown
12025-04-22 12:07openedpehar_11
♦197
Kamera za kontrolu brzine kretanja (Ž5047, poddionica 03, km 0+367)Speed enforcement cameras (Ž5047, substation 03, km 0+367)
22025-04-22 15:29closedpehar_11
♦197
4666715
Category: unknown
12025-03-16 10:14opened---The mapper "pehar_11" has already been informed here in winter that the old tube of the tunnel will NOT open in May 2025. But he did not believe it and therefore did not correct his wrong opening date. On 4 March, 2025 Bina Istra now has also officially confirmed that this tube will open in the middle of summer only (sredine ljeta 2025).
22025-03-16 14:44closedpehar_11
♦197
369598112023-05-19 11:35openedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "playground"
22025-03-12 11:56commentedpehar_11
♦197
12.3.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-03-14 20:59commentedpehar_11
♦197
14.3.2025. Report accepted: Changes applied A playground area has been added to this location. Please close this note or provide additional information.
42025-09-25 15:39closedAPneunzehn74
♦1,994
is in the OSM data
405814812024-01-08 10:07openedMatyjaceForwarding anonymous report from #mapycz user, please verify: "HEALTH CENTER SENJ",
22025-03-12 11:56commentedpehar_11
♦197
12.3.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-03-14 20:55commentedpehar_11
♦197
14.3.2025. Report accepted: Changes applied "Dom zdravlja Senj" / "Health center Senj" (Stara cesta 43, 53270 Senj) has been added to this location. Please close this note or provide additional information.
4591653
Category: unknown
12025-01-17 09:29openedKookykooky
♦652
Forwarding anonymous report from #mapycz user, please verify: "there is a nudist beach here" thank you
22025-03-12 11:55commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
336558812022-09-19 11:50openedPan Perníček
♦13,485
Forwarding anonymous report from #Mapy.cz user, please verify: There are three historic cannons.
22025-03-12 11:55commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
373382112023-06-13 16:39openedfukejs
♦248
#Mapy.cz user reported: Denkmal (Gat Svetog Nikole) Der Leuchtturm ist am Steg links!!! please verify
22025-03-12 11:55commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
393152912023-10-09 08:48openedPan Perníček
♦13,485
Forwarding anonymous report from #Mapycz user, please verify: Public shower is out of order. https://www.openstreetmap.org/node/9871191865
22025-03-12 11:45commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-08-18 16:44closedModrulj
♦12
Verified and map updated
323856312022-06-24 12:04openedPan Perníček
♦13,485
Forwarding anonymous report from #Mapy.cz user, please verify: The bakery is currently closed. https://www.openstreetmap.org/node/4271273144
22025-03-12 11:42commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
406307112024-01-12 07:25openedMatyjaceForwarding anonymous report from #mapycz user, please verify: "apartments"
22025-03-12 11:42commentedpehar_11
♦197
12.2.2025. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
4594764
Category: unknown
12025-01-20 02:29openedMatija Nalis
♦14,895
#surveyme tu negdje Ha Ha muzej (https://www.haha.house/)I'm somewhere at Ha Ha museum
22025-03-07 17:34closedpehar_11
♦197
Dodano.
4652351
Category: unknown
12025-03-05 12:27opened---The mapper "pehar11" has already been informed here in winter that the old tube of the tunnel will NOT open in May 2025. But he did not believe it and did NOT correct the wrong opening date. Now Bina Istra has also officially confirmed that this tube will open in the middle of summer only (sredine ljeta).
22025-03-06 17:59commentedpehar_11
♦197
The official opening date of Učka tunnel (A8) has been changed according to the official information provided by Bina Istra. All changes made on major motorway and highway relations are updated after the official information has been released to ensure that data is always up-to-date and correct. In case of any changes in the tunnel opening date, the current data will be edited after Bina Istra makes the official statement. You may enter any additional information below. Since the data was updated, please close this note if the issue is resolved. Please refrain from naming out loud mappers working in this area. For any additional information, you may reply here or reach me via DMs.
