Note#⏱️ Last updatedEventContributorComment
4761312
Category: unknown
1~ 11 months agoopenedCycleAlex
♦53
Lawnmarket and Castlehill will be pedestrianised on an experimental basis once the ongoing resurfacing has completed. An ETRO will be promoted to restrict motor vehicle access during: 10.30am and 7.30pm, Monday to Saturday 12.30pm and 7.30pm, Sunday https://www.edinburgh.gov.uk/public-transport/lawnmarket-restricting-vehicle-access
2~ 9 months agocommentedosmuser63783
♦1,294
Lawnmarket remains closed to (motor) traffic until 7 September ("Summertime Streets") Then the ETRO is expected to be in place I guess this will apply equally to Castlehill - see https://www.openstreetmap.org/note/4620870
3~ 9 months agocommentedosmuser63783
♦1,294
Since it's pedestrianised now, and won't reopen after the festival period except at night, I have changed it to highway=pedestrian. I have also downgraded Johnston Terrace and Spittal Street to reflect that this is no longer a through route. Keeping the note open to remember to check and update this area again when the permanent layout is in place (the conditional restrictions will need updating, and Upper Bow also needs checking)
4~ 8 months agocommentedosmuser63783
♦1,294
Roadworks here are scheduled to complete around the end of October, that would be a good time for a survey to see what the permanent set up looks like (also for the lanes and access tags on Johnston Terrace)
5~ 5 months agoclosedosmuser63783
♦1,294
The situation is still a bit confusing but I think I've mapped it as well as possible
4761311
Category: unknown
1~ 11 months agoopenedCycleAlex
♦53
Leith Connections is currently under construction here, involving a segregated cycleway from Foot of the Walk to Dock Street. Estimated completion is Summer 25, although Great Junction Street looks close to completion now.
2~ 3 months agocommentedjayaddison
♦222
The cycleway is now open and has been retagged in OSM. I think a few small adjustments could be required on the south side of the Sandport Bridge so that the ways more accurately describe the road crossings (or absence of).
3~ 3 months agocloseddrnoble
♦3,050
I've tried to refine the section at Sandport Bridge, I think this note can be closed as this section is mapped correctly