| Note | # | ⏱️ Last updated | Event | Contributor | Comment |
|---|---|---|---|---|---|
| 4572153 Category: unknown | 1 | ~ 1 year ago | opened | wardmuylaert ♦157 | The foot=no on Gershwin Drive sounds unlikely going by the changeset that introduced it ("The sides are fenced"). Perhaps there was construction or something happening? Either way, a lack of sidewalk does not mean foot=no in this country :) Survey to see what, if anything, is actually going on here. |
| 2 | ~ 1 year ago | commented | jhaluska80 ♦3,120 | Bing streetside, which I admit was captured before the access change, did not show anything about pedestrian road access. Since the change was made by a brand new mapper, I contend it's much more likely a small mistake to imply construction or to handle a temporary closure than something unique about this road. So in the mean time I have removed the access tag and updated the area to at least be up to date with the latest aerial. | |
| 3 | ~ 7 months ago | commented | dannmer ♦18,944 | Strava heat map shows plenty of pedestrian and bicycle traffic on the road that is tagged as under construction. | |
| 4 | ~ 7 months ago | closed | wardmuylaert ♦157 | Surveyed. Construction is indeed finished. Updated the map. | |
| 4518249 Category: unknown | 1 | ~ 1 year ago | opened | wardmuylaert ♦157 | According to https://www.chescoplanning.org/Transportation/cvt-ProjectStatus.cfm, the CVT is getting extended to the corporate center to the west (including a bridge over South Whitford Road) in "Fall 2024-Summer 2025". Keep an eye out for this actually happening. |
| 2 | ~ 7 months ago | commented | wardmuylaert ♦157 | Schedule was updated on that website: Schedule/Next Steps (Updated May 2025) (all timeframes are approximate based on current project understanding and are subject to change) January 2025: Project posted for public bid. June 2025: Start of construction. June 2025-April/May 2026: Construction | |
| 4925734 Category: unknown | 1 | ~ 7 months ago | opened | wardmuylaert ♦157 | This area of trees got cleared and it looks like something will be built here. Possibly an expansion of the Eagleview Landing retirement home |
| 4753901 Category: unknown | 1 | ~ 11 months ago | opened | wardmuylaert ♦157 | New building under construction, don't know the exact outline |
| 2 | ~ 9 months ago | commented | CurlingMan13 ♦52,632 | Do you know what the building is being used as? Apartments? Jail? Offices? Etc.? | |
| 3 | ~ 8 months ago | commented | wardmuylaert ♦157 | I think it'll be apartments, I see some parts that look like they will be balconies when I last ran by, but I can't say for sure yet | |
| 4794877 Category: unknown | 1 | ~ 10 months ago | opened | wardmuylaert ♦157 | The aerial for this is outdated. I think https://www.openstreetmap.org/way/1150849044 may no longer exist or at least connects differently. Would need a survey to check properly, didn't realise when running by how far from reality it seems it could be. |
| 4794876 Category: unknown | 1 | ~ 10 months ago | opened | wardmuylaert ♦157 | There are some trails here that you can access from the parking lot just north. There was also a sign telling MTB that (some of) the trails are closed. On Strava's heatmap I see some activity and a connection to the neighbourhood just south. |
| 4765226 Category: EveryDoor | 1 | ~ 10 months ago | opened | wardmuylaert ♦157 | Dog park in two parts. large dogs north, small dogs south. three portable toilets outside #EveryDoor |
| 2 | ~ 1 month ago | closed | John Kastner ♦331 | added | |
| 4753966 Category: unknown | 1 | ~ 11 months ago | opened | wardmuylaert ♦157 | There was a wooden bridge here _and_ a ford next to it. I don't know which was on which side any more. |
| 2 | ~ 11 months ago | closed | jhaluska80 ♦3,120 | I added both. Ford is a best guess based off the geometry and aerials. |