OSM note activities of Jhynjhiruu for the last 12 months
Overall activities (12 months)
Opened: 2 (29%) Commented: 4 (57%) Closed: 0 (0%) Reopened: 1 (14%)
Stats per month
Latest activities
Latest activities | The colored events are made by Jhynjhiruu | Limit 500
Note#Tmstmp UTCEventContributorCommentAuto-translation
4608307
Category: unknown
12025-01-31 03:50openedJhynjhiruuLane here running parallel to Downend Road, between the houses and field, emerging next to house 147 and connecting to Dovercourt Road. Connects with the lane running parallel to Dovercourt Road, but not with October Lane.
22025-01-31 09:50commentedMex
♦7,118
added as a track does this match what you were describing?
32025-01-31 18:09commentedJhynjhiruuThat's approximately correct, though it's closer to the sheds - they have doors that open onto the lane. It's roughly the same type of surface as the lane parallel to Dovercourt Road.
42025-05-25 13:08closedSofia_111
♦112
I've changed the classification to alley. Also, the sheds don't open onto the lane, but to a small area of grass/hardstanding between them.
52025-05-25 16:30reopenedJhynjhiruu
62025-05-25 16:31commentedJhynjhiruuThey absolutely do open onto the lane, especially towards the Western end. I'm happy to take some photos if you want evidence.
72025-05-25 16:37closedSofia_111
♦112
I've moved the lane closer to the sheds.
381126212023-08-01 18:14openedDaveF
♦691
Works to stabilize the chocolate path. Unsure of extents. Requires on ground survey.
22025-01-31 03:41commentedJhynjhiruuPartial collapse of the river wall in 2020; chocolate path, trackbed and part of road fell into the river. All repaired, chocolate path and road reopened, rails still missing but trackbed re-ballasted.
32025-01-31 08:52commentedDaveF
♦691
Does the relaid track extend to Butterfly junction?
42025-01-31 18:07commentedJhynjhiruuNo, not yet. There's a work site (I think for the repairs to the river walls) in the way of the trackbed, and most of the rail in that area has been removed. The track directly connected to the shed (which is known as 'the Barn') is still in place, but it's substantially overgrown. Beyond the work site (starting near the traffic lights on the road branching off Cumberland Road) the ballast is in place, but no rail or sleepers. The platform is there, but not yet in the right place. If it's useful, I'll take some photos when I'm next there.
52025-06-23 14:57commentedmstrbrid
♦135
Believe this phase of works are complete. Vauxhall bridge works still underway
4608304
Category: unknown
12025-01-31 03:37openedJhynjhiruuThis point has been removed, and all of the track going behind M Shed has been filled in
22025-04-01 21:44closedIwerne
♦114
I've tagged the stretch as 'disused' for consistency with it's extension.
32025-04-01 21:44reopenedIwerne
♦114
42025-04-01 21:45closedIwerne
♦114