1~ 1 year agoopenedDaitruxdd
♦145
Monmouth Mall is being demolished and luxury apartments are going to be built in its place.
2~ 1 year agocommentedjhaluska80
♦3,014
I did a first pass on updating it based off websites saying it's demolished and what is remaining open. https://patch.com/new-jersey/longbranch/goodbye-monmouth-mall-we-knew-it-demolition-now-underway I'm not local so i don't know where they moved the Barne's & Noble so I left it where it is. I'm leaving this note open for a survey to confirm and/or make future adjustments.
3~ 1 year agocommentedDawsZed
♦229
Hi, I'm local here; the remaining POIs are still open and correct. Only parts of the main mall building will be demolished, the separated buildings are roughly what will be kept. Note it's very early in demolition, and the overall building is very much still there.
4~ 1 year agocommentedDawsZed
♦229
As an update, it's well into demolition now, and only the superstructure core of the promenade remains standing. Moved over the Barnes, removed demolished parking areas. Had to adjust some bus routes that stop here.
5~ 9 months agocommentedDawsZed
♦229
Moved over the Monmouth Mall area to the food court/Barnes area that will remain, to keep its history. The main Monmouth Mall area is now substantially demolished and no longer standing - tagged this with a throwaway demolished:building area. Expanded construction areas, added the first few buildings seen under construction. Added an end_date to the SCAN activity center.
6~ 7 months agoclosedThereal0000000000
7~ 7 months agoreopenedjhaluska80
♦3,014
8~ 4 months agocommentedDawsZed
♦229
Added new buildings and roads surveyed under construction. This includes the future Whole Foods and an attached retail (the two buildings west of Macy's), the first of two "quad" apartment building blocks, a C-shaped community center, and a small retail store NE of the cinema. Added new parking lot alignment near the future Whole Foods as well as near the small retail; adjusted the construction area accordingly. Added a new unclassified road and pulloff/driveway seen N of the cinemas, and other roads seen under construction near the Whole Foods. Reclassified entrance roadways as primary_links, realigned Wyckoff Road, added speed humps and stop signs to "outer loop" roadways.
9~ 1 month agocommentedDawsZed
♦229
Add rough geometry of new buildings seen under construction SW of Macy's. Add rough geometry of new "quad" apartments now beginning construction. Realign "loop" street near Wyckoff Road and near the first quads. Downgrade southern loop road and reclassify as it is now closed and pending demolition/realignment - this also means the construction boundary has been modified again to expand it towards the road. Kushner now has an office where former Knockerball play center was. Removed the western exit for the delivery tunnel, and removed parking for the nearby senior center. Whole Foods seems complete with signage but is clearly not open yet, there's probably parking and roads that still need to be built to the NW and SE of the building.
10~ 17 days agocommentedDawsZed
♦229
Updated Bus Routes 831 and 832. This affects the southern half of the "loop road" around the property, which is permanently closed pending realignment and reclassification to discourage flow of through traffic.
5109856
Category: StreetComplete
1~ 2 months agoopenedCurlingMan13
♦52,478
Double check road classification for slip lanes. It seems... Off. via StreetComplete 62.1
2~ 2 months agoclosedDawsZed
♦229
Yeah it does seem off. Removed the non-separated slip lane, retag as link, remove descriptive non-signed name of street, added turn lane on River Road.
4747559
Category: unknown
1~ 10 months agoopenedDaitruxdd
♦145
Starbucks - new location under construction
2~ 10 months agocommentedCurlingMan13
♦52,478
Updated building tag and added shop=coffee to construction area.
3~ 9 months agocommentedCurlingMan13
♦52,478
Removed roads here. Assuming new building may mean new road config.
4~ 9 months agocommentedCurlingMan13
♦52,478
Found a source that stated it would have a drive through. Added source to construction area and drive_through=yes.
5~ 9 months agocommentedCurlingMan13
♦52,478
Also scheduled to be completed Q4 2025. Added that info to construction area as well.
6~ 7 months agocommentedDawsZed
♦229
Demolished, but no construction seen on survey. Tagged as brownfield.
7~ 5 months agocommentedCurlingMan13
♦52,478
Any update on progress? Ready to change it back from brownfield to construction?
8~ 5 months agocommentedDawsZed
♦229
No construction on survey today, just an empty field (https://pixvid.org/images/2025/09/24/UA7vQ.png). I feel this note was opened too soon.
9~ 5 months agocommentedCurlingMan13
♦52,478
Is it more of a proposal rather than construction? We don't map proposals on OSM since it can't be verified. And generally only map construction once they begin. We also don't use notes to keep track of construction projects once the details are captured. So what do we want to do? Regular pings to work toward note resolution? I had the details added, but you removed them, which I sort of agree. I don't think this note serves its intended purpose and is misleading if construction hasn't even started (and may not start immediately). I'm more than happy to ping the note for updates semi-regularly.
10~ 5 months agocommentedDaitruxdd
♦145
https://themonmouthjournalnorthern.com/starbucks-coming-to-former-bank-of-america-site-in-union-beach-p14684-150.htm According to this source there should be construction going on. I haven’t surveyed the area in a while but last I checked the old building was demolished but no work on the new one started
11~ 3 months agocommentedCurlingMan13
♦52,478
Has construction started so we can move the lifecycle up to construction?
12~ 2 months agoclosedDawsZed
♦229
Closing this note as it is misleading about the present status of this location. No construction seen here on multiple resurveys.
5061501
Category: Unknown
1~ 3 months agoopened---rock climbing gym: The Gravity Vault - Middletown, NJ
2~ 2 months agoclosedDawsZed
♦229
Added, thank you.
4623316
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Bridge MT-10 Replacement. Scheduled to open Fall 2025
2~ 1 year agocommentedDawsZed
♦229
Confirmed this by survey, added access tagging for the roads here.
3~ 11 months agocommentedCurlingMan13
♦52,478
Added note text "Bridge MT-10 Replacement. Scheduled to open Fall 2025" to note=* tag on ways.
4~ 6 months agocommentedCurlingMan13
♦52,478
Any update on construction? #WorkingTheNotes
5~ 6 months agocommentedDaitruxdd
♦145
As of 2 weeks ago it was still under construction
6~ 4 months agocommentedCurlingMan13
♦52,478
Has it reopened yet?
7~ 4 months agocommentedCurlingMan13
♦52,478
No response received. Is construction complete yet?
8~ 4 months agocommentedDawsZed
♦229
Not open yet, still under construction, signs for closure are still up with construction equipment on site.
9~ 2 months agoclosedDawsZed
♦229
Construction complete. Tagged as open.
4584635
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Tonnelle Avenue Bridge and utility relocation project
2~ 11 months agocommentedCurlingMan13
♦52,478
What is the scope of this project? What needs to be done on the map? Looks like this area was already mapped as a construction zone, so I am trying to figure out what issue needs to be addressed to resolve the note...
3~ 11 months agocommentedDaitruxdd
♦145
information on the project can be found here https://www.gatewayprogram.org/tonnelle-avenue-bridge-utility-relocation-project.html
4~ 10 months agocommentedDawsZed
♦229
Me and others have already added and have been editing this construction site for the past 2 years. Are there any specific errors or omissions with this location?
5~ 9 months agocommentedCurlingMan13
♦52,478
That's exactly what I am trying to figure out. What information is the note providing? All the information is already present in the respective construction areas.
6~ 4 months agocommentedCurlingMan13
♦52,478
Any update that still needs to be added? All information from note incorporated, so I don't see why we're keeping this note open. Source was already added to the construction area.
7~ 4 months agoclosedDawsZed
♦229
No need for this note anymore per CurlingMan, nothing left to do now. I have good faith in our rail editors to watch and update this decade-spanning project in due time.
4395635
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Can someone provide a status for this new road. I should be open by now but I can’t find any information about it actually being open
2~ 1 year agocommentedDawsZed
♦229
This is the Route 1&9T Extension (New Road) under the Lincoln Tunnel Access Project. From what I could find, there are three contracts to this roadway - this segment is Contract 1, which is complete. Found this document that shows its progress: https://www.nj.gov/transportation/capital/stip2433/sec11/pdf/njtpa.pdf Eventually the full extension of the roadway will fly over the Croxton Intermodal Terminal going SW, go under the NJ Transit lines, and join with Westside Avenue. One of the slides in this presentation shows the future alignment: https://0c337598-168f-4f94-ad4c-29cfee3567ca.filesusr.com/ugd/98f1dc_ff7e7c2802564755abf19e5121865cb9.pdf Not sure if NJTPA would open this segment when it's part of a larger roadway? If anyone local here can take a look to confirm, it'd be appreciated.
