| Note | # | ⏱️ Last updated | Event | Contributor | Comment |
|---|---|---|---|---|---|
| 5105000 Category: Unknown | 1 | ~ 3 months ago | opened | Kevin67 ♦32 | Gravel track is blocked due to work construction zone for Yarra Valley Water Love Branch Sewer works. Date of completion is said to be April 2026. Expected access after this date is unknown. https://www.yvw.com.au/faults-works/planned-works/works-my-area/love-branch-sewer-project |
| 5005187 Category: Unknown | 1 | ~ 6 months ago | opened | Kevin67 ♦32 | Construction has commenced on the Upfield Bike Path connection between the end of Sages Road and the M80 Ring Road Trail. Alignment is unknown to this author, but construction can be seen and has been publicised. |
| 2 | ~ 4 months ago | commented | travaudat ♦44 | Further details on https://transport.vic.gov.au/news-and-resources/projects/upfield-shared-use-path---extension-and-refurbishment-works | |
| 4894761 Category: unknown | 1 | ~ 8 months ago | opened | Kevin67 ♦32 | Previous roundabout has been replaced with a signalised cross road with slip lanes with yellow shared path crossings and with bicycle lanterns on shared path signalised crossings. |
| 2 | ~ 8 months ago | commented | Ewen Hill ♦7,541 | Removed roundabout and simplified Mt Ridley Road. Couldn't really update the rest until new imagery. Thanks again | |
| 3 | ~ 4 months ago | closed | Vadmium ♦591 | Aligned and divided roads with Mapbox imagery. Added slip lanes so there are now three. Added surface-marked crossings on each slip lane. Added four signalized crossings with bicycle=yes for the main roads, assuming there are bike lanterns on all four crossings. | |
| 4894758 Category: unknown | 1 | ~ 8 months ago | opened | Kevin67 ♦32 | Shared Use Path (only partly signed) between Donnybrook Road and Mt Ridley Road crosses road in this location. To be added on side of road. Road alignment may be an issue. |
| 2 | ~ 7 months ago | closed | Ewen Hill ♦7,541 | updated footpath the shared path and realigned slightly | |
| 4874302 Category: unknown | 1 | ~ 8 months ago | opened | Kevin67 ♦32 | Brossard Road, both sides, appears to be open up to this point, with separated bike and foot path along it. |
| 2 | ~ 8 months ago | closed | Ewen Hill ♦7,541 | Updated and extended bike path. Updated imagery require to see what is happening overall | |
| 4874289 Category: unknown | 1 | ~ 8 months ago | opened | Kevin67 ♦32 | This road is open, for "left turn only" I believe. |
| 2 | ~ 8 months ago | closed | Ewen Hill ♦7,541 | updated - I have made it left turn only INTO Mickleham road but allowed access into the road either way. I hope that is correct | |
| 4874288 Category: unknown | 1 | ~ 8 months ago | opened | Kevin67 ♦32 | Dryland Boulevard appears to be open, no barriers at all in the vicinity, drivers freely using it. Is it simply a matter of removing the "under construction" tag? Note there are also separated bike and foot paths along it (though a section of foot path is still missing). |
| 2 | ~ 8 months ago | closed | Ewen Hill ♦7,541 | Thanks Kevin. I set Highway=tertiary and removed construction=tertiary. Will need updated imagery to update other details. | |
| 4783176 Category: unknown | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | Intersection is being upgraded. Unknown design. Unknown finish date. Presently some obstructions for paths from construction activity. |
| 2 | ~ 8 months ago | closed | Kevin67 ♦32 | Completed. Raised platform intersection. Zebra crossings of two streets. | |
| 4838057 Category: unknown | 1 | ~ 9 months ago | opened | Kevin67 ♦32 | Cloverton Boulevard bridge includes paths. |
| 2 | ~ 9 months ago | closed | Ewen Hill ♦7,541 | needs imagery to be updated | |
| 3 | ~ 9 months ago | reopened | Ewen Hill ♦7,541 | ||
| 4 | ~ 7 months ago | closed | Ewen Hill ♦7,541 | Added paths from Strava Heat Map | |
| 4807899 Category: OsmAnd | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | YVW Water Refill Station #OsmAnd |
| 2 | ~ 10 months ago | closed | Kevin67 ♦32 | POI added | |
| 4807903 Category: OsmAnd | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | YVW Water Refill Station #OsmAnd |
| 2 | ~ 10 months ago | closed | Kevin67 ♦32 | POI added | |
| 4807902 Category: OsmAnd | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | YVW Water Refill Station #OsmAnd |
