OpenStreetMap Note Activities of Kevin67 for the last 12 Months
Overall Activities | 12 Months
Opened: 18 (62%) Commented: 3 (10%) Closed: 8 (28%) Reopened: 0 (0%)
Stats per month
Latest | Limit 250
Latest | Limit 250 | The colored events are made by Kevin67
Note#⏱️ Last updatedEventContributorComment
5105000
Category: Unknown
1~ 3 months agoopenedKevin67
♦32
Gravel track is blocked due to work construction zone for Yarra Valley Water Love Branch Sewer works. Date of completion is said to be April 2026. Expected access after this date is unknown. https://www.yvw.com.au/faults-works/planned-works/works-my-area/love-branch-sewer-project
5005187
Category: Unknown
1~ 6 months agoopenedKevin67
♦32
Construction has commenced on the Upfield Bike Path connection between the end of Sages Road and the M80 Ring Road Trail. Alignment is unknown to this author, but construction can be seen and has been publicised.
2~ 4 months agocommentedtravaudat
♦44
Further details on https://transport.vic.gov.au/news-and-resources/projects/upfield-shared-use-path---extension-and-refurbishment-works
4894761
Category: unknown
1~ 8 months agoopenedKevin67
♦32
Previous roundabout has been replaced with a signalised cross road with slip lanes with yellow shared path crossings and with bicycle lanterns on shared path signalised crossings.
2~ 8 months agocommentedEwen Hill
♦7,541
Removed roundabout and simplified Mt Ridley Road. Couldn't really update the rest until new imagery. Thanks again
3~ 4 months agoclosedVadmium
♦591
Aligned and divided roads with Mapbox imagery. Added slip lanes so there are now three. Added surface-marked crossings on each slip lane. Added four signalized crossings with bicycle=yes for the main roads, assuming there are bike lanterns on all four crossings.
4894758
Category: unknown
1~ 8 months agoopenedKevin67
♦32
Shared Use Path (only partly signed) between Donnybrook Road and Mt Ridley Road crosses road in this location. To be added on side of road. Road alignment may be an issue.
2~ 7 months agoclosedEwen Hill
♦7,541
updated footpath the shared path and realigned slightly
4874302
Category: unknown
1~ 8 months agoopenedKevin67
♦32
Brossard Road, both sides, appears to be open up to this point, with separated bike and foot path along it.
2~ 8 months agoclosedEwen Hill
♦7,541
Updated and extended bike path. Updated imagery require to see what is happening overall
4874289
Category: unknown
1~ 8 months agoopenedKevin67
♦32
This road is open, for "left turn only" I believe.
2~ 8 months agoclosedEwen Hill
♦7,541
updated - I have made it left turn only INTO Mickleham road but allowed access into the road either way. I hope that is correct
4874288
Category: unknown
1~ 8 months agoopenedKevin67
♦32
Dryland Boulevard appears to be open, no barriers at all in the vicinity, drivers freely using it. Is it simply a matter of removing the "under construction" tag? Note there are also separated bike and foot paths along it (though a section of foot path is still missing).
2~ 8 months agoclosedEwen Hill
♦7,541
Thanks Kevin. I set Highway=tertiary and removed construction=tertiary. Will need updated imagery to update other details.
4783176
Category: unknown
1~ 10 months agoopenedKevin67
♦32
Intersection is being upgraded. Unknown design. Unknown finish date. Presently some obstructions for paths from construction activity.
2~ 8 months agoclosedKevin67
♦32
Completed. Raised platform intersection. Zebra crossings of two streets.
4838057
Category: unknown
1~ 9 months agoopenedKevin67
♦32
Cloverton Boulevard bridge includes paths.