3~ 1 year agocommentedDaitruxdd
♦145
apparently it won't be open until the other segments are finished
4~ 1 year agocommentedDawsZed
♦229
Yeah, I was here a day or two ago, both ends are blocked off with jersey barriers and closed signs, not even EMS could go down here
5~ 1 year agoclosededang3
♦1
6~ 1 year agoreopenedDaitruxdd
♦145
7~ 9 months agocommentedDawsZed
♦229
I feel like this can be resolved in favor of adding a new note at the construction east of Hudson Logistics Park (SW of this note) since that's the part under construction right now, up to you. Added the sources I found here into the ways already.
8~ 7 months agocommenteddannmer
♦18,756
Can the construction tags be removed from the roadway? Can the note be resolved?
9~ 4 months agocommentedCurlingMan13
♦52,478
No response received on previous question... Please respond. Is the road still under construction?
10~ 4 months agoclosedDawsZed
♦229
This segment is paved but part of a larger road under construction that won't be complete for years. Everything's been added otherwise, no use for this note anymore. I'll keep track of this place in the meantime.
4578954
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
new condominium/commercial building "Rivermark" is being built here. Leaving note to help keep track of construction.
2~ 1 year agocommentedCurlingMan13
♦52,478
Any update on when it might be complete? I can see that the construction area is marked, so I am not sure what else needs to be added.
3~ 1 year agocommentedDaitruxdd
♦145
building under construction could be added.
4~ 1 year agocommentedCurlingMan13
♦52,478
Do you have site plans or imagery of the building?
5~ 1 year agocommentedDawsZed
♦229
I've added an approximate outline from my local survey and cross-referenced site plans found online
6~ 6 months agocommentedCurlingMan13
♦52,478
Any update on construction?
7~ 6 months agocommentedDawsZed
♦229
From survey this morning, concrete superstructure seems done, but no signs of building woodwork yet. Seems construction has stalled.
8~ 4 months agocommentedCurlingMan13
♦52,478
Any update? Latest imagery shows building is built.
9~ 4 months agocommentedDawsZed
♦229
Yup that's the bare concrete superstructure. I passed through here yesterday and there's no difference from my last survey in August.
10~ 4 months agocommentedCurlingMan13
♦52,478
updated last check date.
11~ 1 month agocommentedCurlingMan13
♦52,478
Any update on construction?
4534877
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Middletown Veteran's Housing Construction
2~ 1 year agocommentedCurlingMan13
♦52,478
Construction area has been added.
3~ 1 year agocommentedCurlingMan13
♦52,478
Any update on construction?
4~ 11 months agocommentedDawsZed
♦229
Construction is underway, structure about 3-4 stories tall with steel and concrete blocks present on site from local survey. Previously added the building under construction onto the site.
5~ 6 months agocommentedCurlingMan13
♦52,478
Any update on construction?
6~ 6 months agocommentedDawsZed
♦229
From survey today, looks like the building exterior is done, but the lot (parking, trees, etc) and the interior isn't paved/finished yet. Photo from the Middletown mayor a month ago, lot looks the same now: https://www.instagram.com/p/DL5_SbUtEKN/
7~ 4 months agocommentedCurlingMan13
♦52,478
Any update on construction?
8~ 4 months agoclosedDawsZed
♦229
Construction complete per survey.
4994105
Category: Unknown
1~ 5 months agoopenedmatthewfecica
♦22
Need GPS track for rest of trails at Schlesinger Preserve
2~ 5 months agoclosedDawsZed
♦229
Added using Strava GPS traces.
4736296
Category: unknown
1~ 10 months agoopenedDaitruxdd
♦145
new building construction
2~ 10 months agocommentedCurlingMan13
♦52,478
Do you know what it is or what it will be?
3~ 10 months agocommentedDaitruxdd
♦145
Not sure at the moment
4~ 9 months agocommentedCurlingMan13
♦52,478
Was old building demolished?
5~ 9 months agocommentedDaitruxdd
♦145
Yes old building no longer exists
6~ 9 months agocommentedCurlingMan13
♦52,478
Added demolished:building=yes to the building that is on imagery.
7~ 5 months agoclosedDawsZed
♦229
From survey today, building is substantially complete. Added building and remove construction area.
4544662
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Aberdeen Road bridge replacement and roadway improvements
2~ 1 year agocommentedCurlingMan13
♦52,478
Any update? Bear in mind that any updates made to OSM will take months to get into any navigation units, so even when it is reopened, it may take months to filter back into navigation apps and services that the road is usable once again.
3~ 1 year agocommentedDaitruxdd
♦145
It’s going to be closed till the end of this year
4~ 7 months agocommentedCurlingMan13
♦52,478
Please review the wiki page for Key:construction. Short-term construction projects should not use highway=construction. This helps with OSM data that is used offline. https://wiki.openstreetmap.org/wiki/Key:construction#:~:text=Don%27t%20use%20construction%3D*%20to%20tag%20such%20short%2Dterm%20closures%2C
5~ 5 months agoclosedDawsZed
♦229
Bridge and roadway reopened per https://www.tnnewsonline.com/blogs/aberdeen-road-bridge-transformed-from-eyesore-to-community-asset; remove temporary access tagging to resolve.
4953584
Category: Unknown
1~ 6 months agoopenedDawsZed
♦229
Huge cracks causing roadway displacement have closed CR 656 in both directions around here. Officials say roads will be closed for months, without being specific. (https://newjersey.news12.com/smith-street-in-woodbridge-closed-for-months-due-to-massive-road-damage)
2~ 6 months agocommentedjhaluska80
♦3,014
That link is dead. New one seems to be: https://newjersey.news12.com/smith-street-to-close-for-several-months-due-to-mysterious-crack-in-roadway I know this time frame is a bit of a grey area for construction, but I thought it'll probably be closed through Thanksgiving and possibly Christmas. NJ mappers tend to stay on top of these things, so feel free to change it back if the time frame ends up shorter. I'm not sure about Route 440 Connector and the opposite direction.
3~ 5 months agocommentedDawsZed
♦229
The website for Woodbridge has an alert with a map showing all the hard barriers for these roads; I've tagged the affected roads as both construction and with conditional:motor_vehicle to the end of December. Here's hoping the routers will respect that. Apologies for how grey this is, I'll keep close watch on progress here in the meantime.
4~ 5 months agocommentedCurlingMan13
♦52,478
Update on crack: https://newjersey.news12.com/officials-confirm-crack-on-smith-street-was-caused-by-nearby-construction
5~ 5 months agocommentedCurlingMan13
♦52,478
No construction has occurred. Looks like road is still closed based off latest facebook news post I saw.
4556557
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Azalea Red Bank
2~ 1 year agoclosedCurlingMan13
♦52,478
named as such.
3~ 1 year agoreopenedDaitruxdd
♦145
4~ 1 year agocommentedDaitruxdd
♦145
leaving note open as a reminder to update the map once construction is finished
5~ 1 year agoclosedCurlingMan13
♦52,478
But it is added as a construction zone though. I generally don't leave notes open when all the information contained in the note has been added.
6~ 1 year agoreopenedCurlingMan13
♦52,478
7~ 1 year agocommentedCurlingMan13
♦52,478
But it is added as a construction zone though. I generally don't leave notes open when all the information contained in the note has been added. Sorry, didn't mean to close.
8~ 1 year agocommentedDaitruxdd
♦145
it makes it easier to keep track of current construction projects that need to be frequently updated.
9~ 1 year agocommentedCurlingMan13
♦52,478
Any update on construction progress?
10~ 1 year agocommentedCurlingMan13
♦52,478
Any update on construction project? Has the building construction started so we can get that added?
11~ 1 year agocommentedDawsZed
♦229
Looks like it's been started for a bit, added buildings from local survey and advertisements seen on site. https://i.imgur.com/j7yysa7.jpeg
12~ 10 months agocommentedCurlingMan13
♦52,478
Any update on construction progress?
13~ 10 months agocommentedCurlingMan13
♦52,478
Also, found addresses and added nodes to building.
14~ 10 months agocommentedDaitruxdd
♦145
The main structure can be seen. Still a lot of work before it will be completed
15~ 9 months agocommentedCurlingMan13
♦52,478
Based on your latest note, I updated the checked_date=* tag which allows construction zones to be identified and tracked based on when they were last checked. check_date=2025-05-08
16~ 6 months agocommentedCurlingMan13
♦52,478
Any update on construction?
17~ 6 months agocommentedDawsZed
♦229
From survey this morning, building exteriors seem to be fully built out, construction for the lot/ground (parking, drainage) still ongoing.
18~ 4 months agocommentedCurlingMan13
♦52,478
Any update or can note be closed since all information in note is added and there is no further action required in the note?
19~ 4 months agoclosedCurlingMan13
♦52,478
No response received. Latest imagery shows it is complete or almost complete.
4624432
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
One Globe Court Apartment building construction
2~ 1 year agocommentedCurlingMan13
♦52,478
Buildings demolished yet on the North end and South ends of this construction area? If so, they should be tagged as demolished.