32025-03-06 18:05commentedpehar_11
♦197
For additional information regarding this note, planned opening date for Učka tunnel has been set to 2025-05 and remains the same at the time. The last edit/data check on this tunnel and its date was at 2024-11-26. This information is also available on the map itself.
42025-03-07 13:32closedpehar_11
♦197
4474535
Category: Spam
12024-10-11 17:36openedpehar_11
♦197
Zbog produljenja radova u Adamićevoj ulici (i nastavka režima dvosmjernog prometa ulicom Riva) potrebno je preusmjeriti linije javnog gradskog prijevoza na relaciji Fiumara - Jelačićev trg - Veslarska - Riva (dvosmjerno) i dalje redovim trasama (za gradske linije) i relaciji Delta (autobusni terminal) - Šet. A.K. Miošića - D404 (Ulica Hinka Bačića) - Riva (dvosmjerno) i dalje redovnim trasama u smjeru Srdoči/Kastav/Permani/Lovran. Gradske linije koriste autobusna stajališta "Palazzo Modello" i "Jadrolinija" a prigradske linije stajališta "Ul.Ivana Zajca" i "Jadrolinija". Prigradske linije u smjeru Srdoči/Kastav/Permani/Lovran ne koriste autobusno stajalište "Fiumara pr". a gradske linije ne koriste stajalište "Riva" u smjeru Trsat/Kostrena/Pećine (zamjensko stajalište za sve gradske linije je autobusno stajalište "Žabica" i "Tržnica").
22025-03-06 19:00closedpehar_11
♦197
// Riješeno //
4499256
Category: StreetComplete
12024-10-29 12:22openedPKla
♦120
Unable to answer "Is this still here?" – Euronet (ATM) – https://osm.org/node/7704548267 via StreetComplete 59.2: bankautomat nicht gefunden
22024-12-12 23:18commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-02-18 13:47closedpehar_11
♦197
18.2.2025. Report accepted: Changes made A review of the available data revealed that the Euronet ATM is not at this location. Accordingly, it was removed from the map. Changeset: https://www.openstreetmap.org/changeset/162661976#map=19/45.335758/14.310598&layers=N Please reopen this report and provide additional data if further changes are necessary.
275173612021-07-12 10:25openedPan Perníček
♦13,485
Forwarding anonymous report from #Mapy.cz user, please verify: There's a beach.
22024-12-12 23:13commentedpehar_11
♦197
13.11.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32024-12-13 20:41commentedpehar_11
♦197
13.12.2024. Report reviewed. No action taken: Unable to verify the existence of a beach at this location. Please provide additional information or manually close this note.
42025-01-26 01:35closedpehar_11
♦197
387749312023-09-08 13:42openedbrandisbrandisbrand
♦124
"rundown and destroyed" The place has gone or never existed. A user of Organic Maps application has reported that the POI was visible on the map (see snapshot date below), but was not found on the ground. OSM snapshot date: 2023-07-10T17:38:00Z POI name: Motel Vratnik POI types: building #organicmaps android
22024-12-12 23:23commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32024-12-18 18:04commentedpehar_11
♦197
18.12.2024. Report updated. Data verified. "Motel Vratnik" (Cadastral parcel number 7650/2, Cadastral municipality 325236 Sveti Juraj, Address Vratnik, Area 3044 m2, Type of use: motel, PL number 3105/k.č.br. 7650/2, MB 325236 k.o. SVETI JURAJ) is abandoned but still exists at this location. According to available data from the Ministry of Justice, Administration and Digital Transformation and the State Geodetic Administration, this building is not demolished and is not currently in use. Building tags are updated to match the abandoned building.
