OSM note activities of Darac Marjal for the last 12 months
Overall activities (12 months)
Opened: 7 (54%) Commented: 0 (0%) Closed: 6 (46%) Reopened: 0 (0%)
Stats per month
Latest activities
Latest activities | The colored events are made by Darac Marjal | Limit 500
Note#Tmstmp UTCEventContributorCommentAuto-translation
4927227
Category: CoMaps
12025-08-24 12:10openedDarac Marjal
♦64
"Pill Box" OSM snapshot date: 2025-07-13T12:01:25Z POI has no name POI types: historic-ruins #CoMaps android
22025-08-24 12:21closedRedAuburn
♦5,668
fixed thanks
4927046
Category: CoMaps
12025-08-24 11:13openedDarac Marjal
♦64
"Pill Box" OSM snapshot date: 2025-07-13T12:01:25Z POI has no name POI types: historic-ruins #CoMaps android
22025-08-24 12:20closedRedAuburn
♦5,668
tagged thanks
4606025
Category: StreetComplete
12025-01-29 08:37openedDarac Marjal
♦64
Bee hotel via StreetComplete 60.1
22025-08-16 13:42closedDarac Marjal
♦64
4900494
Category: StreetComplete
12025-08-09 12:13openedDarac Marjal
♦64
Wheelchair lift via StreetComplete 61.2
22025-08-16 13:40closedDarac Marjal
♦64
4811388
Category: StreetComplete
12025-06-18 11:23openedDarac Marjal
♦64
Wooden bridge. Max weight 2 tonnes via StreetComplete 61.1
22025-06-18 11:46closedDarac Marjal
♦64
4811387
Category: StreetComplete
12025-06-18 11:22openedDarac Marjal
♦64
Paving slabs path via StreetComplete 61.1 GPS Trace: https://www.openstreetmap.org/user/Darac%20Marjal/traces/12003593
22025-06-18 11:46closedDarac Marjal
♦64
4619990
Category: unknown
12025-02-08 21:56openedDarac Marjal
♦64
Is this section of Guildford Road intended to remain as A323, or is Stonehill Road to be designated A323?
22025-02-09 12:15closedDarac Marjal
♦64
Signage on site points the A323 over the bridge
4524419
Category: unknown
12024-11-18 13:20openedPoppacNew roundabout giving access to new bridge over railway and route to Guildford Road/Stonehill Road roundabout. Opening 23/11/24 and closing level crossing.
22025-02-08 22:00closedDarac Marjal
♦64
Looks like this is now essentially there. The opening was delayed a few months (extra safety checks on the bridge), but the roundabout has now been mapped. More detail will follow as the road works get finished.