3~ 1 year agocommentedDaitruxdd
♦145
Buildings have been demolished and the new structure can be seen
4~ 1 year agocommentedDawsZed
♦229
As an update, I've added the outline of the building under construction, seen by survey and cross-referenced with online renders
5~ 6 months agocommentedCurlingMan13
♦52,478
Any update on construction?
6~ 6 months agocommentedDawsZed
♦229
From survey this morning, the wooden exterior structure of the building seems almost complete. Still needs roofing/facade/etc exterior and interior work, so about halfway complete.
7~ 4 months agocommentedCurlingMan13
♦52,478
Any update on status?
8~ 3 months agocommentedCurlingMan13
♦52,478
Any update on status?
9~ 1 month agocommentedCurlingMan13
♦52,478
Any update on progress or status?
1674561~ 11 years agoopenedRub21_nycbuildingsLocation of Public School 615 seems off
2~ 9 months agocommentedMateusz Konieczny
♦37,377
https://www.openstreetmap.org/node/357580666/history - misplaced imported GNIS node, this place may also not exist anymore
3~ 6 months agoclosedDawsZed
♦229
PS 615 is the former name of the building NE of this note. Updated building with tagging. The L-shaped building to the NE first appears on the 1966 USGS Topo Map as PS 615 (https://prd-tnm.s3.amazonaws.com/StagedProducts/Maps/HistoricalTopo/GeoTIFF/NY/NY_Flushing_138250_1966_24000_geo.tif). This building was part of the NYC BOE's city-wide "600 School" program, which served students with severe emotional and behavioral challenges during the mid-20th century (https://eric.ed.gov/?id=ED002079). It's since been re-designated as "P.S. X012 Lewis and Clark School".
1588831~ 11 years agoopenedRub21_nycbuildingsLocation of this church seems off
2~ 4 years agocommentedHuman65536
♦729
Moved tag to right building. According to Wikipedia church is now closed. I'll leave note open incase someone knows currect situation
3~ 6 months agoclosedDawsZed
♦229
The former St. Mary's Church (3649 White Plains Rd) has been demolished. Retagged area as under construction. In a NYC DOB Complaint #2408297 dated January 15 2025, the assigned inspector reported that the buildings at 3663, 3649, and 3667 White Plains Road were demolished. The lots were combined for a new building, addressed 3663 White Plains Road, which was at the foundation phase at the time of the report (https://a810-bisweb.nyc.gov/bisweb/OverviewForComplaintServlet?requestid=1&vlcompdetlkey=0003202934).
1555961~ 11 years agoopenedRub21_nycbuildingsLocation of this building seems off
2~ 9 months agocommentedMateusz Konieczny
♦37,377
why?
3~ 9 months agocommentedCurlingMan13
♦52,478
It's in reference to the node here: https://www.openstreetmap.org/node/9846981548/history It probably belongs at the school on the other side of the street.
4~ 6 months agoclosedDawsZed
♦229
This is the correct location of the school, PS 168 at Hillman Children's Center, per Streetside. Tagged and updated the building.
4920941
Category: unknown
1~ 6 months agoopenedDjqnplayground
2~ 6 months agoclosedDawsZed
♦229
Closing as duplicate of Note 4920940.
4920939
Category: unknown
1~ 6 months agoopenedDjqnyay
2~ 6 months agoclosedDawsZed
♦229
Not enough information to fix anything here. Please only add notes if there are errors or omissions with the map.
4920945
Category: unknown
1~ 6 months agoopenedDjqnlines
2~ 6 months agoclosedDawsZed
♦229
That is a breakwater, designed to prevent beach erosion. Nothing to fix here.
4920925
Category: unknown
1~ 6 months agoopenedDjqnddd eee
2~ 6 months agoclosedDawsZed
♦229
1550281~ 11 years agoopenedRub21_nycbuildingsLocation of this school seems off
2~ 2 years agocommentedCurlingMan13
♦52,478
Is it actually PS 315, mapped as the building a few feet SE/E of here?
3~ 6 months agoclosedDawsZed
♦229
Neither tag is correct, it's a charter school now. Bing Streetside from 2021 shows the current tenant is KIPP Freedom Elementary School. Socials seem active still. This building was previously home to P.S. 91 Annex, P.S. 291, and most recently, P.S. 315. In Fall 2017, P.S. 315 moved to a former church at 2865 Claflin Avenue (https://www.riverdalepress.com/stories/ps-315-moving-into-former-church,60838), and in Fall 2018, KIPP opened in this building.
1550381~ 11 years agoopenedRub21_nycbuildingsLocation of this school seems off
2~ 2 years agocommentedCurlingMan13
♦52,478
Or is it?
3~ 6 months agoclosedDawsZed
♦229
To be, or not to be! Seems like a lot of co-schools within this building have come and gone over the years, so research has been messy. What I have found is that I.S. 115 is the former name for this school per NYC DOB BISWeb (BIN 2013899), probably a remnant of a 1970s name in GNIS. The only existing school I can find at this address via NYC Gov is a middle school, "Academy for Personal Leadership and Excellence," with school number X363 (https://www.schools.nyc.gov/schools/X363). I've tagged the building with these changes.
2953001~ 11 years agoopenedemacsenIs this building reallly PS 9 Elementary? #manualsurvey
2~ 6 months agoclosedDawsZed
♦229
Yes, see Note 154984 for more information (https://www.openstreetmap.org/note/154984). Closing as resolved in another note.
1549841~ 11 years agoopenedRub21_nycbuildingsSchool is of
2~ 11 years agocommentedemacsenI think this may be PS9 #manualsurvey
3~ 6 months agoclosedDawsZed
♦229
Updated tagging to PS 9, the current name. The NYC DOB BISWeb profile for this building (BIN 2013561) lists the "DOB Special Place Name" as "P.S. 9 (OLD 115)" (https://a810-bisweb.nyc.gov/bisweb/PropertyProfileOverviewServlet?bin=2013561&requestid=1). The existing node, imported from GNIS as "Junior High School 115", is the historic name of this building. School records for JHS 115 from the NYC Municipal Archives span from 1958 to 1971 (https://a860-collectionguides.nyc.gov/repositories/2/archival_objects/623014), after which the school was likely repurposed to its present use.
551321~ 12 years agoopened---The Prizery, 700 Bruce Street, South Boston, VA 24592 Tel. 434.572.8339 A small theater with an art gallery on the lower level. More information re upcoming productions at: http://prizery.com/ Substantial discount for student tickets with current student ID
2~ 2 years agocommentedNeisBot
♦22,915
Thank you for your note. It appears to be quite old, dating back more than 10 years. We value all contributions, and to ensure the map is up-to-date, we kindly ask for your input. If there are still relevant details or updates regarding this note? Thank you! #OldNote
3~ 1 year agocommenteddannmer
♦18,756
Theater is still open according to the website
4~ 6 months agoclosedDawsZed
♦229
Added The Prizery, an events venue. Mapillary imagery from 2018 (https://www.mapillary.com/app/?pKey=322638276036165&focus=photo) shows a spired building NW of this note, with a banner labeled "The Prizery". It appears consistent with photos of the building on their active website, with ticketed events scheduled in the future. As of note closure, this was the second-oldest note in the United States.
4917298
Category: unknown
1~ 6 months agoopenedGeovelo_NotesLa chaîze le vicomte 85310 la chaîze le vicomte (This note has been created from Geovelo: https://amenagements-cyclables.fr/fr/contributions/101664)
2~ 6 months agoclosedDawsZed
♦229
Glitched note appearing at 0,0.
667081~ 12 years agoopenedctdancecenterConnecticut Dance Center 76 Viaduct Road Stamford CT, 06907 203-569-3131 www.ctdancecenter.com info@ctdancecenter.com
2~ 2 years agocommentedNeisBot
♦22,915
Hi ctdancecenter, Thank you for your note. It appears to be quite old, dating back more than 10 years. We value all contributions, and to ensure the map is up-to-date, we kindly ask for your input. If there are still relevant details or updates regarding this note? Thank you! #OldNote
3~ 6 months agoclosedDawsZed
♦229
Permanently closed, not added. Google, Yelp, MapQuest report location as closed. LLC associated with the business dissolved in 2023 per CT business records. Social media accounts dormant; calls, emails unanswered per comments.
41077961~ 2 years agoopenedJohn Gilmore
♦369
Unable to answer "What’s the structure of this bridge?" for https://osm.org/way/1187969033 via StreetComplete 55.1: These "bridges" on Pier 16 are not actual bridges, they are just gangways for walking people or cargo onto ships. Attached photo(s): https://westnordost.de/p/195851.jpg
2~ 1 year agocommentedDawsZed
♦229
I see what you mean, but I'm not really sure how to tag this better; this metal structure bridges Pier 16 with a floating pier. Maybe it could be tagged as an extension of the pier, like both a pier and a bridge?