42025-01-26 01:35closedpehar_11
♦197
4584973
Category: StreetComplete
12025-01-11 12:45openedLandry MINOZA
♦15
At this point, the way is too thin for a car on approximately 5 meters via StreetComplete 58.2
22025-01-16 17:51commentedpehar_11
♦197
Case opened: Collecting data. Please provide additional information necessary for resolving the issue. All subsequent changes will be entered in the content of this report.
32025-01-16 18:05commentedpehar_11
♦197
Case accepted: Changes made A review of the available data revealed that traffic on the specified section is restricted due to insufficient road width. The existing road section has been removed and repurposed as a pedestrian walkway (from 000+127km to 000+125km). The road alignment has been adjusted, along with the accompanying vertical signage and street name updates. Information source: Geportal of State Geodetic Directorate Changeset: https://www.openstreetmap.org/changeset/161428492#map=18/45.360119/14.307708&layers=N Please provide additional information or manually close the note. Otherwise, this note will be closed in 10 days.
42025-01-25 16:32closedpehar_11
♦197
Case closed: Case closed
4400361
Category: unknown
12024-08-24 14:28openedpehar_11
♦197
Nedostaje "highway=proposed proposed=trunk_link" te dva kružna raskrižja na križanju D403/Osječka ulica prema planskoj dokumentaciji.It is missing "highway=proposed proposed=trunk_link" for the two roundabouts at the intersection of D403/Osječka street according to the planning documentation.
22025-01-25 16:32closedpehar_11
♦197
Uređeno
379946912023-07-26 06:32openedPan Perníček
♦13,485
Forwarding anonymous report from #Mapy.cz user, please verify: There's a restaurant. https://www.openstreetmap.org/node/3086653351
22024-12-12 23:17commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-01-08 14:03commentedpehar_11
♦197
8.11.2025. Unable to verify the existence of a restaurant at this location. Please provide additional information or close this note.
42025-08-28 16:00commentedModrulj
♦12
The restaurant was closed (as well as the camping site).
52025-08-28 16:01closedModrulj
♦12
235781112020-09-21 17:14openedkklarinCrkva Sv. Nikole
22020-09-21 17:17closedkklarin
32020-09-21 17:17reopenedkklarin
42024-12-12 23:13commentedpehar_11
♦197
13.11.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
52024-12-13 20:44commentedpehar_11
♦197
13.12.2024. Report reviewed. Action taken: Church name edited. Changeset: https://www.openstreetmap.org/changeset/160261163 Please provide additional information or manually close this note.
62025-01-08 14:00closedpehar_11
♦197
4440508
Category: unknown
12024-09-17 22:46opened---Villa Mystic Place
22024-12-12 23:21commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-01-08 14:00closedpehar_11
♦197
8.1.2025. Villa "Mystic Place" added.
164455912019-01-09 09:53openeddmitrecicApartmani Boris Jezere
22024-12-12 23:16commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32024-12-13 20:49commentedpehar_11
♦197
13.12.2024. Report reviewed. Action taken: Apartments "Boris" added. Changeset: https://www.openstreetmap.org/changeset/160261263#map=19/43.780577/15.642565&layers=N Please provide additional information or manually close this note.
42025-01-08 13:54closedpehar_11
♦197
8.1.2025. Note 1644559 closed.
4550065
Category: unknown
12024-12-11 10:49openedKookykooky
♦652
Forwarding anonymous report from #mapycz user, please verify: "toilets are closed" thank you
22024-12-12 23:18commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32024-12-13 20:36commentedpehar_11
♦197
13.12.2024. Please provide additional information. Are the toilets closed permanently?
42025-06-07 00:08closedalessandrocarmeli
♦769
no, i bagni sono tuttora aperti.
411038312024-02-12 19:56openedPPKFS
♦19
Is this actually a museum?
22024-11-30 12:07commentedpehar_11
♦197
30.11.2024. Building tags edited. Please close this note if the issue is solved or provide additional information.
32024-12-12 23:25closedpehar_11
♦197
285349112021-09-15 12:39openedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "The store nearby should be here."