2~ 9 months agoclosedEwen Hill
♦7,541
needs imagery to be updated
3~ 9 months agoreopenedEwen Hill
♦7,541
4~ 7 months agoclosedEwen Hill
♦7,541
Added paths from Strava Heat Map
4807899
Category: OsmAnd
1~ 10 months agoopenedKevin67
♦32
YVW Water Refill Station #OsmAnd
2~ 10 months agoclosedKevin67
♦32
POI added
4807903
Category: OsmAnd
1~ 10 months agoopenedKevin67
♦32
YVW Water Refill Station #OsmAnd
2~ 10 months agoclosedKevin67
♦32
POI added
4807902
Category: OsmAnd
1~ 10 months agoopenedKevin67
♦32
YVW Water Refill Station #OsmAnd
2~ 10 months agoclosedKevin67
♦32
POI added
4807904
Category: OsmAnd
1~ 10 months agoopenedKevin67
♦32
YVW Water Refill Station #OsmAnd
2~ 10 months agoclosedKevin67
♦32
POI added
4807901
Category: OsmAnd
1~ 10 months agoopenedKevin67
♦32
YVW Water Refill Station #OsmAnd
2~ 10 months agoclosedKevin67
♦32
POI added
4807905
Category: OsmAnd
1~ 10 months agoopenedKevin67
♦32
YVW Water Refill Station #OsmAnd
2~ 10 months agoclosedKevin67
♦32
POI added
4804417
Category: unknown
1~ 10 months agoopenedKevin67
♦32
School bus stop
2~ 7 months agocommentedEthan Grobin
♦141
Hello! I have added the bus stop. Do you have any more info on it? i.e. the operator, name , number and if it is also a public bus stop. Thank you
3~ 7 months agocommenteddanieldegroot2
♦2,460
The website states - "[Charter buses] operate between the areas of Pakenham and Cranbourne to our Junior School Officer site. A shuttle service operates each morning from the Officer site to the Endeavour Hills site, and each afternoon from the Endeavour Hills site to the Officer site." - "There are currently no PTV services to the Officer site.  PTV routes 926 and 928 stop at the Officer train station, which is within walking distance of the Officer site." https://www.maranatha.vic.edu.au/family-resources-hub/bus-information/
4~ 7 months agoclosedEthan Grobin
♦141
Thank you. I have added Ventura as the operator as it appears to be what they use.
4727041
Category: unknown
1~ 11 months agoopenedKevin67
♦32
Signalised staggered pedestrian crossing to be added on recently duplicated road with median strip. Nearby shared and bike paths on north side of road also require update .Cannot locate on provided satellite imagery.
2~ 11 months agocommentedKevin67
♦32
Updated and presently visible on Cycle Map layer.
3~ 10 months agoclosedKevin67
♦32
4757792
Category: unknown
1~ 11 months agoopenedKevin67
♦32
How to relocate this Marsden Walk path so it is the nearby shared path? This path (way:607278999) does not exist, though there are letter boxes on the property boundary for AusPost deliveries. It should be same as nearby Osborne Terrace (Way:58520137).
2~ 11 months agocommentedVadmium
♦591
In this case, I would take the relevant tags (especially name, foot, bicycle & segregated) from the path in the worse location, merge them into the path you want to keep, and then delete the other path. I’ll let you do it if you want, otherwise I’m happy to do it.
3~ 11 months agocommentedKevin67
♦32
Thanks. I'm happy for you to do it. Should be quick, then. Tags should not be a major concern, as the true shared path does already have relevant tags.
4~ 11 months agoclosedVadmium
♦591
Okay, merged in https://osm.org/changeset/166249692
4712887
Category: unknown
1~ 1 year agoopenedKevin67
♦32
Can someone please confirm the paths in this area, from Keilor Park Drive to the EJ Whitten Bridge. Suspicion is, ever since the M80 Trail was relaid/realigned navigation aids are wrong. Also confusing on a 2D map to note which trails go down to the river.
2~ 1 year agocommentedKevin67
♦32
Partly improved by changing Relations. A realigned fence line still needs to be added.
3~ 11 months agocommentedEwen Hill
♦7,541
Having a look at Strava heat map, this looks exact apart from a small unpaved curved path that looks unofficial but is used that I added just north of this note. It can take some time for navigation systems to pick up the changes.
4~ 11 months agocommentedKevin67
♦32
The simple Strava Global Heatmap however does not differentiate between types of bikes of the riding style. I'm hoping that the downhill gravel section could be kept for MTB, gravel bikes, and other "rough" types of riding, while road bikes and similar would be routed around through the main Brimbank Park. Is it "tags" that helps app algorithms to plot a suitable route?
5~ 9 months agoclosedEwen Hill
♦7,541
added mtb=single track to the short cut hopefully that will keep us road cyclists clear. Thanks Kevin67