3~ 6 months agocommentedCurlingMan13
♦52,478
Pier and bridge would be acceptable. We also don't really have to get specific with the tagging. It can be left as a generic bridge. That is 100% acceptable.
4~ 6 months agoclosedDawsZed
♦229
I'll leave this as is, it's consistent with how many of the other gangway bridges in this area are already mapped out. I'll add a few details to close this out.
4910688
Category: StreetComplete
1~ 6 months agoopenedCurlingMan13
♦52,478
Dog park here. via StreetComplete 61.2
2~ 6 months agoclosedDawsZed
♦229
Already mapped as Parks Dog Run.
4882198
Category: Organicmaps
1~ 7 months agoopenedGarrincha44"Restaurant momofuku" OSM snapshot date: 2025-07-08T15:45:36Z POI name: Pier 17 POI types: building wheelchair-yes #organicmaps ios
2~ 6 months agocommentedCurlingMan13
♦52,478
Site surveyed. No restaurant named "Momofuku" found here.
3~ 6 months agoclosedDawsZed
♦229
4787156
Category: unknown
1~ 9 months agoopenedAkimt106
♦3
The footpath at Community Island Pond is not publicly accessible. It is a privately operated helipad that is gated.
2~ 6 months agocommentedCurlingMan13
♦52,478
Correct. Needs to be updated to access=private
3~ 6 months agoclosedDawsZed
♦229
Updated to access=private, thanks Akimt and CurlingMan.
4386172
Category: unknown
1~ 1 year agoopenedivanbranco
♦12,461
https://commons.wikimedia.org/wiki/Category:Bogardus_Building_(19_Fulton_Street) is its name Bogardus Building?
2~ 1 year agocommentedDawsZed
♦229
This building is a modern homage (built 1983) of the demolished Bogardus Building/Edgar Laing Stores (1849-1971), but it's not an exact replica nor at the same location. The South Street Seaport Museum lists this as "New Borgadus Building", and a few other online sources call this the "Borgadus Building". There isn't any signage giving this name from images though, so I feel like this may be more of a local name than an official name?
3~ 6 months agocommentedCurlingMan13
♦52,478
Local name or historical name. I believe there is a tag for historical name. At the very least, the info should be added to description of building.
4~ 6 months agoclosedDawsZed
♦229
Thanks CurlingMan; added info from notes into historic, local names, and the description.
4454300
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Route 35 Redevelopment construction
2~ 1 year agocommentedCurlingMan13
♦52,478
Do you have any update? And do you know what is being built here?
3~ 1 year agocommentedDaitruxdd
♦145
looks to be a self storage complex
4~ 1 year agocommentedDawsZed
♦229
I saw this place a few days ago, the steel structure for maybe 3 buildings are up, fenced off with lots of construction vehicles
5~ 1 year agocommentedCurlingMan13
♦52,478
Any update? Would you be able to add the buildings based on your local survey?
6~ 1 year agocommentedDawsZed
♦229
Still under construction, added the buildings I saw when I visited here yesterday: https://i.imgur.com/kWd4I3Y.png https://i.imgur.com/xiWDFVg.png
7~ 10 months agocommentedCurlingMan13
♦52,478
Added shop=storage_rental Do you know what brand?
8~ 10 months agocommentedDaitruxdd
♦145
Not sure at the moment. Will update when I know
9~ 7 months agocommentedDawsZed
♦229
From survey today, appears to be a SecureSpace Self Storage facility. Opens August 28, 2025 per earliest website booking date (https://securespace.com/storage-units/nj/south-amboy-self-storage/1970-nj-35-south-amboy-nj-08879). Updated tagging.
10~ 6 months agocommentedCurlingMan13
♦52,478
Is it open yet? Can note be closed since no further action is required?
11~ 6 months agocommentedDaitruxdd
♦145
not sure if it’s open yet but there wasn’t any construction going on as of last week. Note can be closed and construction area removed/building tags updated
12~ 6 months agoclosedCurlingMan13
♦52,478
updated status of building. Fixed storage unit tagging. left note on C/S.
4599509
Category: unknown
1~ 1 year agoopened---"Multipurpose Community Venue" Looks like it will be located right here https://online.flippingbook.com/view/482650546/2/
2~ 1 year agocommentedDawsZed
♦229
Added construction area since groundbreaking has started on this area (https://www.middlesexcountynj.gov/Home/Components/News/News/1598/148)
3~ 1 year agocommentedCurlingMan13
♦52,478
Were the buildings demolished? If so, they should be tagged as demolished or removed.
4~ 11 months agocommentedCurlingMan13
♦52,478
Any update on if building is still standing? Or since construction area was tagged, should note be marked as resolved since all info is already incorporated? We don't use notes as personal bookmarks and close it when there is no further info to add.
5~ 11 months agocommentedDawsZed
♦229
I'm not usually around this area, but I can drive out this weekend and survey the different buildings on campus. After that, yeah, the issue is resolved and no further to add for now.
6~ 11 months agoclosedDawsZed
♦229
Buildings not demolished from survey (at least, not yet). Update construction area to resolve note.
7~ 11 months agoreopenedDaitruxdd
♦145
8~ 10 months agocommentedCurlingMan13
♦52,478
Has building been demolished yet?
9~ 8 months agocommentedCurlingMan13
♦52,478
It looks like the building was demolished but no update or response was provided to my question on this note...
10~ 7 months agocommentedDawsZed
♦229
Added new buildings seen under construction in survey this morning. Demolished buildings, roads, and updated construction boundaries.
11~ 4 months agocommentedCurlingMan13
♦52,478
Is construction complete?
4448092
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
new roundabout is being built here, leaving note as a reminder to update area as construction progresses.
2~ 1 year agocommentedCurlingMan13
♦52,478
Any update on construction progress?
3~ 1 year agocommentedDaitruxdd
♦145
someone has been updating the roads so everything looks accurate as of the time I'm writing this.
4~ 1 year agocommentedDawsZed
♦229
That someone is me! Survey today looks like the forest area for the roundabout area has been cleared and graded flat with gravel, but otherwise no curbs or pavement yet.
5~ 11 months agocommentedCurlingMan13
♦52,478
Any update on construction?
6~ 11 months agocommentedDaitruxdd
♦145
Doesn’t look like there’s been much going on recently
7~ 11 months agocommentedDaitruxdd
♦145
updated the driveways to be separate
8~ 11 months agocommentedDaitruxdd
♦145
updated road layout based on survey
9~ 10 months agocommentedCurlingMan13
♦52,478
Any update on construction?
10~ 10 months agocommentedDaitruxdd
♦145
Surveyed last weekend. Not much going on. Construction is pretty slow at the moment
11~ 9 months agocommentedDaitruxdd
♦145
surveyed today. an outline of new road layout is starting to take shape with the center and splitter islands starting to appear along with curbs and sidewalks
12~ 9 months agocommentedCurlingMan13
♦52,478
updated last_checked=* to 2025-05-25 based on your note
13~ 7 months agocommentedDaitruxdd
♦145
Surveyed today 6/13/25 Roundabout is now open to traffic however there is still continuing construction going on in the area
14~ 7 months agocommentedDawsZed
♦229
Ran a GPS trace today of the new alignment, added the new traffic circle to the map (https://www.openstreetmap.org/?mlat=40.39915048&mlon=-74.02323302&display-gpx=12020122).
15~ 7 months agocommentedCurlingMan13
♦52,478
What further construction is there that would prevent resolution of this note?
16~ 7 months agocommentedCurlingMan13
♦52,478
Any update on what additional mapping is required?
17~ 7 months agocommentedDawsZed
♦229
Honestly, this is practically done. Valley Drive's approach is not yet permanent (outlined with cones), and there's a telephone pole in the roundabout. Yet, the final alignment of the roads and center island are done, it matches the final blueprints I've seen online. Nothing else missing or incorrect, future imagery and future removal of the construction area aside.
18~ 7 months agoclosedDawsZed
♦229
4421541
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
leaving a note as a reminder to update area once new bridge is built.
2~ 1 year agoclosedAgadez k
3~ 1 year agoreopenedAgadez k
4~ 1 year agocommentedDawsZed
♦229
Current schedule for USCG boat clearance advisories ends in May 2025, I anticipate the new bridge might open around that time (https://www.rumsonseabrightbridge.com/wp-content/uploads/2024/11/S32-CSS-PublicNoticeChannelClosures-update110824rev.pdf).
5~ 1 year agocommentedCurlingMan13
♦52,478
updated bridge supports here where visible.
6~ 1 year agocommentedCurlingMan13
♦52,478
added date (2025-05) to expected completion date tags for roadway and construction area. This serves as a good reminder when using filters to check if construction is complete and is easier to filter/search than notes.
7~ 10 months agocommentedCurlingMan13
♦52,478
Any update on construction progress?
