OpenStreetMap Note Activities of ChrisHodgesUK for the last 12 Months
Overall Activities | 12 Months
Opened: 0 (0%) Commented: 2 (100%) Closed: 0 (0%) Reopened: 0 (0%)
Stats per month
Latest | Limit 250
Latest | Limit 250 | The colored events are made by ChrisHodgesUK
Note#⏱️ Last updatedEventContributorComment
4679713
Category: unknown
1~ 1 year agoopenedspark
♦146
This bridge has now been demolished, would be good for a local mapper to verify what the state is. https://www.bbc.com/news/articles/c4ger4j2vy7o
2~ 1 year agocommentedFlynn_
♦200
The bridge is gone, it's still a construction site on the embankments either side of the motorway. Might still need resurvey further in the future.
3~ 10 months agocommentedChrisHodgesUK
♦29
Will definitely need a new survey but not until spring 2026. Cycleways and crossings will need surveying in detail as the layout will be new. Basic structure is now in place
4~ 5 months agocommentedswinetown
♦238
Now scheduled to open on 19 June 2026 to pedestrians and cyclists, and 20 June for motor traffic. https://www.bbc.co.uk/news/articles/cewplve9ndpo From what I could see from the train passing over Badminton Road (north of here), there's a new cycle path up to at least Coalpit Heath, probably linking with the existing cycle path to Yate.
5~ 5 months agocommentedChrisHodgesUK
♦29
The bike path will indeed run from the ring road to meet the one to Yate. Sections of it are almost finished and have at time been ridable, but aren't really open yet. the section running through most of Coalpit Heath hasn't been started yet. I ride around the area quite a lot so will try to gather info while I'm passing anyway, once things are more open
6~ 3 months agocommentedmstrbrid
♦172
Confirmed re-opened. Bicycles only permitted on the E pavement North of the Cuckoo lane crossing
7~ 2 months agoclosedsouthglos
♦529