| 2 | ~ 10 months ago | closed | Kevin67 ♦32 | POI added | |
| 4807904 Category: OsmAnd | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | YVW Water Refill Station #OsmAnd |
| 2 | ~ 10 months ago | closed | Kevin67 ♦32 | POI added | |
| 4807901 Category: OsmAnd | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | YVW Water Refill Station #OsmAnd |
| 2 | ~ 10 months ago | closed | Kevin67 ♦32 | POI added | |
| 4807905 Category: OsmAnd | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | YVW Water Refill Station #OsmAnd |
| 2 | ~ 10 months ago | closed | Kevin67 ♦32 | POI added | |
| 4804417 Category: unknown | 1 | ~ 10 months ago | opened | Kevin67 ♦32 | School bus stop |
| 2 | ~ 7 months ago | commented | Ethan Grobin ♦141 | Hello! I have added the bus stop. Do you have any more info on it? i.e. the operator, name , number and if it is also a public bus stop. Thank you | |
| 3 | ~ 7 months ago | commented | danieldegroot2 ♦2,460 | The website states - "[Charter buses] operate between the areas of Pakenham and Cranbourne to our Junior School Officer site. A shuttle service operates each morning from the Officer site to the Endeavour Hills site, and each afternoon from the Endeavour Hills site to the Officer site." - "There are currently no PTV services to the Officer site. PTV routes 926 and 928 stop at the Officer train station, which is within walking distance of the Officer site." https://www.maranatha.vic.edu.au/family-resources-hub/bus-information/ | |
| 4 | ~ 7 months ago | closed | Ethan Grobin ♦141 | Thank you. I have added Ventura as the operator as it appears to be what they use. | |
| 4727041 Category: unknown | 1 | ~ 11 months ago | opened | Kevin67 ♦32 | Signalised staggered pedestrian crossing to be added on recently duplicated road with median strip. Nearby shared and bike paths on north side of road also require update .Cannot locate on provided satellite imagery. |
| 2 | ~ 11 months ago | commented | Kevin67 ♦32 | Updated and presently visible on Cycle Map layer. | |
| 3 | ~ 10 months ago | closed | Kevin67 ♦32 | ||
| 4757792 Category: unknown | 1 | ~ 11 months ago | opened | Kevin67 ♦32 | How to relocate this Marsden Walk path so it is the nearby shared path? This path (way:607278999) does not exist, though there are letter boxes on the property boundary for AusPost deliveries. It should be same as nearby Osborne Terrace (Way:58520137). |
| 2 | ~ 11 months ago | commented | Vadmium ♦591 | In this case, I would take the relevant tags (especially name, foot, bicycle & segregated) from the path in the worse location, merge them into the path you want to keep, and then delete the other path. I’ll let you do it if you want, otherwise I’m happy to do it. | |
| 3 | ~ 11 months ago | commented | Kevin67 ♦32 | Thanks. I'm happy for you to do it. Should be quick, then. Tags should not be a major concern, as the true shared path does already have relevant tags. | |
| 4 | ~ 11 months ago | closed | Vadmium ♦591 | Okay, merged in https://osm.org/changeset/166249692 | |
| 4712887 Category: unknown | 1 | ~ 1 year ago | opened | Kevin67 ♦32 | Can someone please confirm the paths in this area, from Keilor Park Drive to the EJ Whitten Bridge. Suspicion is, ever since the M80 Trail was relaid/realigned navigation aids are wrong. Also confusing on a 2D map to note which trails go down to the river. |
| 2 | ~ 1 year ago | commented | Kevin67 ♦32 | Partly improved by changing Relations. A realigned fence line still needs to be added. | |
| 3 | ~ 11 months ago | commented | Ewen Hill ♦7,541 | Having a look at Strava heat map, this looks exact apart from a small unpaved curved path that looks unofficial but is used that I added just north of this note. It can take some time for navigation systems to pick up the changes. | |
| 4 | ~ 11 months ago | commented | Kevin67 ♦32 | The simple Strava Global Heatmap however does not differentiate between types of bikes of the riding style. I'm hoping that the downhill gravel section could be kept for MTB, gravel bikes, and other "rough" types of riding, while road bikes and similar would be routed around through the main Brimbank Park. Is it "tags" that helps app algorithms to plot a suitable route? | |
| 5 | ~ 9 months ago | closed | Ewen Hill ♦7,541 | added mtb=single track to the short cut hopefully that will keep us road cyclists clear. Thanks Kevin67 |