8~ 10 months agocommentedDaitruxdd
♦145
Bridge looks almost complete. I’d expect to to be open in the coming months
9~ 10 months agocommentedDawsZed
♦229
Here's hoping it will, the project site has USGS closings out until the end of this month now; full project completion (including demolition, opening of new span might be sooner) by Spring 2026.
10~ 9 months agocommentedCurlingMan13
♦52,478
Seems both spans are open. Please update accordingly. https://www.rumsonseabrightbridge.com/channel-and-bridge-opening-information-as-of-tuesday-may-27-2025/
11~ 9 months agocommentedDawsZed
♦229
The channel opening notices are about how they open different spans (left, right, both) of the old and new bridge during construction to allow different heights of boat traffic underneath the spans. From survey today, the new bridge is indeed operable now, paved both ends with traffic lights installed on Ocean Avenue, but it's still closed for construction.
12~ 9 months agocommentedDawsZed
♦229
https://pixvid.org/images/2025/05/29/PXL_20250529_143250286.jpg
13~ 8 months agocommentedCurlingMan13
♦52,478
Any update on whether they switched traffic over to cross new brodge or not yet?
14~ 7 months agoclosedDawsZed
♦229
The new bridge is now open to vehicles and pedestrians (https://www.rumsonseabrightbridge.com/new-bridge-open-to-vehicles-and-pedestrians/). Moved over the roadways to keep history.
15~ 7 months agoreopenedCurlingMan13
♦52,478
Is the other span being removed or just reconstructed such that there will be two bridges? If being removed, construction isn't really the best lifecycle tag. Recommend lifecycle prefix "disused:" or "abandoned:" or "demolished:"
16~ 7 months agocommentedDawsZed
♦229
Good catch with the tagging, the other bridge is indeed being demolished within the next year. I'll update the tagging. Otherwise I think we're alright to close this?
17~ 7 months agoclosedDawsZed
♦229
4690337
Category: unknown
1~ 11 months agoopenedDaitruxdd
♦145
bridge MT-19 Replacement. closed for the next 6 months
2~ 10 months agocommentedCurlingMan13
♦52,478
Did it just start? So reopening would be September 2025?
3~ 10 months agocommentedDaitruxdd
♦145
Sounds about right
4~ 10 months agocommentedCurlingMan13
♦52,478
Readded type of road/classification to road that was removed.
5~ 7 months agoclosedDawsZed
♦229
Opened yesterday, removed construction area and tagging.
4673692
Category: unknown
1~ 11 months agoopenedcrystalwalrein
♦89
This is no longer an active landfill but a solar farm. The landfill north of Delilah Road should still be active. I will survey this week to see if this is still the case.
2~ 8 months agocommentedCurlingMan13
♦52,478
But this is a former landfill, correct?
3~ 7 months agoclosedThereal0000000000
4~ 7 months agoreopenedCurlingMan13
♦52,478
5~ 7 months agocommentedCurlingMan13
♦52,478
User is vandalizing map and closing notes without taking action or providing comment. They have a previous block for this exact thing and have been reported to DWG for further action.
6~ 7 months agoclosedDawsZed
♦229
Yeah, this looks like a former landfill closed in the 1980s (https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.Cleanup&id=0200614). The Atlantic County Landfill is open per websites - fixed the unclosed area preventing rendering there.
4769024
Category: unknown
1~ 9 months agoopenedCurlingMan13
♦52,478
Parking lot areas need to all be merged here.
2~ 7 months agoclosedDawsZed
♦229
Combined the parking lots, thanks for the note.
7517001~ 9 years agoopenedDelalay JohannaCharming charlie, magasin d'accessoires (OSM data version: 2016-06-20T05:57:02Z) #mapsme
2~ 8 months agoclosedDawsZed
♦229
Not added, Charming Charlie filed for bankruptcy and closed all stores in 2019, and again in 2022 after a comeback attempt. They currently do not have any physical locations. The French phrase "Charming charlie, magasin d'accessoires" translates to "Charming Charlie, accessories store."
4713650
Category: unknown
1~ 10 months agoopenedDaitruxdd
♦145
Sansone Jr's Keyport Kia - new dealership under construction
2~ 10 months agocommentedCurlingMan13
♦52,478
added brand tags and shop=car to construction area.
3~ 9 months agocommentedCurlingMan13
♦52,478
Added building. Tagged as closed since you still have it marked as construction zone. Removed dealership tag from construction zone and added to building.
4~ 9 months agocommentedCurlingMan13
♦52,478
Is it a different building than the one already on imagery?
5~ 9 months agocommentedDaitruxdd
♦145
Im not sure honesty
6~ 9 months agocommentedCurlingMan13
♦52,478
I only ask since the building that is mapped looks pretty new. What makes you say there is construction? is it fenced?
7~ 9 months agocommentedDaitruxdd
♦145
There were construction vehicles and equipment present and the site was fenced off and a big billboard up the road stated that it’s coming soon. It’s possible that construction has finished now as it was pretty close to completion last time I drove past. If construction is completed and the building is mapped the note can be closed
8~ 8 months agoclosedDawsZed
♦229
Confirmed open by survey today. Added information to building, remove construction area.
17322891~ 6 years agoopenedAngel CostoyaTela para futon y otros (OSM data version: 2016-06-20T05:57:02Z) #mapsme
2~ 8 months agoclosedDawsZed
♦229
Changed Mood Fabrics to a fabric store instead of a tailor, and moved into correct building (instead of on the street).
8044111~ 9 years agoopenedSangrilMood fabrics (OSM data version: 2016-07-15T17:38:02Z) #mapsme
2~ 8 months agoclosedDawsZed
♦229
Store was added 2016-07-17 by Angel Costoya in Changeset #40798771. Moved node from street to building and tagged as fabric store.
2774041~ 11 years agoopenedemacsenIs this Public School 78 or Public School 206?
2~ 8 months agoclosedDawsZed
♦229
Removed PS 78, as it was demolished in the early 1970s. This is the last open note from 2014 in Manhattan! There are two existing schools sharing the same building here, PS 112 (https://www.schools.nyc.gov/schools/M112) and PS 206 (https://www.schools.nyc.gov/schools/M206). Former students and residents confirm that the building for PS 78, a castle-like building designed by C.B.J. Snyder, was demolished in the early 1970s (https://harlembespoke.blogspot.com/2010/08/blog-post.html).
1614731~ 11 years agoopenedediyes
♦199
Location of this school seems off
2~ 8 months agoclosedDawsZed
♦229
Turned into area and incorporated the node, but otherwise correct and existing as of 2021 Streetside, 2023 aerial imagery.
1614751~ 11 years agoopenedediyes
♦199
Location of this school seems off
2~ 1 year agocommentedRobin Zyx
♦55
PS 103 was located here, apparently for many decades. Apparently torn down, as the building at 1831 Madison dates to 2001.
3~ 8 months agoclosedDawsZed
♦229
Removed, the building for PS 103 was demolished 1974-1983. Novelist Henry Roth's former elementary school (https://harlembespoke.blogspot.com/2011/11/remember-119th-and-madison-circa-1898.html), PS 103 located at 49 East 119th Street (https://ephemeralnewyork.wordpress.com/2013/08/19/a-dazzling-relic-of-an-old-city-school-building/), was closed during the NYC fiscal crisis of the 1970s to 1980s. Its district in Central Harlem experienced the largest decline in schools in Manhattan between 1974 and 1983, as buildings considered underutilized or too expensive to maintain were shuttered or demolished (https://ansleyerickson.github.io/book/chapters/11/).
4736290
Category: unknown
1~ 10 months agoopenedDaitruxdd
♦145
station bay phase II under construction
2~ 9 months agocommentedCurlingMan13
♦52,478
Seems it should be apartments... Added tag: landuse=construction
3~ 8 months agocommentedDaitruxdd
♦145
The building is now called ”The pearl at Station Bay” and it looks to have been completed. I’m not 100% certain tho so a survey is necessary before construction tag can be removed and note is closed out
4~ 8 months agoclosedDawsZed
♦229
Confirmed name by survey tonight, close out construction as building looks complete. Added rough outline of building, which can be further refined later as new imagery eventually comes out.
4471672
Category: unknown
1~ 1 year agoopened---RWJ/Barnabas Health Site
2~ 1 year agocommentedDawsZed
♦229
The RWJ Barnabas Health website does not list any clinics at the location of this note. However, the website for this plaza (https://connect.regencycenters.com/glenwood-green) lists an "on-site ambulatory care center, operated by Rendina Healthcare"
3~ 1 year agocommentedDaitruxdd
♦145
I believe the site is under construction. that's probably why it is not appearing on the website yet
4~ 1 year agocommentedDaitruxdd
♦145
marked construction site.
5~ 1 year agocommentedDawsZed
♦229
Yeah fair point, I was here a few days ago, and I see signs for RWJ Barnabas; the building and parking lot looks done but it's still fenced off, I guess it's interior work now
6~ 11 months agocommentedCurlingMan13
♦52,478
Has the construction area been correctly added? Is construction on the outside complete? Is parking lot road construction complete? What other details are missing?