22024-08-30 15:55commentedpehar_11
♦197
Note 2853491 is updated! - Report reviewed. - Report/map edit unsolved (reason: Cannot verify the store location). No information about this object was found while searching k.č.br. *1583/1, MB 330124 k.o. MURTER BETINA. No information was found or gathered if the store at this location is opened or working. - Report open (reason: Unable to verify data).
32024-11-29 20:17commentedpehar_11
♦197
29.11.2024. Please provide additional information or close this note.
42024-12-12 23:17closedpehar_11
♦197
260069112021-03-30 12:29openedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "Missing path."
22024-12-12 23:16commentedpehar_11
♦197
13.12.2024. Unable to confirm data.
329133012022-07-30 19:54openedStefanB
♦149
No ATM here
22024-12-12 23:15commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
4396415
Category: unknown
12024-08-22 09:12openedModrulj
♦12
The building has the restaurant Carpathia and a cafe Silver II but no cafe Sabo
22024-11-29 20:19commentedpehar_11
♦197
29.11.2024. Amenity removed. Please close this note if the issue is solved or provide additional information.
32024-12-12 23:14closedpehar_11
♦197
379065212023-07-21 07:11openedMatyjaceForwarding anonymous report from #Mapy.cz user, please verify: "Cirkva Sv. Roka"
22024-12-12 23:14commentedpehar_11
♦197
13.12.2024. Report under review. Data collection and verification is in progress. All subsequent changes will be entered in the content of this report.
32025-06-11 12:33closedKookykooky
♦652
4504868
Category: OsmAnd
12024-11-02 19:53openedMARIN 2005fiksna kamera za brzinu #OsmAndFixed speed cameras
22024-11-29 20:15commentedpehar_11
♦197
29.11.2024. Dodana fiksna kamera za kontrolu brzine Ručno zatvorite ovu bilješku ako je problem riješen ili dostavite dodatne informacije.
32024-12-04 15:30closedpehar_11
♦197
4494803
Category: StreetComplete
12024-10-26 09:38openedhunsly
♦217
There is no pedestrian crossing here. via StreetComplete 59.0
22024-12-04 15:29commentedpehar_11
♦197
4.12.2024. Unable to verify if the pedestrian crossing exists at this location.
32025-07-15 08:53commentedMarcinMound
♦27
There is a pedestrian crossing here
42025-07-26 22:34closedĐuro Jiří
♦20,599
Postoji
4535656
Category: StreetComplete
12024-11-28 09:38openedOsmwithspace
♦1,197
I think the street name should be according to this sign. via StreetComplete 60.0-alpha1 Attached photo(s): https://westnordost.de/p/252382.jpg
22024-12-01 20:38commentedpehar_11
♦197
1.12.2024. Street name edited. Changeset: https://www.openstreetmap.org/changeset/159819467 Please close this note if the issue is solved or provide additional information.
32024-12-04 07:56commentedOsmwithspace
♦1,197
Thanks for the changes! I think the street should also be changed in the houses.
42024-12-04 08:28commentedpehar_11
♦197
4.12.2024. Street addresses will be arranged and corrected as soon as possible. This note will remain open and unsolved given that further changes are expected.
52024-12-04 15:26commentedpehar_11
♦197
4.12.2024. Addresses changed to match existing streets. Please close this note if the issue is solved or provide additional information.
62025-04-15 04:10closedAPneunzehn74
♦1,994
The street name has already been corrected, and all buildings with street addresses have already been correctly assigned.
4537103
Category: StreetComplete
12024-11-29 11:36openedOsmwithspace
♦1,197
I think the street name should be according to this sign. via StreetComplete 60.0-alpha1 Attached photo(s): https://westnordost.de/p/252454.jpg
22024-12-01 20:38commentedpehar_11
♦197
1.12.2024. Street name edited. Changeset: https://www.openstreetmap.org/changeset/159819467 Please close this note if the issue is solved or provide additional information.