7~ 11 months agocommentedDaitruxdd
♦145
Not sure will survey when I get the chance
8~ 11 months agocommentedDawsZed
♦229
From my survey three months ago, the exterior was finished, and the parking aisles were complete. I'll tag the building as a generic structure, and the finished roads with access=no for now.
9~ 11 months agocommentedCurlingMan13
♦52,478
Access=no should only be used if there are barriers preventing access. If anyone can drive in there, access=no is the wrong tag.
10~ 11 months agocommentedDawsZed
♦229
My bad, you're right, it's not entombed inside fencing for construction vehicles. Sorry for the trouble, fixed the access tags.
11~ 10 months agocommentedCurlingMan13
♦52,478
Any update on tags? Just checking in to try to address notes where possible.
12~ 9 months agocommentedCurlingMan13
♦52,478
Has construction been completed and fencing taken down?
13~ 8 months agoclosedDawsZed
♦229
Surveyed tonight, construction is done, fencing is down. Updated this and surrounding amenities.
4736293
Category: unknown
1~ 10 months agoopenedDaitruxdd
♦145
Riverton development under construction
2~ 10 months agocommentedCurlingMan13
♦52,478
Area already marked as a construction zone. Roads roughly added. What is the estimated completion date?
3~ 10 months agocommentedDaitruxdd
♦145
Not sure. Work had been pretty slow So far only the bass pro shop building can be seen starting to take shape. Theres a lot more planned for the project so it probably gonna be a few years at least
4~ 9 months agocommentedDaitruxdd
♦145
added a rough outline of the Bass pro shop
5~ 8 months agocommentedDawsZed
♦229
Thanks for adding the Bass Pro Shop, I just saw it under construction recently too. This construction site has been pushing dirt around since 2009, it's great there's finally some tangible progress here. Here's their current progress document, in the About section of their website: https://riverton.com/wp-content/uploads/2025/05/2025-Riverton-Brochure-Rev-5.5.25.pdf The phasing diagram suggests about half the land developed by 2029. Over the years, they've been routinely pushing back these estimates. I don't consider them trustworthy, the Bass Pro Shop was expected to open a decade ago, then 2018, then they went silent until now.
6~ 7 months agoclosedThereal0000000000
1453281~ 11 years agoopenedRub21_nycbuildingscan't found the address.
2~ 11 years agocommentedRub21_nycbuildingscan't found the address of school
3~ 8 months agoclosedDawsZed
♦229
Added two nodes at 511 West 148th Street to resolve note. The Manhattan Bible Institute shares the building at 511 West 148th Street along with the church, the Manhattan Holy Tabernacle, both given by BIN #1062029. Disambiguated by tagging both as separate entities at the same address.
1325991~ 12 years agoopenedRub21_nycbuildingsLocation of Stern College Yeshiva University is off
2~ 4 years agocommentedHuman65536
♦729
Moved to 245 Lexington Ave. Also changed tag from school to college. I'm leaving note open as this still lacks correct isced-level and confirmation whether amenity=college or amenity=university should be used.
3~ 8 months agoclosedDawsZed
♦229
Added 2011 ISCED level to a new college grounds area and tagged buildings as amenity=college. Stern College is the undergraduate school for women within Yeshiva University, so amenity=college should be used. It also offers up to a Bachelor-level education, so I've tagged it as isced:2011:level=bachelor.
1613951~ 11 years agoopenedediyes
♦199
Location of this church seems off
2~ 1 year agocommentedRobin Zyx
♦55
I have found one reference that this church was torn down in 2007, but haven't been able to otherwise confirm.
3~ 8 months agoclosedDawsZed
♦229
Moved the node over, tag as address, add nearby features to resolve. The location of the former church is the overgrown lot to the east of this node per NYC ACRIS, which was demolished in 2007 per Wikipedia (https://en.wikipedia.org/wiki/St._Johannes_Kirche_(New_York_City)). This note is placed in the parking lot of a plumbing supply company.
1326991~ 12 years agoopenedRub21_nycbuildingsRiver House , is in 435 East 52nd Street,http://en.wikipedia.org/wiki/River_House_(New_York_City)
2~ 1 year agocommentedCurlingMan13
♦52,478
This node needs to be moved into or merged with this buildong. https://www.openstreetmap.org/way/265449468
3~ 8 months agoclosedDawsZed
♦229
River House is the large apartment complex to the east of this note. Combined tagging from the node and the building and merged them into the building; added the standalone node to the building way.
1319531~ 12 years agoopenedlxbarth_nycbuildingsAre this road+adjacent addresses 31st Place or 31st Street?
2~ 8 months agoclosedDawsZed
♦229
The correct addresses here are given as "31st Place". The imported address nodes are correct, fixed the name of the road to resolve. A deed from the NYC Office of the City Register, dated 2008-05-18 for a building on this street, is listed as "31st Place" (https://a836-acris.nyc.gov/DS/DocumentSearch/DocumentImageView?doc_id=2008061700336001). A mortgage for the hotel lot, dated 2023-08-10, also lists the same street name (https://a836-acris.nyc.gov/DS/DocumentSearch/DocumentImageView?doc_id=2023081800178006).
1319541~ 12 years agoopenedlxbarth_nycbuildingsWhere is Aviation High School exactly situated?
2~ 11 years agocommentedHelpistHey I have added Aviation Highschool to the right of this note. That is the High School; please go ahead and fix the tracing if needed. It is very hard to trace because of the shadowing and I tried to quickly do the best I could at the corners. Also the remaining areas where the aircraft is, and around the circular part of the building may be added as "amenity=school" right? go ahead and do that if so. Add missing info as well! thanks
3~ 11 years agocommentedlxbarth
♦129
I see the new building 35 and 36 - so that's the school, right? Is the building between 24 and 35 the school, too? It's never building=yes/amenity=school but always building=school, btw. This is weird, but true.
4~ 11 years agocommentedHelpistbetween 35th & 36th is the school. between 34th and 35th is something called "Queenns Boulevard Associates" Phone: +1 718-937-1539 and on the second floor its an "NYC DOT Parking Card Unit" https://a841-dotwebpcard01.nyc.gov/ParkingCards/support/
5~ 11 years agocommentedHelpistIm going to edit the highschool a bit, I passed by again and i saw it in finer detail. Lol i want to get a good tracing.
6~ 8 months agoclosedDawsZed
♦229
Closing as previously resolved. School building was added 2014-04-10 by Helpist in Changeset #21615812. Deleted and re-imported 2014-05-08 by Rub21_nycbuildings in Changeset #22219182, which is present today.
9542251~ 8 years agoopened---Rise New York
2~ 8 months agoclosedDawsZed
♦229
Rise no longer exists, but I've added Spectrum, the most prominent storefront at this location. Rise was a global community and accelerator program established by Barclays for the financial technology services sector. A flag for this program can be seen in a 2021 Streetside panorama. Barclays announced the closure of this program in January 2025, for mid-2025. Websites pointing to the program no longer exist.
6434391~ 9 years agoopenedfjredondoSerendipity 3 (OSM data version: 2016-07-15T17:38:02Z) #mapsme
2~ 8 months agoclosedDawsZed
♦229
Closing as previously resolved. Restaurant was added 2016-08-16 by Burmick in Changeset #41483010. Thank you for the note, seems to have helped Burmick not too long after.
1326061~ 12 years agoopenedRub21_nycbuildingsDifferent address in church, the church is 209 but import layer is 205
2~ 8 months agoclosedDawsZed
♦229
NY DOB lists this church as occupying 205-207, with the adjacent parish home to the north as 209. The primary address of the church, however, is 205 (http://a810-bisweb.nyc.gov/bisweb/PropertyBrowseByBBLServlet?allborough=1&allblock=865&alllot=19&go5=+GO+&requestid=0). Added a node and updated the addresses for this and the adjacent building.
39408421~ 2 years agoopened---This building was demolished in August-October of 2023.
2~ 8 months agoclosedDawsZed
♦229
Tagged building as demolished as seen in Bing imagery dated Feb-Aug 2023. Also remove tagging on storefronts but preserved addresses. Seems to be a high-rise apartment building or similar under construction here via Mapillary.
4771891
Category: unknown
1~ 9 months agoopenedmilet
♦728
Check access restrictions of High Line. When I was there in September 2024, the High Line path was completely open to the public. I guess the access restrictions here are outdated and it is still open.
2~ 8 months agoclosedDawsZed
♦229
Same here, I was here maybe early/mid 2024 and it was open as well. Wikimedia photo says it was only to close during Q4 2023-Q1 2024 (https://commons.wikimedia.org/wiki/File:The_northern_end_of_the_High_Line_is_closed_during_2023.jpg), and we're past that. Updated the access tagging and removed notes about closure.
4786494
Category: unknown
1~ 9 months agoopenedEneaSuper
♦473
Is there by any chance a statue dedicated to beggars here? https://youtu.be/s3tRDXGer_8?t=1692
2~ 8 months agoclosedDawsZed
♦229
Yes, Bing Streetside shows a statue here. Appears to be a bronze statue depicting Jesus experiencing homelessness, opening his hand from under a cloth. Added using the artist's website and a news article.
4762944
Category: unknown
1~ 9 months agoopenedO-dog-Malakai
♦318
Can the speed limit be changed from 60 mph to 55 mph north of this bridge?
2~ 9 months agocommentedCurlingMan13
♦52,478
But I don't see any speed limit signs near here?
3~ 9 months agocommentedO-dog-Malakai
♦318
So how it works is that there is a link below indicating that when a speed limit sign is variable meaning that it is dynamic and electronic, the "maxspeed" = "signals" tag can be replaced with "maxspeed:variable" = "yes" and add in the default speed limit as seen in the second source. First Source: https://wiki.openstreetmap.org/wiki/Key:maxspeed:variable Second Source: https://www.law.cornell.edu/regulations/new-jersey/N-J-A-C-19-9-1-2
4~ 9 months agocommentedCurlingMan13
♦52,478
Ah, gotcha. Yeah all of TPKE is variable, well, at least this area. I can update later to add variable speed limit tags. I thought you were asking/suggesting changing it from 60 to 55. I've seen this area as 45mph before. Actually, usually 45 due to traffic. Lol
5~ 9 months agocommentedDaitruxdd
♦145
according to the straight line diagram Tremley Point Road in Linden is where the speed limit changes from 65 to 55 going north. source: https://njsld.org/NJDOT/SLD/SheetViewer/00000095__/51/4
6~ 9 months agocommentedCurlingMan13
♦52,478
Daitruxdd, You linked to the truck lanes, and this note is more for the car lanes. While that it moght be the same, they aren't due to truck traffic and merging lanes. Furthermore, there are no speed limit signs near here, making it a bit more difficult. You would need to check signage from there going north through here. I thought the SL was faster than 55 north to here. Again, we will need to check inagery to confirm. Mapillary has a great signage filter that allows easy viewing of speed limits without having to sort through all the images.
7~ 9 months agocommentedDaitruxdd
♦145
The SDL diagram clearly shows that the speed limit is 55 north of the segment provided in both directions for both the inner and outer roadways. Variable speed limits signs exist on this segment to adjust the speed limits based on conditions such as traffic, accidents or construction when needed. The road should be tagged as 55mph as that’s the “official” speed limit. An additional tag may be used to indicate that the speed limit is variable and subject to change if conditions make it necessary
8~ 8 months agocommentedDawsZed
♦229
The variable speed limit signs on the NJTP are mounted overhead with variable message boards - there's actually one just south of this note (https://www.mapillary.com/app/?pKey=370806464471016&focus=photo). As Daitruxdd found, the SLD shows the 65 -> 55 reduction begins much further south, near Tremley Point Road, and extends all the way north to the GWB. Checking Mapillary near Tremley, imagery does show 55 for both NB sides on a good day (https://www.mapillary.com/app/?pKey=527166115250771&focus=photo), and it's outlined in yellow to emphasize the start of reduction (https://www.mapillary.com/app/?pKey=1801176037332516&focus=photo). Poked at a few more NB signs north of here and they all look to be set to 55 as well. Here at the Eastern spur (https://www.mapillary.com/app/?pKey=2942351499330665&focus=photo), Western spur (https://www.mapillary.com/app/?pKey=286467283179373&focus=photo) and nearing the GWB (https://www.mapillary.com/app/?pKey=484115809679935&focus=photo).
9~ 8 months agocommentedO-dog-Malakai
♦318
Great discussion. Should I go ahead and change the speed limit from 60 mph to 55 mph on this road or keep it 60 mph?
10~ 8 months agocommentedDawsZed
♦229
Feel free to set the default speed limit to 55mph, I feel the evidence supports that for NJTP north of Tremley Point Road (40.611903, -74.223569).
11~ 5 months agoclosedCurlingMan13
♦52,478
Updated from Tremley Point Road to the 95-80 junction. Added maxspeed=55mph and maxspeed:variable=yes
4726092
Category: unknown
1~ 10 months agoopenedDawsZed
♦229
The Davis Center opens to the public April 26, 2025; paths within this construction zone need resurveying for alignment.
2~ 9 months agoclosedDawsZed
♦229
Has since been updated and detailed by kguenther24 in their changesets on March 6, 2025. Many thanks!
40363261~ 2 years agoopenedAntiCompositeNumber
♦342
Re-survey maxheight & bridge details after pedestrian bridge replacement
2~ 1 year agocommenteddannmer
♦18,756
has this been re-surveyed?
3~ 1 year agocloseddannmer
♦18,756
No response, no mappable info
4~ 1 year agoreopenedAntiCompositeNumber
♦342
5~ 1 year agocommentedAntiCompositeNumber
♦342
There's a new bridge. I don't know what the hight is. I'm not in the area and can't check myself, so I opened a note. That is what notes are for. Please don't close notes just because you can't fix them from your armchair.
6~ 9 months agocommentedDawsZed
♦229
Added the bridge and pedestrian ramps using NAIP imagery, but still don't know the max_height, as I'm not local here either and none of the street-level photos show signs for it.
7~ 4 months agocommentedCurlingMan13
♦52,478
I checked NJ DOT records, and their records have similarly not been updated. https://njsld.org/NJDOT/SLD/VideoLog/00000080__/56.821/P https://njsld.org/NJDOT/SLD/VideoLog/00000080__/56.864/S
4768947
Category: unknown
1~ 9 months agoopenedCurlingMan13
♦52,478
split road here due to barrier that was installed to prevent left turns in/out of Dunkin.
2~ 9 months agocommentedDawsZed
♦229
Added the bollards, split the ways, this time didn't forget to attach the relations and u-turn restrictions. Feel free to take a look and close this out.
3~ 9 months agoclosedCurlingMan13
♦52,478
All looks good. Thanks for updating. Feel free to close if you think you're complete - no need to keep the note open.
4395411
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Area under development, Stavbro Lane closed until November 2024
2~ 1 year agocommentedDaitruxdd
♦145
https://images1.loopnet.com/d2/acvTa1sUHPZu4WlJL6mcELvt2rfvMw8WYKrZmBvn9dg/Overall%20Site%20Layout%20Plan%20Pages%20from%20WCW%20Civil%20Plans%2061423%201%20of%203%20.pdf?_gl=1*zpblqf*_gcl_au*MTI4NjA1MjU4Mi4xNzI0NDQxNDg3*_ga*MTAzOTMwNDc2LjE3MjQ0NDE0ODg.*_ga_2DVXTE8M0Q*MTcyNDQ0MTQ4Ny4xLjEuMTcyNDQ0MTYxNS4xNy4wLjA.
3~ 1 year agocommentedDaitruxdd
♦145
Marked off the area as under construction and changed the road geometry.
4~ 1 year agocommentedCurlingMan13
♦52,478
Any update on this? November 2024 has passed. Generally I don't do an intermediary and mark it as closed since even when it is fully reopened, it might show closed for many months on other navigation applications.
5~ 1 year agocommentedDaitruxdd
♦145
it was still closed last time checked a few weeks ago. might be opened now.
6~ 1 year agocommentedDawsZed
♦229
Surveyed today, not open. Pavement is down, but no striping and it's not connected with the roadway. There's still signs and a concrete curb in the middle of where it's meant to connect with the existing road.
7~ 1 year agocommentedDaitruxdd
♦145
Road is still not open as of today. multiple buildings can be seen and some look almost complete
8~ 11 months agocommentedCurlingMan13
♦52,478
Any update on road status?
9~ 11 months agocommentedDawsZed
♦229
I pass by here often; jersey barriers block the road, but it's graded/connected with Wayside now. My hunch is they won't open it until the retail tenants open. Also agree with seeing buildings too, I'll add those from memory.
10~ 10 months agocommentedCurlingMan13
♦52,478
Any update on road status?
11~ 10 months agocommentedDaitruxdd
♦145
Surveyed last weekend. Road was still closed
12~ 9 months agocommentedCurlingMan13
♦52,478
Updated road to last checked date of 5/1/2025. left building last check date from February with construction tag(s)
13~ 9 months agocommentedDawsZed
♦229
From survey today, the jersey barriers are gone, "through" lane markings are paved on the GSP off-ramp, and the road is only coned off now. Added road classifications and set access to private.
14~ 9 months agocommentedCurlingMan13
♦52,478
Are the roads private access meaning only a few specified people can access, or is it ownership=private meaning it is privately owned and maintained? If access=private is used, then routers will not use it, even if a customer/client has entered a destination here.