32025-04-15 04:09closedAPneunzehn74
♦1,994
The street name has already been corrected, and all buildings with street addresses have already been correctly assigned.
4535717
Category: StreetComplete
12024-11-28 11:05openedOsmwithspace
♦1,197
I think the street name should be according to this sign. via StreetComplete 60.0-alpha1 Attached photo(s): https://westnordost.de/p/252384.jpg
22024-12-01 20:33commentedpehar_11
♦197
1.12.2024. Street name edited Please close this note if the issue is solved or provide additional information.
32024-12-04 07:59closedOsmwithspace
♦1,197
4517553
Category: unknown
12024-11-12 23:19opened---This building does not exist anymore: It has been demolished in autumn 2024.
22024-11-27 17:36commentedpehar_11
♦197
27.11.2024. Building removed. Please close this note if the issue is solved or provide additional information.
32024-11-28 17:06closedpehar_11
♦197
4515945
Category: unknown
12024-11-11 16:43opened---The re-opening of the old tube will NOT be in March 2025 (as mentioned here by the mapper JaffaKetchup). The truth is: that the old tunnel after its refurbishment will again be opened in June 2025 only (according to Bina-Istra).
22024-11-26 22:48commentedpehar_11
♦197
26.11.2024. Opening date edited (Information source: Bina Istra). Please close this note if the issue is solved or provide additional information.
32024-11-27 17:47commentedpehar_11
♦197
27.11.2024. (Copied text) After a written declaration of the Bina-Istra concessionaire was received, the opening date of the tunnel tube under renovation remains unchanged. According to the planning documentation, the official opening is expected in 05-2025. In the event of an official announcement of a delay in work, the date will be changed later.
42024-11-28 17:06closedpehar_11
♦197
4534879
Category: unknown
12024-11-27 14:47opened---Info for mapper pehar_11: No, the re-opening of the old tunnel will not be in May, but in June 2025 only. In early November I have been talking to Bina Istra in person and they said to me: JUNE !
22024-11-27 17:32commentedpehar_11
♦197
27.11.2024. (Regarding Note no. 4515945) The Bina Istra concessionaire was requested to provide a statement about the planned opening of the tunnel tube. After receiving the official information, the data on the map will be updated or changed if necessary. Please use Note no. 4515945 for further replies or information. This note is now closed!
32024-11-27 17:46commentedpehar_11
♦197
27.11.2024. (Regarding Note no. 4534879) After a written declaration of the Bina-Istra concessionaire was received, the opening date of the tunnel tube under renovation remains unchanged. According to the planning documentation, the official opening is expected in 05-2025. In the event of an official announcement of a delay in work, the date will be changed later. Please use Note no. 4515945 for further replies or information. This note is updated! This note is now closed!
42024-11-27 17:47closedpehar_11
♦197
52024-11-28 17:06reopenedpehar_11
♦197
62024-11-28 17:06closedpehar_11
♦197
4487413
Category: OsmAnd
12024-10-20 19:51opened---Speed Camera #OsmAnd
22024-10-26 10:19commentedpehar_11
♦197
Speed camera added. Please close this note if the issue is resolved.
32024-11-23 12:05closedpehar_11
♦197
4487414
Category: OsmAnd
12024-10-20 19:52opened---Speed Camera #OsmAnd
22024-10-26 10:16commentedpehar_11
♦197
Speed camera is located after tunnel Burlica (A7) in direction of Krk/Crikvenica and is marked on the map. Please close this if the issue is resolved. If not, please provide additional information in order to update map data.
32024-11-23 12:05closedpehar_11
♦197
4504880
Category: OsmAnd
12024-11-02 20:06openedMARIN 2005fiksna kamera za brzinu #OsmAndFixed speed cameras
22024-11-23 12:04closedpehar_11
♦197
Kamera za mjerenje brzine je postavljena na ovoj lokaciji (A7, smjer Orehovica prije vijadukta Svilno).