15~ 9 months agocommentedDawsZed
♦229
The first one - there aren't any public accommodations in this lot open right now, and the road is paved but coned off. My impression is that only construction contractors are allowed to use this road while building interior work is done. It's in this "in-between" phase where the road itself is not really under construction/being paved anymore, but it also isn't open to public use yet? I'm open to reverting this back if I jumped the gun on the tagging here, sorry for the hassle.
16~ 7 months agoclosedThereal0000000000
4762988
Category: unknown
1~ 9 months agoopenedCurlingMan13
♦52,478
road needs to be divided here due to physical barrier (island)
2~ 9 months agoclosedDawsZed
♦229
Done, thank you for the note. Separated roads, moved in tagging and relations. Ditched the 7-Eleven restriction relations as it's implicit now, also separated the amenity=school from the road.
3~ 9 months agoreopenedCurlingMan13
♦52,478
Don't forget to add turn restrictions where road splits and rejoins.
4~ 9 months agoclosedCurlingMan13
♦52,478
Resolved.
4726586
Category: StreetComplete
1~ 10 months agoopenedISSOtm
♦84
This is becoming a skyscraper now, but its definitely not a parking lot anymore via StreetComplete_ee 60.3
2~ 9 months agoclosedDawsZed
♦229
Thank you for posting this note, it looks like JozefM took care of this issue about 9 days after you posted (osm.org/changeset/165766680), so all credits to them for resolving this. Cheers!
4604601
Category: unknown
1~ 1 year agoopenedDorneyLake123
♦6,074
If the dodecahedron building (Fort Wood?) is mapped as the Statue of Liberty (1) then what does this second artwork_type=statue (2) represent ? (1) https://www.openstreetmap.org/way/32965412 (2) https://www.openstreetmap.org/way/433053921/history Sorry if this has already been discussed and consensus reached, it just seems to me that the building should not be tagged as a statue, nor a statue as a building or as it's plinth for that matter. Also "Liberty Enlightening the World" is tagged as alt_name and official_name , presumably one of these is incorrect?
2~ 1 year agocommenteddannmer
♦18,756
Openstreetmap has a community forum where questions like this are far more likely to be answered. Here's the link to the forum: https://community.openstreetmap.org
3~ 9 months agoclosedDawsZed
♦229
Agree with dannmer. Given the subjectivity in interpreting the building, statue/monument, and name tagging here, this would benefit from a broader discussion on the OSM Community Forum to reach a consensus. I'm closing this note to encourage that discussion to take place there.
4506990
Category: unknown
1~ 1 year agoopenedrittoch
♦29
The user left feedback that NJPAC Lot C doesn't exist. Could you confirm it? #mapbox_feedback
2~ 10 months agoclosedDawsZed
♦229
Correct, this lot is demolished and will become "The Cooperman Family Arts Education and Community Center", expected to complete in 2027 (https://www.njpac.org/press/transforming-njpacs-campus/). Demolished the lot and added the construction area.
4506989
Category: unknown
1~ 1 year agoopenedrittoch
♦29
The user left feedback that NJPAC Lot A doesn't exist. Could you confirm it? #mapbox_feedback
2~ 10 months agocommentedDawsZed
♦229
Lot A is temporarily closed until 2026 (https://sites.google.com/a/njpac.org/technicalpacket/driving-parking) for construction of high/midrise and townhouse buildings on site (https://drive.google.com/drive/folders/1Pwv8TcIfNwVOfyeDOkSYGstrpv68dxyu). Will add the construction site and tag the lot as appropriate.
3~ 9 months agocommentedrittoch
♦29
Thanks for the information and your edits. Have a good day!
4~ 5 months agocommentedGarren19607
♦12
That is correct, NJPAC has started a redevelopment project called Artside and that lot doesn't exist for now.
5~ 2 months agoclosedGarren19607
♦12
4490689
Category: unknown
1~ 1 year agoopenedneuerorcasillasNew community center building was constructed here, with several paths rerouted.
2~ 1 year agocommentedjhaluska80
♦3,014
Added it based off NAIP imagery. Some renderings in the articles I found online showed a roof and possibly a road that goes under it. Unfortunately I can't tell where it goes based off the current aerial.
3~ 10 months agocommentedDawsZed
♦229
Added a possible service road and footpaths seen in Strava, good confidence about the path but less about the road - not many traces on the service road.
4672194
Category: unknown
1~ 11 months agoopenedjhaluska80
♦3,014
A second sinkhole formed on the West bound side closing I-80. I have added an estimated 4 month conditional tag. https://www.nj.com/morris/2025/03/new-sinkhole-opens-up-on-i-80-sparking-more-lane-closures.html
2~ 11 months agocommentedDawsZed
♦229
Found the state's own project website, it anticipates partial completion (2 lanes open) by Early/Mid May, with all lanes open by Late June: https://dot.nj.gov/transportation/commuter/roads/i80/
3~ 10 months agocommentedDawsZed
♦229
Recent DOT press release updates partial opening (2 lanes both ways) near mid/late May, all lanes open by June 25: https://dot.nj.gov/transportation/uploads/comm/news/details/comm_np_20250425_111919_I-80repairsprogressingslowerthanplannedinWharton.pdf
4~ 9 months agoclosedKJ Francis
♦2
NJDOT press release as of Friday 5/30, two lanes reopened, all lanes to reopen later this month https://dot.nj.gov/transportation/uploads/comm/news/details/comm_np_20250530_153944_I-80wbtwolanestoreopenat10p.m.tonightinWharton.pdf
4711836
Category: StreetComplete
1~ 10 months agoopenedCurlingMan13
♦52,478
Road is named "Rose Park Crescent" on this segment and the one straigh through T-intersection. via StreetComplete 60.3
2~ 10 months agoclosedDawsZed
♦229
Looks like jhaluska80 fixed this in Changeset 165003588 yesterday, closing this on their behalf
4607095
Category: unknown
1~ 1 year agoopenedCurlingMan13
♦52,478
Bus terminal needs more details and relations need to be properly applied.
2~ 10 months agocommentedDawsZed
♦229
Me and Sean P helped to detail the area and tag the building. Relations look good to me, comparing Main Street with the bus road through here, no routes seem missing between them. Not sure if the building and the terminal area should be part of the relations, but otherwise everything else looks good to go
3~ 10 months agoclosedCurlingMan13
♦52,478
Looks really good. Much more detailed than I was even planning to add. I just wanted to get the relations from Main Street fixed. Thanks. Might be more bus routes here, but that is beyond the scope of this note. Did add role=platform here though.
4584630
Category: unknown
1~ 1 year agoopenedDaitruxdd
♦145
Raritan River Drawbridge Replacement
2~ 1 year agocommentedCurlingMan13
♦52,478
yup. Construction is mapped.
3~ 1 year agocommentedCurlingMan13
♦52,478
Bridge supports added
4~ 1 year agocommentedCurlingMan13
♦52,478
added buildings and minor power lines on south side of river in construction zone.
5~ 1 year agocommentedCurlingMan13
♦52,478
Route relations will also need to be updated when bridge is finished.
6~ 1 year agocommentedCurlingMan13
♦52,478
Added bridge types to construction ways.
7~ 11 months agoclosedAlbert55
8~ 11 months agoreopenedDaitruxdd
♦145
9~ 11 months agocommentedCurlingMan13
♦52,478
User Albert55 was reported to DWG for closing notes and taking no action. Suspect vandalism.
10~ 10 months agocommentedDawsZed
♦229
Estimated completion (including demolition of the old bridge span) is Summer 2029, 4 years from now at best speed: https://www.nasdaq.com/articles/skanska-wins-421-mln-worth-raritan-river-bridge-replacement-contract-new-jersey
11~ 4 months agocommentedCurlingMan13
♦52,478
Providing intimate, play-by-play update as requested via note. Removed following tag as construction has since started: proposed:bridge=yes
4483808
Category: unknown
1~ 1 year agoopenedDawsZed
♦229
NAIP imagery shows entirely new roadway markings/striping here after tracing these roads just months ago, feeling like Sisyphus pushing a boulder right now
2~ 1 year agocommentedjhaluska80
♦3,014
Yeah, that's a major overhaul Just keep in mind not everything has to be done in a single change set. Just chip away at it. I have removed some of the jersey barriers that are no longer present in NAIP.
3~ 1 year agocommentedDawsZed
♦229
Thank you jhaluska80, I appreciate your help and advice
4~ 10 months agoclosedDawsZed
♦229
Seems like most stuff is updated from what I can see, no need for this note anymore, thank you again
4663247
Category: unknown
1~ 11 months agoopenedKayABC1
2~ 11 months agoclosedDawsZed
♦229
Hi KayABC, if there's any issues you've found at this location, feel free to reopen this note by adding a comment with more details. Otherwise, I'm resolving this note as unactionable for now.